Loading...
HomeMy WebLinkAboutCC - Engineer Statement THE � LAND GROUP April 15, 2025 Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Baratza Subdivision—Phase 1 Street Centerline Elevation Certification PN 123200 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3)feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent construction activities, the groundwater within this project was not encountered within a depth of three (3)feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3)feet below the designed finished street centerline elevations throughout the project. Sincerely, The Land Group, Inc. �$ZpNAL ECG James W. Gute, PE 568 Principal, Project Civil Engineer J 04/15/2025 �qrE OF \OP 9�ES W.G