City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian ID, 83642
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155 NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
RECEIVED
� Fz8;;3JUN 12025 AX(e�47
11 June 2024 CITY OFGACE
CITY CLERKS OFFICE
RE: Apex Phenominal Subdivision/DWT Investments FP-2025-0005
E. Lake Hazel and Apex Avenue
Meridian
Boise-Kuna Irrigation District BK-65-2
Farr Lateral 140+05
McBirney Lateral 05+00
Sec. 31, T3N, RI E. BM.
Sonya Allen:
There are no Boise Project or Boise-Kuna Irrigation District facilities located on the
above -mentioned property; however, it does in fact possess a valid water right.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to
serve neighboring properties, must remain unobstructed and protected by an appropriate
easement by the landowner, developer and contractors.
The Watkins Drain is private and not under the jurisdiction of Boise Project or Boise.
Kuna Irrigation District but must enter and exit the property where it currently does, per
Idaho Statutes, Title 42.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting a hard copy of all plans that must include the irrigation and drainage plans.
Whereas this property lies within Boise-Kuna Irrigation District it is important that
representatives of this development contact the BKID office as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the Boise-Kuna
Irrigation District and the City of Meridian as to who will own and operate the pressure
irrigation system prior to review and approval of an irrigation plan by Boise Project
Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 424209.
Future preliminary and final plats must call out the Project easements and the plats must
also note which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right require changes when our easements and/or facilities are affected by
unknown factors even during the construction phase.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Assistant Project Manager, BPBC
for/tr
cc: Kevin Reeves Watermaster, Div; 2 BPBC
Alicia Flavel Secretary -Treasurer BKID
File