Loading...
HomeMy WebLinkAboutACHD ----.;a....- . ~A~'~ (Jo~ut~ ~ )\ \ John S. Franden, President Carol A. McKee, 1st Vice President Dave Bivens, 2nd Vice President Sherry R. Huber, Commissioner Rebecca W. Arnold, Commissioner December 5, 2006 To: Heron River Development 6223 North Discovery Way, Ste 100 Boise,ID 83713 RECEIVED DEe 0 8 2006 Subject: MAZ-06-057 & MPP-06-056 Jericho 6055 & 6185 North Jericho City of Meridian City Clerk Office On December 5, 2006, the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at (208) 387-6174. Ryan McDaniel Planner I Right-of-way & Development Services Ada County Highway District CC: Project file, Utilities City of Meridian Engineering Solutions -Becky 150 E Aikens, Ste. B Eagle, 10 83616 Ada County Highway District. 3775 Adams Street · Garden City, ID . 83714 . PH 208-387-5100 · FX 345-7650 · www.achd.ada.id.us ~~l,~Right-o.f-Way & Development Services Department ~A~~ (Jo~ut~ ~ Project/File: Lead Agency: Site address: Staff Level Approval: Applicant: Representative: Staff Contact: Tech Review: Jericho Subdivision I MAZ-06~057 I MPP-06-056 This is a Preliminary Plat Subdivision / Annexation and Zoning application for 73- residential lots and 10 common lots on 9.52 acres in a proposed R-15 Zone City of Meridian 6055 & 6185 North Jericho Road December 5, 2006 Heron River Development 6223 North Discovery Way, Ste. 100 Boise,ID 83713 Engineering Solutions 150 East Aikens, Ste. B Eagle, ID 83616 Ryan McDaniel Phone: 387-6174 email: rmcdaniel@achd.ada.id.us December 1, 2006 Application Information: Acreage: 9.52 Current Zoning: RUT Proposed Zoning: R-15 Residential Lots: 73 Common Lots: 10 A. Findintts of Fact Existing Conditions 1. Site Information: There is currently a single family dwelling on the site. 1 Jericho Subdivision 2. Zonin R-15, C-C R-8 R-2 R-8 3. Existing Roadway Improvements and Right-of-Way Abutting or Near the Site: Jericho Road is currently improved with 2-traffic lanes, 33-feet of pavement with vertical curb, gutter and sidewalk on the eastern side of the roadway but not abutting the subject site. There is approximately 50-feet of right-of-way existing for Jericho Road (25-feet from centerline). The applicant is proposing to connect to two proposed stub streets to the north and to the west to be constructed as 36-foot street sections with curb, gutter and sidewalk within 50-feet of right-of-way. State Highway 20/26 is under the jurisdiction of Idaho Transportation Department, it has three lanes, 56-feet of pavement with no curb, gutter or sidewalk. The subject site does not have frontage on SH 20/26. 4. Existing Access: There is one defined access points to South Mesa Way from this property. 5. Site History: ACHD has not previously reviewed this site for a development application. Development Impacts 6. Trip Generation: This development is estimated to generate 710 additional vehicle trips per day (20 existing) based on the Institute of Transportation Engineers Trip Generation Single Family Detached Dwelling land use designation. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 8. Traffic Study: A traffic impact study was not required with this application. 9 mlJac e oa ways: Roadway Frontage Functional Class Traffic Count Level of Service* Speed (Approx.) Limit State 760-feet Principal Arterial 23,967 on 6/8/05 Exceeds 55 MPH Highway LOS "E" 20/26 Jericho Road 600-feet Local Residential 1,136 on 12/2/03 Acceptable planning 25 MPH thresholds for existing local residential roadways are up to 2000 ADT. t d R d *An acceptable Level of Service for a three-lane Principal arterial is LOS D; 17,000 ADT. 10. Capital Improvements Plan/Five Year Work Program There are currently no roadways, bridges or intersections currently listed in the Five Year Work Program or the Capital Improvements Plan that in the general vicinity of the subject site. 2 Jericho Subdivision B. Findinqs for Consideration 1. Jericho Road District Right~of-Way POlicy: District policy 72-F1A, 7202.3.2 and 7202.3.5, requires that residential collectors be constructed as 36-foot street sections with curb, gutter and 5-foot wide concrete sidewalks with no front-on housing. The access restrictions for these street segments should be stated on the final plat. Unless otherwise noted, parking should be prohibited on these street segments. Coordinate the signage Program with District staff. District Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a minimum of 150-feet from a residential collector roadway (measured centerline to centerline). Applicant Proposal: The applicant has proposed to construct Jericho Road as one half of a complete 36-foot residential collector street section with vertical curb, gutter and 5-foot attached concrete sidewalk within the existing right-of-way. The applicant does not propose to construct any two roadways offsetting one another by less than 150-feet on Jericho Road. A driveway used to service a utility feature exists on the east side of Jericho Road that offsets a proposed roadway, Hidalgo Street, by approximately 15-feet. Staff Comment/Recommendation: The applicant's proposal for Jericho Road is approved with this application as proposed: to complete Jericho Road as a 36-foot residential collector street section (measured back of existing curb to back of new curb) and construct vertical curb, gutter and 5-foot attached concrete sidewalk within the existing right-of-way. The locations of the intersections of Solarium Drive & Hidalgo Street with Jericho Road are also approved with this application as proposed. 2. Internal Public Roadways District Street Section and Right~of-Way Policy: District policy 7204.4.2 states, "developments with any buildable lot that is less that 1-acre in size will typically provide streets having a minimum pavement width of 32-feet with curb, gutter and sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this width may be allowed, depending on traffic volumes forecast to be generated by the development. Concrete sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-feet or more in which case the sidewalk shall be a minimum of 4-feet in width. District Island Policy: District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4-feet wide with a minimum area of 1 OO-square feet and designed to safely channel traffic. The roadway on either side of the traffic island should maintain a minimum of a 21-foot street section. District Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). Applicant Proposal: The applicant has proposed to construct three internal public roadways (Solarium Drive, Hidalgo Street & North Morpheus Avenue) as 36-foot street section with curb, gutter and 5-foot attached concrete sidewalk within 50-feet of right-of-way. The applicant proposes no two roadways within 125-feet of one another. The applicant proposes to construct one center island located to the west 3 Jericho Subdivision of the intersection of Solarium Drive and Jericho Road. The applicant proposes a 21-foot street section on either side of the center island. Staff Comment/Recommendation: The applicant's proposal for the internal public roadways locations and street sections are approved with this application as proposed. 3. Stub Streets District Stub Street Policy: District policy 7203.5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intra-neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Applicant Proposal: The applicant proposes to construct a stub street to the north, Morpheus Avenue, located approximately 115-feet east of the northwestern property line (measured property line to centerline). This stub street is proposed to connect to Morpheus Avenue, which is a proposed roadway within the Hightower Subdivision to the north of this site. The applicant proposes to construct a stub street to the west, Hidalgo Street, located approximately 115-feet north of the southwestern property line (measured property line to centerline). This stub street is proposed to connect to Tallinn Street, which is a proposed roadway within the Hightower Subdivision to the west of this site. Staff Comment/Recommendation: Construct a stub street to the north, Morpheus Avenue, located approximately 115-feet east of the northwestern property line (measured property line to centerline). This stub street is required to align with a proposed roadway within the Hightower Subdivision to the north of this site. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". This stub street exceeds 150-feet in length and so a temporary turnaround and street sign will be required if this street is constructed before the northern connection can be made. The applicant is required to construct a temporary turnaround and provide an easement to the public over Lot 1, Block 5 until such time as the connection is made, If and only if the northern connection is not made at the time of construction. Construct a stub street to the west, Hidalgo Street, located approximately 115-feet north of the southwestern property line (measured property line to centerline). This stub street is required to align with a proposed roadway within the Hightower Subdivision to the west of this site. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". This stub street does not exceed 150-feet in length; therefore, no temporary turnaround is required. 4 Jericho Subdivision 4. Alleys Alley Policy: District policy 7204.10.1 requires the minimum right-of-way width for new alleys to be 16-feet if: the alley is abutted by residential uses and zoning on both sides; and building setbacks required by the land use agency having jurisdiction provide sufficient space for the safe backing of vehicles into the alley; and 20-feet in all other situations. Dedication of clear title to the right-of-way and the improvement of the right-of-way, and acceptance of the improvement by the District as meeting its construction standards, are required for all alleys contained in a proposed development. Access Policy: Access is allowed to and from a fully improved alley (District policy 7204.10.2). Parking shall be designed so the minimum clear distance from the back of the parking stall to the opposite side of the alley is 22-feet for perpendicular parking. An access to an alley shall be located a minimum of 25-feet from the nearest public street. Intersection Policy: District Policy 7204.10.3 states a minimum of back-of-curb radius of 15-feet is required at all alley intersections. Design Policy: District policy 7202.6 states that alleys are not considered part of the traffic circulation system. Unless specifically approved by the District, an alley should not serve as primary access to a lot or building. Alleys shall connect to a public street at each end and shall not terminate in dead-ends. Alleys with curves are not allowed without specific District approval taken on good cause shown. Curves shall have a minimum inside radius of 26-feet. Applicant Proposal: The applicant has proposed two private alleys throughout the development: Alley A -an alley with a bend to the east connecting to Jericho Road & Solarium Drive; Alley B -an alley with a bend to the west connecting to Morpheus Avenue & Solarium Drive. Alley A is proposed to intersect Solarium Drive approximately 130-feet west of Jericho Road (measured centerline to centerline) and Jericho Road at the northeast property line. Alley B is proposed to intersect Solarium Drive approximately 130-feet east of Morpheus Avenue (measured centerline to centerline) and Morpheus Drive at the northwest corner of the subject site. Staff Comment/Recommendation: The intersections of the private alleys with the publiC streets meet District policy and are approve with this application as proposed. 5. District Tree Planters District's Tree Planter Width Policy prohibits all trees in planters less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the policy requires a minimum planter width of 6-feet for class II tress with the installation of root barriers on both sides of the planter strip or a minimum planter width of a-feet without the installation of a root barrier. The policy also requires Class I and Class III trees to provide a minimum planter width of 10-feet. Applicant Proposal: The applicant has not specifically identified trees on the Preliminary Plat application or site plan. Staff Comment/Recommendation: Staff understands that the use of trees may be determined at a later time. The applicant is being provided the current policy in effect at this time and is directed to work with Development Review Staff in regard to potentially planting trees in the public right-of-way. 5 Jericho Subdivision 6. Other Access Jericho Road is classified as a residential collector roadway: all access points to Jericho Road will be closed except the access specifically approved with this application: direct lot access to Jericho Road is prohibited and should be noted on the final plat. C. Site Specific Conditions of AllProval 1. Construct Jericho Road as a 36-foot residential collector street section (measured back of existing curb to back of new curb) and construct vertical curb, gutter and 5-foot attached concrete sidewalk within the existing right-of-way. 2. Locate the intersections of Solarium Drive & Hidalgo Street with Jericho Road as proposed. 3. Construct three internal public roadways (Solarium Drive, Hidalgo Street & North Morpheus Avenue) as 36-foot street section with curb, gutter and 5-foot attached concrete sidewalk within 50- feet of right-of-way. 4. Locate no two internal local residential roadways within 125-feet of one another. 5. Construct one center island in Solarium Drive, located to the west of the intersection of Solarium Drive and Jericho Road. Provide a minimum 21-foot street section on either side of the center island. 6. Construct a stub street to the north, Morpheus Avenue, located approximately 115-feet east of the northwestern property line (measured property line to centerline). This stub street is required to align with a proposed roadway within the Hightower Subdivision to the north of this site. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". This stub street exceeds 150-feet in length and so a temporary turnaround and street sign will be required if this street is constructed before the northern connection can be made. The applicant is required to construct a temporary turnaround and provide an easement to the public over Lot 1, Block 5 until such time as the connection is made, If and only if the northern connection is not made at the time of construction. 7. Construct a stub street to the west, Hidalgo Street, located approximately 115-feet north of the southwestern property line (measured property line to centerline). This stub street is required to align with a proposed roadway within the Hightower Subdivision to the west of this site. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". This stub street does not exceed 150-feet in length; therefore, no temporary turnaround is required. a. Locate the two private alleys, as proposed: Alley A -an alley with a bend to the east connecting to Jericho Road & Solarium Drive; Alley B -an alley with a bend to the west connecting to Morpheus Avenue & Solarium Drive. 9. Jericho Road is classified as a residential collector roadway: all access points to Jericho Road will be closed except the access specifically approved with this application: direct lot access to Jericho Road is prohibited and shall be noted on the final plat. 10. Comply with all Standard Conditions of Approval. 6 Jericho Subdivision D. Standard Conditions of Awroval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 3a7 -62aO (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 3a7-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees is required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 7 Jericho Subdivision E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 4. Development Process Checklist a Jericho Subdivision 9 Jericho Subdivision .! II ,Ii ~~ U .~~ 2 ~ ; p ~ , ~I I ;!~-h ~ II ' II 51 : _ i~ q: 'I . i t;\ i ~ I ;l; ~ 1'\ !. ~ I ..-..." I ~~ ; ~ ~d( ~ i ~ I. .. ~ : f ~ [ ~ , ~ ~ I ill~ I ;IJ " ~~ -.. UNPLA1"l'BlI I ~ .....~ ~LI' ~!i1"" 'J "~-_"-'1.,.'I'- ....W' . '-,'- ',- ,--'-------\ ,~H, ,,' ~ r- -r- - ; \~ ~--~,..-w(-;;;'-~--~-~:~j~I\:r \ ..# 1""1 _ ....--. ~~'"-_"".. H t"'" '.... -:)... _' I'll A.JI. \ -....::--< ~,,-' . '-- - \ " ~ 5q:;;:~ Tl~' -' . ---- "-+--- --j--'\~ -, r--: , }l'; -'\i-, I, ' <!! )T' ~!~~, !.. !_. B~. B~.\i&. B.. l~. 'k.,,~..L I, I ~...- ~~ .. -- ~. '* ~ . \_~...>("q ~I ___-... f-"\'-..:.. I!li ~ ~ 1 ,': i It . _ t----- iii iij" ~ 1-,--- - Ti.lIIIIIi-o;.c-- -lJr----- - - - J i :. "1 =. .., - ~ 'I: ~ .....-..'"" 1"" .,.".~ I ~,~ -. ,; · · -." I -.;; · i=' IS,." ." J' It~ ~1' i' 1;:!li't I'" .. '" ~ III 'II: III '" I~ 'lI i. ~ ,1; ~ i 1 /\ ~_; _Ii t6" Il .. IIIIlJ ~ __ _~._~a " III i oJ';' "I ! \ / ',I ""- l( -,,,-:.--.--- . -- . --- -.. = -.. 11\1 fj - 'I: I, ~ ~~ . l\ -.". '1"-' ..." ! -'"1 . P I"..t t. t I~'~/!t I" I~; · : ; ~ ~ 0 . I '\.-.. , -. .1.',' i ," ~ ~ Il -- ~ ~ liE ~~ .:. " \. -. "I' _ ,.._ ."~_ _ ..... ': .':, i~ ~ ! :... · .Ff " '-..-~. ~1 ~ ~-.-~:;;';'~I !i ,-- - - , : \ ~ ~ .... . ~ '~__'-~. ." ( ,_: .1. ' ~ _._;-: ":-:~~f1;-tr \.!,'./ - . " -- +' , Ii' I i IV il,. .~, I' , --,'--::-:-~ I ~~l 'I :"',~ -, . . . . "\ ~ T. i ,j~r ." I .~' -. u · ~ ~dt 1,1 :.. -~'--~J~r-'!19 "1~, ~ ';'" '\ L_,.,-- I _______u. ~.. FT "~I 'k'@IJ i I'~ Ib'i. I r~\ \ I ; ~"C~----~~"<"~ ~~ ~. ;.,; :--6:::;.0~'- .~ .~ '... M . ~~, -. , / ,~l :.~, ~n_''"--I:'':'- - :!-~ _. ~[ ~,;-; I( -- - ~ \':o_-oc. --..... "~.....~.' -- - _~ "II' 1-:'-"'--==-- I Ii! " 'ADA-cou~r io: -t---1j I ," '" :-; L!1 ~ I: 1 : , I I I I I wesrSDROUCll SUBDIVISION aK '17, PG 9684 ~. I '" ~ '''''"I li; ~ i 1111 \ \ i ! I t I I II ! t: : ' I I I " I I 11 k\:! IT i I UUiil;il;;:BI PEIII ~ ~ ~li Iii!! i.1 i Iii H ' I 'j i : II H' , II ; H1~ 11hltl t~t J' : II :1 i Ii ~ III ; 111111 ! ill i I i I ; 1;111 ~ ! h~~lpiS; I Ii j I I~ I Ii~ - S' F ~ ~ ~ii~& r" :I ~I B.~I~II~!; ,!I~i~q ~.I~ 5 :~ml~;II. E ir.,t.;i I a -I j. ~ ~ I ~ ~ ~"lJnp JERICHO ENGINEERING -- PlANNER I COHTACT · t SUBDIVISION 'SOWTIONS", KCi('t MaIl'.AY ~IJ-.-i PREU!oUNARY PlAT 1M!. A1KDd.smt. m ~ ~i ~ 11G1i:.i-IlfM~Sl,a1(:' ";:;"::"'7.''::'~= WtJ:.1I.-16 IfII).lfllllllkJ$1114r:t~~M~t.4Ilotli-.iJL 1'Q.i..~lIMil. ...jt_....J.ioi..'IbI..,..... ~=/i.~f' ! ~IClI,CI>>IIY.~O ....C2Gl:ld~ I'iIoCb!ll___' ......_'''...MII'_>f+W r.....__l~~...'"""'_!ol 10 ~ OWNERS OF RECORD IitJlQtl.IWEIl ~:mw: WIiII~~II.c;AMi~ 62i.\~=~tUlP 62JJ.1isr..ts.=:ia~MWJ 1U3~~::htr,j =~~::~ "'-(2~lm-~ "-_~II:P Jericho Subdivision Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 11 Jericho Subdivision II Development Process Checklist II I8ISubmit a development application to a City or to the County I8IThe City or the County will transmit the development application to ACHD IZIThe ACHD Planning Review Division will receive the development application to review I8IThe Planning Review Division will do ~ of the following: DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating that if the developrnent is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. IZIWrite a Staff Level report analyzing the impacts of the development on the transportation systern and evaluating the proposal for its conformance to District Policy. DWrite a Commission Level report analyzing the impacts of the development on the transportation systern and evaluating the proposal for its conformance to District Policy. IZIThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter: . The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) . The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER? Construction Zone o Driveway or Property Approach(s) . Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. o Working in the ACHD Right-of-Way . Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 s.f. of concrete or asphalt. Construction (Subdivisions) o Sediment & Erosion Submittal . At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Stormwater Division. o Idaho Power Company . Vic Steelman at Idaho Power must have his IPca approved set of subdivision utility plans prior to Pre-Con being scheduled. o Final Approval from Development Services ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 12 Jericho Subdivision