Loading...
HomeMy WebLinkAboutC7.50_Drainage & Utility Plan Details CLM TOP OF BASIN ELEVATION PER PLANS TRAFFIC-RATED AND Q ADA-COMPLIANT GRATED LID CURB AND SIDEWALK PER PLANS HYDROSEED IN EXPOSED AREAS W Z O BASIN SLOPES 4:1 MAX(TYP) p pm FINISH GRADE INFILTRATION BASIN PER PLANS BASIN SLOPES J 44 WATER SURFACE LEVEL (6) - 18"x 24" KNOCKOUT PANELS TOP OF BASIN 4:1 MAX(TYP) (2X) 1 EACH SIDE 0.5'FREEBOARD GRADE TO DRAIN INLET LOCATION PER PLAN. PERVIOUS AREA-WIDTH PER PLANS (4x) 2 EACH SIDE mow* �' �/ BASIN BOTTOM LEVEL / / / - /�\ \ REFER TO DRAINAGE PLAN SEE NOTE 1 8'-10-1/2" - - - - - - - (1) -8 0 PVC THRU BAFFLE WALL ___ _ / \\ \\ �\\�\\� _ _ _ _ -, kir, \\� (1) -24"(0 HOLE THRU FOR MANHOLE FOR ACCESS. INSTALL STAINLESS \/ \ - - - - - _ __ ______ / /\� ACCESS. SEE NOTES 1 AND 2 PLAN STEEL MECHANICAL PLUG. NOTES: /\�\\\ \/ \\ _� �_� �_� �_� �_� _ / BOTTOM OF BASIN �/ \ / III-III-III-III-III-III- / 1. ALL HOLES FOR INLET/OUTLET PIPES SHALL BE CORE AMENDED NATIVE MATERIAL WITH DRILLED. PROVIDE A FLEXIBLE MANHOLE VEGETATION PER ACHD BMP 10. i\\\ N CONNECTOR (KOR-N-SEAL OR APPROVED ;,foi INFILTRATION WINDOW PER PLANSA A SUBSTITUTION).2. PROVIDE STANDARD MANHOLE FRAME COVER AND \\ # To r RISER PER ISPWC SD-617. CONSTRUCT CONCRETE � \/ \\/\� / / / NATIVE FREE DRAINING MATERIAL 0 0 COLLAR PER ISPWC SD-616. i\/ /'/ / LU /�\/ /�/�\ \ M +I AMENDED NATIVE MATERIAL WITH 3. COORDINATE WITH SITE GRADING AND DRAINAGE /\/�\\\ \� \\\\\/ ��/i\\i\ SEASONAL HIGH GROUND WATER BOTTOM OF BASIN ELEVATION PER PLANS LID o it \\� / � VEGETATION PER ACHD BMP 10. 8-IN PVC PIPE PLAN FOR LOCATIONS OF GRATED INLETS. < z z NOTES: x w m IE OUT PER PLANS 1. THE USE OF SILTY LOAM IS PROHIBITED FROM USE AS BASIN BOTTOM MATERIAL. o NATIVE FREE DRAINING MATERIAL 2. DO NOT COMPACT BASIN AREA WITH HEAVY EQUIPMENT. NOTES: 3. INFILTRATION WINDOW DIMENSIONS ARE DIFFERENT FOR EACH BASIN. SEE PLANS FOR NOTES: 1. INSTALL STANDARD MANHOLE FRAME, COVER AND GRATED LID. CONSTRUCT CONCRETE SECTION pp (1) -8"0 PVC THRU BAFFLE WALL SIZES AND LOCATIONS. 1. COMPACTION OF THE SWALE BASIN SHALL BE AVOIDED. IN FOR ACCESS. INSTALL STAINLESS INLET SIZE AND LOCATION VARY. (2) 24"0 HOLE THRU FOR MANHOLE 4. EXTEND INFILTRATION WINDOW AT LEAST 1-FT INTO NATIVE FREE DRAINING MATERIAL. THE EVENT OF COMPACTION BY HEAVY EQUIPMENT,THE COLLAR PER ISPWC SD 616. STEEL MECHANICAL PLUG. REFER TO DRAINAGE PLAN (TYP.ALL) ACCESS. SEE NOTES 2 AND 3 SWALE BASIN SHALL BE TILLED TO ALLOW INFILTRATION. PLAN Infiltration Basin 3 Temporary AND Drainage Basin 4 Idaho Precast 350-Gal Sand & Grease Trap ZScale: NTS Scale: NTS Scale: NTS 9 IE IN IE OUT LD PER PLANS PER PLANS M o BASIN SLOPES 4:1 MAX(TYP) CD J •• • OUTLET 50 •• BAFFLE FINISH GRADE .• INLET "' BAFFLE • ' �� % / 2 BASIN INFILTRATION MEDIA: 12" DEPTH OF • / / / / // �� ASTM C-33 FILTER SAND • �\/ \/\\\ / /�\ PER ISPWC SECTION 801. 8'-10" LO 4-10 \��\�\ EXCAVATE 12 (MIN) INTO SUMP ELEVATION PER PLANS \ o 0 0 / NATIVE SOIL. BACKFILL WITH 6"-MINUS PITRUN SECTION AA PROFILE /�/� /\j` PER ISPWC SECTION 801. NATIVE FREE DRAINING MATERIAL 1000 Gal. S/G Trap Per AND BMP 01 & ISPWC SD-624 Scale: NTS NOTES: 1. THE USE OF SILTY LOAM IS PROHIBITED FROM USE AS BASIN BOTTOM MATERIAL. 2. DO NOT COMPACT BASIN AREA WITH HEAVY EQUIPMENT. 3. INFILTRATION WINDOW DIMENSIONS ARE DIFFERENT FOR EACH BASIN. SEE PLANS FOR SIZES AND LOCATIONS. Structure Table Infiltration Swale STRUCTURE NAME STRUCTURE DETAILS Scale: NTS RIM: 2545.07 SGT 2.0 SUMP: 2541.32 INV OUT: 2543.32 (E) RIM: 2549.38 SUMP: 2544.89 SGT 1.3 INV IN: 2546.22 (E) r INV OUT: 2545.89 (W) RIM: 2548.99 Ca SDCB 1.3.1 SUMP: 2545.30 INV OUT: 2546.30 (W) Cc MIJ RIM: 2548.88 MIJ SDCB 1.3 SUMP: 2545.24 INV IN: 2546.24 (E) O RIM: 2548.83 SGT 1.5 SUMP: 2544.43 cc INV IN: 2545.76 (E) INV OUT: 2545.43 (W) RIM: 2548.83 SGT 1.4 SUMP: 2544.44 INV IN: 2545.77 (E) O INV OUT: 2545.44 (W) RIM: 2548.78 ■ SGT 1.6 SUMP: 2544.38 INV IN: 2545.71 E ( ) INV OUT: 2545.38 (W) RIM: 2548.34 CA � O SDCB 1.5.1 SUMP: 2544.83 INV OUT: 2545.83 (W) RIM: 2548.34 CO SDCB 1.5 SUMP: 2544.78 mime cM M INV IN: 2545.78 (E) O0 INV OUT: 2545.78 (W) M RIM: 2548.34 Lo SUMP: 2544.78 SDCB 1.4 Cc INV OUT: 2545.78 (W) RIM: 2548.34 Revisions SDCB 1.4.1 SUMP: 2544.84 INV OUT: 2545.84 (W) 1. 5/30/25-CITY FP COMMENTS RIM: 2548.29 SDCB 1.6.1 SUMP: 2544.78 INV OUT: 2545.78 (W) RIM: 2548.29 SDCB 1.6 SUMP: 2544.72 INV IN: 2545.72 (E) INV OUT: 2545.72 (W) AL 568 J.^ 05/30/2025 3 V� qTE OF \10 f9�ESW.G Project No.: 123200 5 Date of Issuance: 4.15.2025 Project Milestone: Permit Set Drainage & Utility Plan Details i 3 c Mg s C711111111150 'r if_-o