Loading...
HomeMy WebLinkAbout2025-06-12 COMPASS Sent: 6/12/25 https://compassidaho.org/ info@compassidaho.org Communities in Motion (CIM) Development Review Checklist Development Name: Durango Subdivision CIM Vision Category: Existing Neighborhood Consistent with CIM Vision? YES New Households: 135 New Jobs: ±60 Safety Economic Vitality How safe and comfortable is the nearest major road (minor arterial or above) for bicyclists and pedestrians? Analysis is limited to existing roadway conditions. To what extent does the project enable people, government, and businesses to prosper? Economic Activity Center Access Impact on Existing Surrounding Farmland Net Fiscal Impact Ustick Road Pedestrian level of stress Bicycle level of stress Convenience Quality of Life What services are available within 0.5 miles (green) or 1 mile (yellow) of the project? Checked boxes indicate that additional information is attached. Active Transportation ✓ Automobile Transportation ✓ Public Transportation Roadway Projects ✓ Nearest bus stop Nearest public school Nearest public park Improves performance Does not improve or reduce performance Reduces performance Comments: Ustick Road is scheduled for widening including bicycle and pedestrian improvements (see Short Term Funded Capital Projects below). This project will impact the Safety performance noted above. There are three collector access points planned within .5 miles of the future SH-16 and Ustick Road interchange. Coordinate with ACHD and the City of Meridian to determine appropriate access locations along this corridor. Who we are: The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization for Ada and Canyon Counties. This review evaluates whether land developments are consistent with Communities in Motion, the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document. Past checklists are available online. See the Development Review User Guide for more information on the red, yellow, and green checklist thresholds. Complete Network Appendix Checkmarks (✓) below indicate suggested changes to a site plan, based on the COMPASS Complete Network Policy (No. 2022-01). Both the Complete Network Policy and site-specific suggestions are intended to better align land use with identified transportation uses in the corridor. Please see the Complete Network map for primary and secondary uses for roadways (minor arterial and above) in Ada and Canyon Counties. Corridor Name: Ustick Road Primary Use: N/A Secondary Use: Public Transportation Bicycle and Pedestrian Infrastructure ✓ Apply traffic calming measures to discourage speeding on local roads Access Management ✓ Space access points (driveways or cross streets) to increase the distance between potential conflict points ✓ Provide more access on lower functionally classified roads, such as collectors, and less on arterials, to facilitate efficient and safe through movement More information is available in the COMPASS Access Management Toolkit and the COMPASS Access Management Business Guide. Fiscal Impact Analysis Below are the expected revenues and costs to local governments from this project. The purpose of this analysis is to help the public, stakeholders, and the decision-makers better manage growth. Capital and operating expenditures are determined based on service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. Net Fiscal Impact by Agency City County Highway District School District Breakeven point across all agencies: 1 Year Disclaimer: This tool only looks out 20 years and does not include replacement costs for infrastructure, public utilities, or unfunded transportation needs in the project area. More information about the COMPASS Fiscal Impact Tool is available at: https://compassidaho.org/fiscal-impact-tool/ Short-Term Funded Capital Projects Source: The COMPASS Transportation Improvement Program (TIP). The TIP is a short-range (seven-year) budget of transportation projects for which federal funds are anticipated, along with non -federally funded projects that are regionally significant and is available at: https://compassidaho.org/transportation-improvement-program/