Loading...
HomeMy WebLinkAboutC7.01_Drainage & Utility Plan Drainage and Utility Data Infiltration Basin Summary (ACHD BMP 10) DESIGN INFILTRATION OBSERVED SEASONAL ESTIMATED MAXIMUM Q TOP AREA EFFECTIVE DEPTH TOP ELEVATION OF BOTTOM ELEVATION OF WATER SURFACE RATE NEAREST TEST PIT (sq.ft) BOTTOM AREA (sq.ft) (ft) HIGH GROUNDWATER BASIN BASIN ELEVATION (100-YR (in/hr) ELEVATION STORM) W Z O BASIN 1 2.00 6 937.99 141.45 2 2542.56 2548.32 2545.82 2547.82 BASIN 2 1.00 16 1970.18 407.75 2 2542.34 2547.86 2545.36 2547.36 BASIN 3 1.00 16 1239.18 329.97 2 2542.25 2547.85 2545.35 2547.35 BASIN 4 1.00 23 1567.98 435.62 2 2542.25 2547.80 2545.30 2547.30 Permeable Interlocking Concrete Paver (PICP) Summary (ACHD BMP 34) DESIGN INFILTRATION OBSERVED SEASONAL PAVER AREA RUNOFF VOLUME TOP OF PAVER TOP OF STORAGE BOTTOM OF STORAGE DEPTH OF STORAGE RATE NEAREST TEST PIT (sq.ft) (cu.ft.) HIGH GROUNDWATER ELEVATION ELEVATION ELEVATION (ft) (in/hr) ELEVATION AREA 5 1.00 16 2173.51 990 2542.02 2546.77 2546.27 2545.02 1.25 AREA 6 0.80 11 4330.69 2258 2542.11 2546.94 2546.44 2545.11 1.33 AREA 7 1.00 21 5996.18 1751 2541.92 2546.25 2545.75 2544.92 0.83 AREA 8 1.00 21 2826.94 1516 2541.18 2546.18 2545.68 2544.18 1.50 AREA 9 1.00 21 2826.94 1567 2540.66 2545.66 2545.16 2543.66 1.50 AREA 10 1.00 20 3828.78 2307 2540.00 2545.08 2544.58 2543.00 1.58 AREA 11 1.00 13 4087.39 2959 2538.62 2543.95 2543.45 2541.62 1.83 AREA 12 1.00 13 4378.54 3111 2537.68 2543.01 2542.51 2540.68 1.83 AREA 13 1.00 17 3798.68 2704 2536.6 2541.93 2541.43 2539.60 1.83 AREA 14 1.00 17 5468.37 3094 2535.96 2541.04 2540.54 2538.96 1.58 AREA 15 1.00 9 3828.61 2593 2536.60 2541.93 2541.43 2539.60 1.83 AREA 16 1.00 13 3082.38 2005 2537.22 2542.55 2542.05 2540.22 1.83 AREA 17 1.00 13 2829.99 1713 2538.19 2543.27 2543.49 2541.91 1.58 AREA 18 1.00 3 3669.30 2105 2539.41 2544.49 2543.99 2542.41 1.58 AREA 19 0.75 10 7568.36 2979 2540.45 2545.62 2545.12 2543.45 1.67 AREA 20 1.00 16 5152.68 3971 2543.20 2548.53 2548.03 2546.20 1.83 Depth to Seasonal Groundwater DATE MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 MW-8 MW-9 MW-10 NOTES EG: 2543.32 EG: 2537.58 EG: 2541.87 EG: 2546.20 EG: 2541.63 EG: 2540.00 EG: 2542.41 EG: 2543.60 EG: 2544.54 EG: 2549.60 11/28/2023 8.5 FT 10.0 FT 8.0 FT 9.0 FT 8 FT 10.0 FT 8.0 FT 10.0 FT 8.0 FT 9.0 FT (2534.82) (2527.58) (2533.87) (2537.20) (2533.63) (2530.00) (2534.41) (2533.60) (2536.54) (2540.60) 12/27/2023 8.2 FT N/A 5.2 FT 7.7 FT 6.5 FT 7.2 FT 5.6 FT 6.4 FT 6.3 FT 7.6 FT TP-2 CLOGGED WITH (2535.12) (2536.67) (2538.50) (2535.13) (2532.80) (2536.81) (2537.20) (2538.24) (2542.00) SOIL 2/23/2024 7.7 FT 7.4 FT 4.7 FT 7.1 FT 5.8 FT 6.4 FT 4.6 FT 5.8 FT 5.6 FT 6.9 FT TP-REPAIRED/CLEANED (2535.62) (2530.18) (2537.17) (2539.10) (2535.83) (2533.60) (2537.81) (2537.80) (2538.94) (2542.70) OUT 3/21/2024 8.0 FT 8.0 FT 5.0 FT 7.4 FT 6.1 FT 7.0 FT 5.0 FT 6.2 FT 6.0 FT 7.3 FT (2535.32) (2529.58) (2536.87) (2538.80) (2535.53) (2533.00) (2537.41) (2537.40) (2538.54) (2542.30) 4/23/2024 7.0 FT 6.9 FT N/A 5.2 FT 5.5 FT 5.5 FT 3.8 FT 3.2 FT 5.0 FT 5.9 FT (2536.32) (2530.68) (2541.00) (2536.13) (2534.50) (2538.61) (2540.40) (2539.54) (2543.70) 5/9/2024 6.8 FT 7.2 FT 4.4 FT 6.1 FT 5.6 FT 6.2 FT 3.6 FT 4.5 FT 4.5 FT 4.9 FT (2536.52) (2530.38) (2537.47) (2540.10) (2536.03) (2533.80) (2538.81) (2539.10) (2540.04) (2544.70) 5/23/2024 5.8 FT 7.8 FT 4.3 FT 5.6 FT 5.2 FT 4.3 FT 3.3 FT 4.6 FT 5.4 FT 4.1 FT (2537.52) (2529.78) (2537.57) (2540.60) (2536.43) (2535.70) (2539.11) (2539.00) (2539.14) (2545.50) r 6/10/2024 6.1 FT N/A 4.2 FT 5.5 FT 5.3 FT 5.1 FT N/A 4.7 FT 5.6 FT 4.9 FT TP-2 AND TP-7 MISSING (2537.22) (2537.67) (2540.70) (2536.33) (2534.90) (2538.90) (2538.94) (2544.70) 6/24/2024 6.5 FT N/A 4.3 FT 5.5 FT 5.5 FT 5.8 FT N/A 4.7 FT N/A 4.6 FT //� (2536.82) (2537.57) (2540.70) (2536.13) (2534.20) (2538.90) (2545.00) Cu7/12/2024 6.6 FT N/A 4.5 FT 5.7 FT 5.8 FT 6.2 FT 3.6 FT 4.7 FT 5.6 FT 4.3 FT (2536.72) (2537.37) (2540.50) (2535.83) (2533.80) (2538.81) (2538.90) (2538.94) (2545.30) 7/25/2024 6.6 FT N/A 4.7 FT 5.8 FT 5.0 FT 6.6 FT 4.7 FT 4.6 FT 5.8 FT 5.7 FT O (2536.72) (2537.17) (2540.40) (2536.63) (2533.40) (2537.71) (2539.00) (2538.74) (2543.90) 8/13/2024 5.6 FT 6.8 FT 4.7 FT N/A 4.6 FT 5.9 FT 4.0 FT 3.9 FT 5.0 FT 4.9 FT TP-4 MISSING (2537.72) (2530.78) (2537.17) (2537.03) (2534.10) (2538.41) (2539.70) (2539.54) (2544.70) cu 8/28/2024 5.8 FT N/A 4.7 FT 6.9 FT 6.1 FT N/A 4.6 FT 4.0 FT 5.3 FT 5.1 FT TP-2 MISSING/DAMAGED, (2537.52) (2537.17) (2539.30) (2535.53) (2537.81) (2539.60) (2539.24) (2544.5) TP-6 CLOGGED O - 9/13/2024 5.2 FT 6.1 FT 4.2 FT 7.0 FT 5.7 FT 5.3 FT 4.4 FT 3.8 FT 5.1 FT 4.9 FT ALL PIEZOMETERS (2538.12) (2531.48) (2537.67) (2539.20) (2535.93) (2534.70) (2538.01) (2539.80) (2539.44) (2544.7) LOCATED/REPAIRED ■�/� 5.5 FT 5.8 FT 6.1 FT 4.9 FT 4.4 FT 4.0 FT 5.3 FT TP-9 PIEZOMETER ■ O 9/25/2024 (2537.82) (2531.78) N/A (2540.10) (2536.73) N/A (2538.01) (2539.60) N/A (2544.30) DAMAGED BEYOND REPAIR 10/7/2024 4.6 FT 5.8 FT 4.4 FT 6.4 FT 5.7 FT 4.0 FT N/A 4.0 FT N/A 5.1 FT TP-7 MISSING/DAMAGED (2538.72) (2531.78) (2537.47) (2539.80 (2535.93) (2536.00) (2539.60) (2544.50) 10/31/2024 6.4 FT 7.0 FT 5.1 FT 7.2 6.0 FT 6.7 FT 5.0 FT 6.0 FT N/A 6.0 FT TP-7 REPAIRED (2536.92) (2530.58) (2536.77) (2539.00) (2535.63) (2533.30) (2537.41) (2537.60) (2543.60) O 7.3 FT 7.6 FT 5.6 FT 7.5 FT 7.3 FT 7.2 FT 6.2 FT 6.0 FT 11/25/2024 (2536.02) (2529.98) (2536.27) (2538.70 (2534.33) (2532.80) N/A N/A (2537.40) (2543.60) NOTE: SEE GEOTECHNICAL REPORT NO. 2827-ID FROM GEOTEK INC. DATED MARCH 19, 2025 AND GEOTECHNICAL REPORT NO.321026 FROM INNOVATE GEOTECHNICAL DATED MAY 12, 2021. �+ M M � 00 ANN ~ i Revisions 1. 5/30/25-CITY FP COMMENTS AL 01 568 J�X05/30/2025 �O z qT E OF \�P 3 f9�ES W.G Project No.: 123200 Date of Issuance: 4.15.2025 Project Milestone: Permit Set Drainage & Utility Plan Drainage and Utility Data 3 0 C7mOl