Loading...
HomeMy WebLinkAboutC6.07_Sewer Plan & Profile N. Sepino Ave. Sheet Notes: 1. COMPLY WITH ALL NOTES ON SHEET C1.00. Q 2. ALL CONSTRUCTION AND MATERIAL SHALL BE IN ACCORDANCE WITH THE O LATEST EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), CITY OF MERIDIAN STANDARDS, AND ADA COUNTY HIGHWAY DISTRICT STANDARDS. NO EXCEPTIONS ARE PERMITTED WITHOUT PRIOR APPROVAL. 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL COMPLY WITH IDAHO CODE, CHAPTER 22,TITLE 55 REGARDING UNDERGROUND FACILITIES DAMAGE PREVENTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED AS A RESULT OF FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANIES OR DIG-LINE (208.342.1585) FOR EXACT LOCATIONS A MINIMUM OF 48-HOURS PRIOR TO DIGGING. 4. CONTRACTOR TO FIELD VERIFY ALL EXISTING CURB AND GUTTER, STORM DRAIN, CHANNEL CROSSINGS, AND SEWER ELEVATIONS OR INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER WHEN ELEVATIONS OR INVERTS DO NOT MATCH PLANS. 5. ALL PIPE INSTALLATION AND TRENCHING SHALL CONFORM TO THE LATEST EDITION OF THE ISPWC DIVISION 300 AND SD-301. BEDDING AND BACKFILL SHALL BE CONSTRUCTED PER SECTIONS 305 AND 306 OF THE ISPWC. 6. ALL SEWER SERVICE LINES SHALL HAVE A 2%MINIMUM GRADE TO THE PROPERTY LINE. V) C2 I N CN B1 L15 7. STATIONING REPRESENTS SEWER MAIN ALIGNMENT. + C6.02 5,099-SF 8. SEWER PIPE SLOPES ARE CALCULATED USING LENGTH OF RUN FROM CENTER TO _ CENTER OF MANHOLES. T MI L "P d % PIRR id 4"PIRR 4"PIRR I^ � m ■ 3688 S 3,6 8 SF Sewer Keynotes: 1. POTABLE WATER MAIN CROSSING -SEE CITY OF MERIDIAN SEWER NOTE NO. 2 ON _ SHEET C1.00. o Co 131 L16 y v� 5,099 sF 2. POTABLE/NON-POTABLE SERVICE CROSSING -SEE CITY OF MERIDIAN SEWER a o o w NOTE NO. 3 ON SHEET C1.00. Z Q + 0 3. INSTALL 4-IN SEWER SERVICE PER ISPWC SD 511 AND MARK PER CITY OF cmo B6 L10 B6 L11 B6 L12 B6 L13 B6 L14 B6 L15 B6 L16 �o z a MERIDIAN SD SW3. ■ � 4,343-SF 4,343-SF 4,343-SF 4,342-SF 4,342-SF 4,343-SF 4,343-SF � u_ 180o 3 J0 FUTURE PHASE 3.1. INSTALL 6-IN SEWER SERVICE PER ISPWC SD 511 AND MARK PER CITY OF IJ_ MERIDIAN SO SW3. SSMH 21 cD v, � °' � r M co M co r o CC � CC CO W r 119 + = co 119 + = co 119 + r l!') STA: 111+69.69 to u�- L� � a) � � F- (m � � F- (m � M � a � MF_ a - `� B1 L17 M? m "' M m "? co u� "' "'-tr "' "'� u� "' "'� u� "' "' r u� 4. INSTALL 48 IN STANDARD MANHOLE TYPE A PER ISPWC SD 501. ~ LL N (:� O ~ LL N (:� O ~ LL N (.} 3 ~ LL N (.} 3 ~ LL N (.} O ~ LL N (.} 3 ~ LL N N O inoWLL cnowL� cnowLL cnowLL cnowLL cnowLL chow o, SSMH05 4 5,693SF o v STA: 10+82.480 4.1. THREE-WAY SEWER MANHOLE CHANNEL. + P — 4"PIRR <r "" "" "" "" plrL 4.2. FOUR-WAY SEWER MANHOLE CHANNEL. R/W r j - 5. CONNECT TO EXISTING SANITARY SEWER STUB. CONFIRM PIPE SIZE,TYPE, ?� C10 O SSMH 42 0 SSCO 2 O CONDITION AND ELEVATION PRIOR TO CONSTRUCTION, INFORM ENGINEER OF STA: 36+24.95 2 346-LF OF 8-IN PVC AT 2.00% 2 N. SEPINO AVE. 2 2 `f' �' 152-LF OF 8-IN PVC AT 2.50% STA: 31+26.19 DISCREPANCIES. • I - 8"SS ii"55 S 8"S 8"SS -8"SS 3"55 36+35.16 ` 6 -- 36+00- 2 2 2 35+00 2 �, 2 34+0 2 2 — M 33+00 v O — 32+00 2 — 2 0 \\ 31+00 6. INSTALL T-TYPE CLEANOUT PER CITY OF MERIDIAN SD-1. d — 8' 8"W — "W 81M — d-,w -0 8"W o 2 1 + II R \ �, N . , F - C 3 + J � 3 + J � 3 + Jr` + 3 3 + J � u) 3 + JM�cD 'IT 03 + JM � 03 + JN � �, + J � u" O + J � � O C \ O to dp a) V O 'n M m V O 'n M m V Lo 00 0 0 .,Zr OO 0 ,Zr OO co co ■ N OD OD M cocM u7 M coM u7 M M u) M M 119 M M M V 111�7 M 111�7 M M V u) Ln N LA N LA N L. N LA N u.)N In N In N O l() N l() N Q I.L N Q I.L N Q I.L N Q LL N Q I.L N Q L.L N Q LL N Q LL N y Q LL N Q LL N HLLw ��' HLLw ��' HLLw ��' HLLwC.•S HLLwCJ HLL (.7 HLL f.7 HLL f.7 H HLL O HLL C7 o cn0_ LL cn0- - W - - cn0— LL cn0_ LL UJOwLL cn C> cn OwLL Q W V) OwLL V) OwLL co � Q r B5 L9 B5 L10 B5 L11 B5 L12 B5 L13 B5 L14 B5 L15 B5 L16 4,024-SF 4,000-SF 4,000-SF 4,000-SF 4,000-SF 4,000-SF 4,000-SF 4,000-SF L Do o J O Cn Cn � � z + C6.11 C6.02 1 PIRR _ 4"PIRR a 4" P R a 4"PIRR 4' d RALA r T T Sewer Plan & Profile - N. Sepino Ave. 30' 60' Cc y C■� Horizontal Scale: 1" = 30' 0 O 2553 2553 1 = SEWER - SEPINO: Sta. 0+90 - 36 90 cc HORIZONTAL SCALE: 1" 30' _ VERTICALSCALE: 1" _ ' O 2550 - - 2550 y 0 PROPOSED GRADE ELEVATION AT PIPE CENTERLINE y 2547 2547 EXISTING GROUND ELEVATION AT PIPE CENTERLINE y O 2544 - --- ------- -- ---- ------ -------- --- --- 2544 cc mime � � co 6-IN PVC PIRR CROSSING COcc 2541 — 2541 �02 0 0 Cc co WATER SERVICE CROSSING WATER SERVICE CROSSING WATER SERVICE CROSSING WATER SERVICE CROSSING 2538 2538 Revisions 1 1. 5/30/25-CITY FP COMMENTS 2535 TZ Z "7 2535 SSMH 42 4 STA: 36+24.95 346-LF OF _ RIM: 2544.01± 8�N PAC AT 2.00/ 2532 4DEPTH:8.10' o 2532 IE OUT:2535.91,8-IN PVC (N) a 152-�F OF 6 SSCO 2 STA: 31+26.19 RIM: 2544.50+ 2529 DEPTH: 11.70' 2529 IE IN: 2532.80, 8-IN PVC (N) IE OUT: 2532.80, 8-IN PVC (S) �014AL SSMH 05 2526 STA: 32+78.58 2526 RIM: 2544.49± 568 DEPTH: 15.60' (5/30/2025 3 IE IN: 2528.99, 8-IN PVC (E) JT�TE OF IE IN: 2528.99, 8-IN PVC (S) `q 3W. 2523 IE IN: 2528.99, 8-IN PVC (N) 2523 IE OUT: 2528.89, 8-IN PVC (W) Project No.: 123200 EXISTING GROUND ELEVATION PROPOSED GRADE ELEVATION Date of Issuance: 4.15.2025 AT PIPE CENTERLINE AT PIPE CENTERLINE Project Milestone: Permit Set 2520 2520 Sewer Plan & Profile coT � T � N � � co � N � a � T co � �- I Nc � u � N � � N. SepinoAve. O O M cc c0 m r m I-- Ln Ln c0 O m r (n cnmj- cn cn cn cn cn cn cn Lf� cn cn co cn Ln Ln O cn cn Lf� - LO Ln Ln IT Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln � `�' N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N i 3 c s m 36+90 36+60 36+30 36+00 35+70 35+40 35+10 34+80 34+50 34+20 33+90 33+60 33+30 33+00 32+70 32+40 32+10 31+80 31+50 31+20 30+90 C6m07 ��o