Loading...
HomeMy WebLinkAboutACHD Project 322024/522025 Ustick Rd. Black Cat Rd. to Ten Mile Rd. Cost Share Permit. Send to Mike Barton to get other sig. ADA COUNTY HIGHWAY DISTRICT COST SHARE PERMIT 3775 Adams Street ACHD Contact Person: Garden City, Idaho 83714 ROW and Project Phone (208) 387-6280 Management Facsimile (208) 387-6289 Name: Seth Jarsky, Sr. Project Manager 3775 Adams Street A$F Garden City Idaho 83714 Phone: (208) 387-6223 Air ACHD Date of Permit: ACHD Project No.: Permit No.: 52 322024/522025 Capitalized terms that are not defined in this Permit shall have the meanings given to them in the ACHD Cost Share Ordinance No. 215. L PERMITTEE INFORMATION This permit is granted to: City of Meridian Partnering Agency Contact 33 E. Broadway Avenue, Person: Mike Barton, Parks Meridian, ID 83642 Superintendent Phone: 208-440-8742 Email: mbarton meridiancit .or IL ROAD PROJECT AND APPROVED NON-TRANSPORTATION COMPONENTS Name/Location of ACHD Road Project: Ustick Rd, Black Cat Rd to Ten Mile Rd. ACHD Project 322024/522025 as depicted in the project plans attached hereto and incorporated herein as Exhibit A. 1 of 11 Approved Non-Transportation Components: Pursuant to this Permit, ACHD authorizes, and, as a condition of issuing this Permit, requires, the following Non-Transportation Components: 1) Design, Construction, and Perpetual Maintenance of the following_: • Patterned concrete with "landscapingpods", landscaping and irrigation, which includes irrigation lines and meter pits, in the center medians per the plans from Ardurra dated March 28, 2025. All of the aforementioned is depicted in Exhibit B. ACHD has received and approved the design, construction, and perpetual maintenance of the patterned concrete with "landscaping pods", landscaping and irrigation, including the irrigation lines and meter pits, in the center medians per the plans from Ardurra dated March 28, 2025. In accordance with Ordinance 215, the foregoing mentioned installation of patterned concrete with "landscaping pods", landscaping and irrigation that consists of irrigation lines and meter pits are referred to as the "Non-Transportation Components." III. ACQUISITION OF RIGHT-OF-WAY OR REAL PROPERTY Conditions of acquisition/contribution of right-of-way or real property by Partnering Agency and/or reimbursement to ACHD by Partnering Agency for said acquisition: None. ACHD has already acquired or is in the process of acquiring the right-of-way necessary to incorporate the Non-Transportation Components into the Project. Therefore, the acquisition of real property is not required of the Partnering Agency and is not part of the Non-Transportation Components. IV. DESIGN OF NON-TRANSPORTATION COMPONENTS 710 Party responsible for obtaining plans/design for Non-Transportation Components: Partnering Agency has submitted completed and approved plans/designs of the Non-Transportation Components, which consist of designs for the patterned concrete with"landscaping pods", landscaping and irrigation, including the irrigation lines and meter pits, in the center medians per the plans from Ardurra dated March 28, 2025, described in Section II. The Partnering Agency has submitted the plans/designs of the Non-Transportation Components and receive approval from ACHD as to the plan/designs prior to installation. 2of11 If Partnering Agency is responsible for providing plans/design, deadline for submitting plans/designs to ACHD for approval: The Partnering Agency shall be solely responsible for all design costs for the Non-Transportation Components, if any. The Partnering Agency shall receive no credits in connection with the design costs for the Non-Transportation Components other than the credit for the stamped concrete and base materials costs ACHD would incur in the amount of$131,826.75 (estimated in communication dated April 30, 2025) if median islands were not landscaped. The total project costs are estimated at $234,932.87, leaving a deficit of $103,106.12 that the City will owe to ACHD when the project is complete. Completion of the installation of the patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits is anticipated in FY 2026 and the deficit amount of$103,106.12 owed to ACHD will be included in the City's FY26 budget. Additional conditions:All designs/plans submitted by Partnering Agency must comply with (i) established engineering standards, including the Idaho Standards for Public Works Construction (ISPWC); (ii) the American Association of State Highway and Transportation Officials ("AASHTO'); (iii) the Cost-Share Ordinance No. 215; (iv) all adopted ACHD rules, regulations, and policies; and (v) all state and federal laws. No designs shall be considered final until they are approved in writing by ACHD. Any modifications to the deadlines set forth above must be approved in writing by ACHD. By approving such design or construction of the Non-Transportation Components to the extent such Non-Transportation Components were not designed or constructed by ACHD. Allocation of design costs for Non-Transportation Components (including, if applicable, any credits provided to Partnership Agency and application of any federal funding) and for reimbursement, if applicable: The Partnering Agency shall be solely responsible for all design costs for the Non-Transportation Components, if any. The Partnering Agency shall receive no credits in connection with the design costs for the Non-Transportation Components other than the credit for the stamped concrete and base materials costs ACHD would incur in the amount of $131,826.75 (estimated in communication dated April 30, 2025 attached and incorporated herein as Exhibit C) if median islands were not landscaped. The total project costs are estimated at $234,932.87, leaving a deficit of$103,106.12 that the City will owe to ACHD when the project is complete. Completion of the installation of the patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits is anticipated in FY 2026 and the deficit amount of$103,106.12 owed to ACHD will be included in the City's FY26 budget. V — V �1 0 V. CONSTRUCTION OF NON-TRANSPORTATION COMPONENTS 3of11 Description of construction work approved by ACHD to be completed by Partnering Agency (if applicable): (In addition to description, refer to designs and plans attached to this Permit as Exhibits, if applicable. If designs and plans are not complete at the time of issuance of this Permit, they must be approved in writing by ACHD and shall be incorporated into this Permit.) N/A Additional conditions: (1) Partnering Agency will not allow any liens to attach to any right-of-way, improvements, or any otherproperty ofACHD as a result of any laborperformed or materials supplied in connection with the construction of the Non-Transportation Components. (2) Partnering Agency shall be responsible for obtaining all permits required by ACHD in connection with any construction of the Non- Transportation Components. (3) Partnering Agency's construction shall not negatively impact ACHO's construction of the Transportation Components or ACHD's Road Project schedule in any way. (4) Any amendment to the designs and plans must be approved in writing by ACHD. (5) All construction of the Non-Transportation Components shall be in accordance with the designs/plans approved by ACHD. (6) All construction by Partnering Agency will comply with (i) established engineering standards including the Idaho Standards for Public Works Construction (ISPWC); (ii) the American Association of State Highway and Transportation Officials (AASHTO'); (iii) the Cost Share Ordinance No. 215; (iv) all adopted ACHD rules, regulations and policies;and(v) all state and federal laws. If Partnering Agency is responsible for all or a part of the construction of the Non-Transportation Components: N/A a. Date for submitting Partnering Agency's contractors and engineers to ACHD for approval: b. Date for submitting Partnering Agency's contractors' and engineers' estimates to ACHD approval: c. Date for submitting Partnering Agency's contractors' and engineers' contracts to ACHD for approval: Any modifications to the deadlines set forth above must be approved in writing by ACHD. Allocation of construction costs for Non-Transportation Components, reconstruction costs of Transportation Components necessitated by the incorporation of Non-Transportation Components into the Road Project, ACHD construction, maintenance, administration, and overrun costs (including, if applicable, any credits provided to Partnering Agency and application of any federal funding), and time for reimbursement, if applicable: The Partnering Agency shall be solely responsible for all design costs for the Non-Transportation Components, if any. The Partnering Agency shall receive no credits in connection with the design costs for the Non-Transportation Components other than the credit for the stamped concrete and base materials costs ACHD would incur in the amount of$131,826.75 (estimated in communication dated April 30, 2025) if median islands were not landscaped. The total project costs are estimated at $234,932.87, leaving a deficit of $103,106.12 that the City will owe to ACHD when the project is complete. Completion of the installation of the patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits is anticipated in FY 2026 and the deficit amount of $103,106.12 owed to ACHD will be included in the City's FY26 budget. If ACHD performs the construction of the Non-Transportation Components, then the Partnering Agency 4of11 shall reimburse ACHD for the actual costs of all materials used, the cost of the relocation of any utilities necessitated by installation of the Non-Transportation Components, including but not limited to the construction costs of patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits, in the center medians, where applicable. Payment by Partnering Agency shall be made to ACHD within 30 days following submission of any invoice by ACHD to Partnering Agency identifying such charges. Relocation of utilities to be completed by Partnering Agency(if any): Partnering Agency shall be solely responsible for the cost of relocating any utilities required in connection with the placement, incorporation, or construction of the Non-Transportation Components. Storm water provisions (if applicable): The construction and installation of the patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits, in the center medians within ACHD's project shall be designed so as to prevent storm water from accumulating and ponding. Additional conditions: Upon a determination by ACHD that the incorporation into the Road Project of Partnering Agency's Non-Transportation Components will have an adverse effect on storm water quantity or quality, Partnering Agency shall be solely responsible for either mitigating or funding the mitigation of any such adverse effects in a means determined by or acceptable to ACHD. Schedule for completion of Road Project: At this time, ACHD's schedule for completion of the Transportation and Non-Transportation Components of the Road Project completion is unknown but estimated to be sometime in 2025-2026. VI. MAINTENANCE OF NON-TRANSPORTATION COMPONENTS 10 Maintenance requirements of Non-Transportation Components by Partnering Agency: Partnering Agency shall be, and is hereby, granted a non-exclusive, revocable license to maintain, repair, and replace the Non-Transportation Components, subject to the provisions of this Permit and during the term of this Permit. This includes the perpetual maintenance, repair, and replacement of the patterned concrete with "landscaping pods", landscaping and irrigation, including irrigation lines and meter pits, described in Section II. Partnering Agency shall cause the Non-Transportation Components to be operated and maintained in good functioning order during the term of this Permit, in accordance with applicable law, the approved designs/plans, Partnering Agency's patterned concrete with"landscaping pods", landscaping and irrigation, including irrigation lines and meter pits, must meet ACHD standards and specifications, and industry 5ofII standards. This obligation includes, without limitation, grass and lawn care, pruning or replacement of gravel, trees, and shrubs, clean up of litter and debris, weed removal, and application for shrubs and trees, and groundcover, as applicable. Any replacement and/or installation by Partnering Agency of additional improvements shall be accomplished in accordance with designs, plans, and specifications approved in advanced an in writing by ACHD, in its discretion, and as required to satisfy applicable laws, its policies, and good engineering and landscaping practices. Additional conditions: 1. This Permit does not extend to Partnering Agency the Right to use any part of the ACHD Road Project area to the exclusion ofACHD for any use within its jurisdiction, authority, and discretion or of others to the extent authorized by law. 2. In accessing any part of the Road project that has been accepted as an open public highway (as the term "highway" is defined in Idaho Code Section 40-109(5), Partnering Agency's authorized use is subject to the rights of the public to use the highway. 3. The rights granted hereunder are subject to and subordinate to the rights of holders of easements of records and the statutory rights of utilities to use the right-of-way. 4. This Permit does not preclude or impede the ability of ACHD to enter into or grant easements or license agreements allowing third parties to access the Road Project area, or the ability of ACHD to redesign, reconstruct, relocate, maintain, and improve the Road Project and right-of-way as it determines necessary, in its sole discretion. 5. In consideration of the license granted by this Permit, Partnering Agency expressly covenants and agrees that the license granted herein is temporary and merely a permissive use of the ACHD right- of-way pursuant to the terms of this Permit. Partnering Agency assumes the risk that the license granted herein may be terminated before Partnering Agency has realized the economic benefit oj' the cost of installing, constructing, repairing, or maintaining the Non-Transportation Components, and by signing and accepting this Permit, Partnering Agency hereby waives and estops itself from asserting any claim, including damages or reimbursement, that the license is in any way irrevocable because partnering Agency has expended funds on the Non-Transportation Components and the Permit has not been in effect for a period sufficient for Partnering Agency to realize the economic benefit from such expenditures. 6. In the event Partnering Agency fails to replace, repair, maintain, and care for the Non- Transportation Components, ACHD shall have the following remedies in addition to any other recovery in law or in equity,provided that ACHD first gives Partnering Agency 30 days'notice and Partnering Agency fails to remedy such failure: (i)ACHD may revoke this Permit; (ii)ACHD may replace, maintain, and/or care for the Non-Transportation Components, and Partnering Agency shall reimburse ACHD fully for all associated costs; (iii) ACHD may remove, alter, redesign, or reconstruct the Non-Transportation Components or any part of the ACHD Road Project (including without limitation the right-of-way), or in the case of landscaping, replace the Non-Transportation Components with hardscape, and Partnering Agency shall reimburse ACHD fully for all associated costs; and (iv)ACHD may refuse to issue any further Cost Share Permits or any other permits for future ACHD Road Projects until Partnering Agency complies with the conditions of the Permit. In addition, in the event of an emergency caused by Partnering Agency's failure to perform the required maintenance, ACHD may immediately perform any and all emergency repairs or take other measures in connection with an emergency and Partnering Agency shall reimburse ACHD fully.for all associated costs. 6of11 VIL TERM Term of Permit: This Permit shall be perpetual, until terminated or revoked pursuant to the provisions of this Permit. Upon termination or revocation of this Permit, upon the request of ACHD, Partnering Agency will either, as directed by ACHD, (i) promptly remove the Non-Transportation Components and restore the underlying area to at least the condition present as of the date of this Permit repairing and restoring all portions of ACHD's right-of-way, personal property, and real property, if any, that are damaged during such removal activities; or (ii) reimburse ACHD for its cost of redesigning, replacing, and/or reconstructing the right-of- way or real property underlying the Non-Transportation Components. Any portion of the Non- Transportation Components that remain in ACHD right-of-way or on ACHD real property 90 days after termination or revocation of this Permit shall be deemed abandoned, and ACHD shall have the right to remove them or redesign, replace, and reconstruct the right-of-way or real property underlying them and char e all costs to Partnering Agency . IF VII.ADDITIONAL PROVISIONS APPLICABLE TO PROJECT30 Additional provisions: This permit provides terms upon which the incorporation of the Non-Transportation Components into the Road Project is approved. IX. GENERAL CONDITIONS OF PERMIT Mi 1. This Permit is issued conditioned on the Partnering Agency's compliance with ACHD's Cost Share Ordinance No. 215, the terms and conditions of this Permit and all applicable ACHD policies, standards and specifications and all certifications made by the Partnering Agency's pursuant to this Permit. 2. This Permit is subject to the provisions of state and federal law and all ACHD Ordinance, including but not limited to the Cost Share Ordinance No. 215, in effect as of the date of issuance of this Permit and those that may be adopted after the issuance of this Permit (the "Applicable Law"). In the event of any conflict between this Permit and Applicable Law, Applicable Law shall govern. hi the event that any part of the obligations of the Partnering Agency or of ACHD in connection with this Permit or the Road Project are determined to be illegal or unenforceable by a court of competent jurisdiction, the remaining obligations of the Permittee set forth in this Permit shall still be applicable. Further amendments and restatements of the Cost Share Ordinance shall not be applicable to this Permit. 3. If any portion of the ACHD Road Project (including without limitation any portion of the right-of-way and ACHD personal property therein) is damaged as a result of Permittee's action or inaction with regard to the construction, operation, and/or maintenance of the Fiber Optic Facilities or the failure or neglect to construct, operate, and/or maintain the Fiber Optic Facilities, then the Permittee shall, at its sole cost and expense, correct such deficiency and restore the area to the same condition it was in prior 7of11 thereto, and if Permittee or its successors or assigns shall fail or neglect to commence such correction and restoration within twenty-four (24) hours of notification thereof, ACHD may proceed to do so, in which event Permittee shall reimburse ACHD for the costs and expenses thereof, including, without limitation, reasonable compensation for the use of staff and equipment of ACHD. 4. Partnering Agency shall be liable to ACHD for any and all damages, fines, fees, obligations to third parties, costs, expenses, attorney fees, or any other liabilities whatsoever directly resulting from the Partnering Agency's failure to comply with any provision of this Permit and/or Cost Share Ordinance No. 215. Without limiting the foregoing in any manner, in the event Partnering Agency fails to comply with any provision of this Permit, then following any applicable notice and opportunity to cure set forth herein, ACHD shall have the right, in addition to all other rights and remedies elsewhere in this Permit, to redesign, replace, and/or reconstruct the Non Transportation Components and/or the right-of-way or real property underling the Non-Transportation Components, and in such event, Partnering Agency shall reimburse ACHD for all associated cost. The obligations in this Section shall survive the expiration, revocation, and/or cancellation of this Permit for any reason. 5. Partnering Agency may delegate any of its responsibilities hereunder to any third party so long as it gives prior written notice to ACHD that specifies in detail what responsibilities are being delegated and identifies the third party. Notwithstanding any delegation to a third party, the Partnering Agency shall remain and shall be ultimately responsible for the third party's compliance with the terms of this Permit, and no delegation shall absolve the Partnering Agency of any duties or obligations of this Permit in any way. In addition, Partnering Agency fully assumes all legal risks of determining whether any such delegation is property under applicable law and/or regulations, and shall not be absolved of any responsibilities under this Permit if it is unable to complete or maintain any such delegation for any reason. 6. Partnering Agency will protect, defend, indemnify, and hold ACHD and its officers, directors, employees, members, and agents harmless from and against any and all liability, suits, losses, damages, claims, actions, costs, and expenses of any nature, including court costs and attorney fees, arising from or out of any acts or omissions of the Permittee, its agents, or contractors related to or in connection with the Non-Transportation Components and the exercise of any privileges or performance of any obligations by the Partnering Agency pursuant to the terms of this Permit. This duty to defend, indemnify and hold harmless is subject to the limitations of Idaho law, including Article VIII, section 3, Idaho Constitution and Title 6, chapter 9, Idaho Code (Idaho Tort Claims Act). Partnering Agency's obligations in this Section shall survive the expiration, revocation, and/or cancellation of this Permit for any reason. 7. In the event the Non-Transportation Components will or may necessitate future maintenance, repair, relocation, or replacement that is not subject to this Permit, ACHD shall in its discretion issue Partnering Agency an amended or an additional Cost Share Permit to perform such work. 8. ACHD shall at all times have the right to relocate, reconstruct, remove, or redesign any and all improvements that are part of the Road Project. ACHD will use its best efforts to advise Partnering Agency of any anticipated actions within the Road Project that would be likely to cause a relocation, modification, or other adaptation of any of the Non-Transportation Components, and the parties, to the extent reasonably possible, shall agree to a priority schedule regarding the same and shall attempt to cooperate with respect to planning and coordination as related to any such relocation, modification, or 8of11 other adaptation of any of the Non-Transportation Components. If ACHD ultimately determines that any part of the Road project must be relocated, reconstructed, removed, or redesigned, then Partnering Agency, at its sole cost and expense, shall be responsible for relocating, reconstructing, removing, or redesigning the Non-Transportation Components, as required by ACHD, which shall be accomplished by the Partnering Agency according to designs, plans, and specifications approved by ACHD in writing prior to any such work. Partnering Agency may also elect to remove all or a part of the Non- Transportation Components in lieu of any relocation, modification, or adaptation. Partnering Agency assumes any and all costs of itself and ACHD relating to any future relocation of the Non- Transportation Components. 9. ACHD shall at all times have the right to revoke this and any other Permit granted to the Partnering Agency to access the Highway or public right-of-way or real property. In addition, ACHD may immediately perform any and all emergency repairs or take other measures in connection with an emergency, in which case the Partnering Agency shall reimburse ACHD fully for all associated costs. 10. This Permit shall immediately be revocable and/or cancelable by ACHD by providing written notice to the Partnering Agency upon the occurrence of any of the following: (i) a determination by ACHD that any of the information submitted by the Partnering Agency in the Cost Share Application is false or inaccurate in any manner; (ii) a determination by ACHD that the Partnering Agency has failed to comply with any term or provision of this Permit; (iii) a determination by ACHD that the Partnering Agency has failed to replace, maintain, and/or care for the Non-Transportation Components, as required by the terms of this Permit. Except in an emergency situation, ACHD shall provide the Partnering Agency with thirty (30) days notice of the issue and an opportunity to comply prior to exercising such rights. 11. The issuance of this Permit shall in no way obligate ACHD to provide Partnering Agency with additional permits or rights, nor shall ACHD be obligation to utilize provisions or rights set forth in this Permit in connection with additional permits or rights that it may elect to provide to Partnering Agency in the future. 12. All exhibits and any addenda to this Permit are incorporated herein. 15. This Permit is conditioned upon the signature of ACHD and the Permittee below. SIGNATURES AN 9of11 This Cost Share Permit is issued by the Ada County Highway District on the date set forth above: Ada County Highway District: The person signing below represents that he or she has the authority on behalf of ACHD to issue this Permit and bind ACHD to the terms set forth herein. By: Ryan Head Its: Director—Ada County Highway District Acceptance/certification by Permittee: The person signing below represents that he or she has the authority on behalf of the Partnering Agency to accept and agree to the terms of this Permit and bind the Partnering Agency to the terms set forth herein. By: Robert E. Simison 6-17-2025 Its: Mayor, City of Meridian Attest: Chris Johnson City Clerk 6-17-2025 10of11 EXHIBITS Exhibit A - ACHD Project 322024/522025 Project Plans Exhibit B—Design Plans by Ardurra dated March 28, 2025. Exhibit C—Correspondence discussion between City and ACHD regarding credit and Non-Transportation costs dated April 30, 2025 11 of 11 EXHIBIT "A' d fi8f i d YYg�€€€i f Fit F Fi a m ill # y " 1 z fit,, 3f7o [�,of ar a�i ati+tr +tf anti I F Y- �ad litt �ii�r�i�i !itt litE litt !itt e CD o �® e C C D m W S �� >C Z c�CL o ?? On 2 1 . N n CQ N om N41 B CXL co Cal Z PO <D n q i �. x ® fl- M. � f D T m co r j� �9.f"i a .ten%"d�'q'o 8$. ;N y"'_ � • a .11 Eh 41 z 7� egg m 4S n g & m w O ci na o Q w e x 2 _ w N a SE� �v� w p m�?� m"c o y w � _ a♦,� 3 tF v w m p 0awg�l ;� ' m O _ � NoraY«+e_ �taoaaya�n nr.ye.rr. M/.m•a.we I uua M:�•: 100% Exhibit B R,wxr SCxeoU�ui �I L — � m,axmvuur<xxra we,mn swxcEroxmnar r nr�ur-m O O E au, ecu m I ��a F '<----�� F xoousunE.,=swurauu snuwmu.asrvasw.aexoaauwume zu..sre nx,n �u .a u F— F F _F . m __ ___ a__ mnc>&rs awaxr� mrurrxxxue seE mrtu,=a un,uEseE wurmm=mr O __ _ _�—— —� _ _ _ _ Q ureuasEamm,aus wrtauw=aiianrsn nr�se - --__ RROZD — _ — a ainiou rv:,�=nsrua auxsiw. • mm r x mx rm IMIERIPI3CHE0ULE g_ � -_ eve ffsc xru mwu ory auras F � u.wo- �Ma®-m,ouoa®-ssro MEDIAN VEGETATION AT N THAMES AVE AND USTICK ROAD MEDIAN VEGETATION AT N TOWERBRIDGE WAY AND USTICK ROAD — — — — E. MEDIAN VEGETATION AT USTICK ROAD AND NW GLENNFIELD WAY �a _x- 1 ���1 o MEDIAN VEGETATION AT NE GLENNFIELD WAY AND USTICK ROAD Exhibit B �r.oE"G'"EEAs LANDSCAPE PLANoaMEDIAN VEGETATION PLAN Ada County Highway District 3775 Project Number:521052 USTICK ROAD,TEN MILE TO LINDER Sheet 36 Of 77 FRI TYPICAL MEDIAN HARDSCAPE LAYOUT TYPICAL MEDIAN IRRIGATION LAYOUT SGaL[-t.to 5Cu[-t.to AA aNIO �o TYPICAL MEDIAN VEGETATION LAYOUT�, � II h y �mE - -- ' BOULDER DETAIL WITH PLANTINGS 2 IRRIGATION SLEEVING 9 CONTROLLER�I NODE BT ON VALV " 4 POP-UP SPRAY r o LANDSCAPE PLAN 1.—NEE. Oi 1/202 LL Oi iz0 3 LANDSCAPE DETAILS Ada County Highway District 3775 a3,,. Project Number:521052 USTICK ROAD,TEN MILE TO LINDER Sheet 37 Of 77 Exhibit C Capital Paving Company, Inc <510. PO Box 190810 Boise, ID 83719 IF Fed ID No-82-0342640 •Reg Idaho Contractor No-RCE-4060• Public Works No-PWC-C-12069-U-4 Letter of Transmittal #69 To: Ada County Highway District Attention: Nick Wheeler Project Name: Ustick Road, Black Cat Road to Ten Mile Road Project#: CT225-02 Date: 4/23/2025 Copies Bid Item Bid Schedule Description 1 1 RFC #7 -Median Island Changes Pricing These Are Transmitted As Checked Below: Transmitted Via: X For Approval X Email For Your Use USPS As Requested In Person Request for Information X I Request for Price Change Comments: Please feel free to call me with any questions at 208-573-3966 Signed: ;'� li John Mitchell, Project Manager ACHD Request for Change (RFC) Project# Project Name RFC# CT225-02 Ustick Road, Black Cat to Ten Mile 7 Requested By Title Company Name Date John Mitchell Project Manager Capital Paving Company, Inc 4/23/2025 Describe Proposed Change Median island landscaping and patterned concrete Reason for Change The City of Meridian requested change order pricing to add landscaping and patterned concrete to the median islands. Benefit to Project-(Dollars,Time,Quality,Other) NA Proposed Net Change to Contract Cost-(Attach supporting documentation to justify) See attached supporting documentation Request for Time-(Attach Justification) If this RFC is approved,we request that 10 working days be added to the planned completion date for this project. Contractor Printed Name Contractor Signature Date Capital Paving Company, Incge�& ewe&" 4/23/2025 ACHD Review Date Received by ACHD Result of Review ❑RFC Approved ❑RFC Denied for the Following Reason Click or tap here to enter text. ACHD Printed Name Signature Date <f>' Capital Paving Company, Inc PO Box 190810 Boise, ID 83719 Fed ID No-82-0342640•Reg Idaho Conctractor No-RCE-4060•Public Works No-PWC-C-12069-U-4 To: Ada County Highway District Attention: Nick Wheeler Project Name: Ustick Road, Black Cat Road to Ten Mile Road Proposal #: CT225-02 Date: 23-Apr-25 Plan Date: NA Line# Item # Item Description Qty UM Unit Price Total Price Landscape/Patterned Concrete 1 Establish Subgrade w/Import Fill and 780 TON $ 43.89 4" of 3 4" Base Gravel $ 34,234.20 2 Landscaping Scope 1 LS $ 99,677.85 $ 99,677.85 3 Concrete Scope 1 LS $ 72,490.00 $ 72,490.00 4 Survey for Joint Layout 1 LS $ 1,250.00 $ 1,250.00 5 GC Overhead and Profit 1 LS $ 5,000.00 $ 5,000.00 Total Price $212,652.05 Page 1 of 1 4/23/2025 5:33 PM