Loading...
HomeMy WebLinkAboutC6.11_Sewer Plan & Profile W. Torana St. Sheet Notes: 1. COMPLY WITH ALL NOTES ON SHEET C1.00. Q 2. ALL CONSTRUCTION AND MATERIAL SHALL BE IN ACCORDANCE WITH THE O LATEST EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), CITY OF MERIDIAN STANDARDS, AND ADA COUNTY HIGHWAY DISTRICT STANDARDS. NO EXCEPTIONS ARE PERMITTED WITHOUT PRIOR APPROVAL. 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL COMPLY WITH IDAHO CODE, CHAPTER 22,TITLE 55 REGARDING UNDERGROUND FACILITIES DAMAGE PREVENTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED AS A RESULT OF FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANIES OR DIG-LINE (208.342.1585) FOR EXACT LOCATIONS A MINIMUM OF 48-HOURS PRIOR TO DIGGING. 4. CONTRACTOR TO FIELD VERIFY ALL EXISTING CURB AND GUTTER, STORM DRAIN, CHANNEL CROSSINGS, AND SEWER ELEVATIONS OR INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER WHEN ELEVATIONS OR INVERTS DO NOT MATCH PLANS. 5. ALL PIPE INSTALLATION AND TRENCHING SHALL CONFORM TO THE LATEST EDITION OF THE ISPWC DIVISION 300 AND SD-301. BEDDING AND BACKFILL SHALL BE CONSTRUCTED PER SECTIONS 305 AND 306 OF THE ISPWC. 6. ALL SEWER SERVICE LINES SHALL HAVE A 2%MINIMUM GRADE TO THE PROPERTY LINE. 7. STATIONING REPRESENTS SEWER MAIN ALIGNMENT. 8. SEWER PIPE SLOPES ARE CALCULATED USING LENGTH OF RUN FROM CENTER TO CENTER OF MANHOLES. - Sewer Keynotes:co �O 1. POTABLE WATER MAIN CROSSING -SEE CITY OF MERIDIAN SEWER NOTE NO. 2 ON SHEET C1.00. 7 . -B I 2. POTABLE/NON-POTABLE SERVICE CROSSING -SEE CITY OF MERIDIAN SEWER i NOTE NO. 3 ON SHEET C1.00. SF 4,343-SF B5 L7 B5 L10 4,000-SF / 3. INSTALL 4-IN SEWER SERVICE PER ISPWC SD-511 AND MARK PER CITY OF Q °O 4,000-SF ���' MERIDIAN SD SW3. - Oa a Cn o~ 3.1. INSTALL 6-IN SEWER SERVICE PER ISPWC SD-511 AND MARK PER CITY OF u�a o ,; MERIDIAN SD SW3. y + - cc CC B6 L10 Z `' °C B5 L8 °� 4. INSTALL 48-IN STANDARD MANHOLE TYPE A PER ISPWC SD-501. 4,343-SF B5 L9 I 4,000-SF SSMH 43 4,024-SF STA: 154+50.12 4.1. THREE-WAY SEWER MANHOLE CHANNEL. 0SSMH 21 4 I O4 SSMH 22 4 4.2. FOUR-WAY SEWER MANHOLE CHANNEL. STA: 111+69.69 O SSMH 42 �r I STA: 115+43.23 6"PIRR - 611PIR STA: 36+24.95 ? + Id8"PIRR - 8" - 8"R;R 8"PIRR 8"PIRR 5. CONNECT TO EXISTING SANITARY SEWER STUB. CONFIRM PIPE SIZE,TYPE, 6 L9 ILA M CONDITION AND ELEVATION PRIOR TO CONSTRUCTION, INFORM ENGINEER OF DISCREPANCIES. R/W - R/W R/W R/WCD — - CD 6. INSTALL T-TYPE CLEANOUT PER CITY OF MERIDIAN SD-1. ■ Ln LO 8"W 8 B11W — R"1m R°W 8L 8' 8"W 2 2 W. TORANA ST.- 2 1 2 11 00 — 112+00 113+00 114+00 — — 115+00 116+00 — 117+00 1 8"SS ,8"SS 8"SS " S 8"SS 8"SS 8"SS "SS �� 8"SS 8"SS �S 180-LF OF 8-IN PVC AT 0.45% 180° 374-LF OF 8-IN PVC AT 0.45% 303-LF OF 8-IN PVC AT 0.45% 2 2 30 F 8-IN PVCAT 0 R ■ c+'J O ± cc O O ± c V V O N O co O co O Vcc N L() O V (D 11'> O LA O ec LLj O O O h O M �_ ` O M M L�(J r M M l�f) r M M LO r M m l�f) r M M ll r M Cm7 ll r M r L r L r L r L r ti V cm -zr Lf7 N Ln N l()N N l() N N l() N r M Ln N r M 'T N r M Lh N r M LA N r M Lo N LL N Q LL N Q LL N Q LL N Q LL N Q LL N Q LL N Q LL N Q LL N Q LL N Q Li: N Q LL N C) W H LL C:J H LL C3 H LL LLI C:J H LL CJ H LL LLI c:J H LL CJ H LL LLI � H LL LLI & H LL LLI CD H LL LLI LL LLI C:J O _ LL V) O_ L..� V) O_ L..� U) O_ LL V) O_ L� V) O_ LL U) O — LL cn C) _ LL cn 0 _ LL cn 0 _ LL cn 0 _ LL to 0 _ LL ■ 3 L2 B3 L3 B3 L4 B3 L5 B3 L6 B3 L7 B3 L8 B3 L9 LLI B4 L1 B4 L2 B4 L3 B4 L4 i00-SF 6,600-SF 6,600-SF 6,600-SF 6,600-SF 6,600-SF 6,600-SF 6,624-SF LU 6,074-SF 6,600-SF 6,600-SF ■ 6,600-SF al ■ o m z �O I, P1 6"PIRR 6"PIRR P 6"PIRR 6"PIRR 6"PIRR 6"PIRR I, 11 6"PIRR i, 6"PIR 6"PIRR 6"PIRR "PIRR \/r Cc � O Sewer Plan & Profile - W. Torana St. (Center) 0 30' 60' 1 _ Horizontal Scale: 1" = 30' O 2550 2550 ■y j0 SEWER - BROCK > TO ANA: Sta. 1 0+70 - 11 +90 HORIZONTAL SCALE: 1" 30' , ■� y VERTICAL CALE' 1" _ ' AT POPOS PIPE ED GRADL CENTERLINE 2547 4 , 2547 EXISTING GROUND ELEVATION AT PIPE CENTERLINE � O 2544 _ ---- — ----- ---- ---- ----- 1 r-- ---- , 2544 cc � ---- ---- — ----- ---- 1 1V m � 1m _ C..) o 2541 , 2 2 , 2541 2 2 WATER SERVICE CROSSING WATER SERVICE CROSSING WATER SERVICE CROSSING 8-IN PVC WATER CROSSING 2G , OWATER SERVICE CROSSING WATER SERVICE CROSSING Revisions 1 2538 WATER SERVICE CROSSING , 2538 1. 5/30/25-CITY FP COMMENTS O ■ N r , r O �O C� v 2535 ■ 2535 303-LF OF 8-IN PVC AT 0.45% 2532 374-LF OF 8-IN PVC AT 0.45% 5 32 180-LF OF 8-IN P VC AT 0.45% 4 SSMH 22 STA: 115+43.23 2529 RIM: 2545.17± 2529 DEPTH: 12 85' 4 SSMH 21 STA: 111+69.69 IE IN: 2532.42,8 IN PVC (W) SAL RIM:2544.05± IE OUT: 2532.32, DEPTH: 13.51' ■ 2526 IE IN:2530.64,8-IN PVC (E) 2526 56805/30/2025 0 IE OUT:2530.54,8-IN PVC (W) a ■ J� ATE OF 0 �ESW.G 2523 , , 2523 Project No.: 123200 Date of Issuance: 4.15.2025 EXISTING GROUND ELEVATION PROPOSED GRADE ELEVATION , Project Milestone: Permit Set AT PIPE CENTERLINE AT PIPE CENTERLINE Sewer Plan & Profile a � 2520 2520 W. Torana St. cV O O N Ln Lf) N c0 M 00 M 00 M CO Lf7 I� Ln I` O N 6) LI) CO N co u? U? O r N Ln Ln L.q cD 6) cO Ln ti c0 O) 6) O r r co co m r D7 m r C) LO CO c0 m r r r r N V cO c0 O)CO r r T O c'7 � c'7 � C+J � Vco� CJ co� CJ � V � V � V � V � V � V � Lf7 � Lf7 � Lf) � Lf7 � Lf) � Lf7 � Lf7 COLO� CO LO� O _ Ln Lo Ln Lo LO I, LO L, LO L, LO Ln LO Ln LO L, LO Lo L!') L, LO L, Lf) L, Lf) L, LO L, Ln L, LO Ln LO L, LO Ln LO L, LO L, Lf) 11 Lf) 11 Lf) L, LO 11 LO N Lf7 N Lf7 N Lf7 N Lf") N Lf") N Ln N Ln N Lf") N Lf") N Lf") N Lf") N Lf") N Lf") N Lf") N Lf") N Ln N Lf") N Ln N Lf") N Lf") N L1') N L1') N LCJ N L!') N C, %3� N N N N N N N N N N N N N N N N N N N N N N N N N — 110+70 111+00 111+30 111+60 111+90 112+20 112+50 112+80 113+10 113+40 113+70 114+00 114+30 114+60 114+90 115+20 115+50 115+80 116+10 116+40 116+70 117+00 117+30 117+60 117+90 C6ml ��o