Loading...
HomeMy WebLinkAboutCC - Engineer Statement km E N G I N E E R I N G March 4, 2025 Project No. 24-286 City of Meridian 33 E Broadway Ave., Ste. 210 Meridian, Idaho 83642 RE:Apex Phenomenal Subdivision To Whom It May Concern: Please accept this letter a certification that the centerline elevations of the proposed street within Apex Phenomenal Subdivision are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical investigation, "Apex West Subdivision", prepared by Atlas and dates February 8, 2022, was used to determine he approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require additional information. Sincerely, KM Engineering, LLP Digitally signed by Scott Prillaman DIN:cn=Scott Prillaman,c=US,o=KM Engineering,email=sprillaman@kmengllp.com Date:2025.03.04 14:29:51-07'00' Scott Prillaman, P.E. Project Manager 5725 North Discovery Way • Boise, Idaho 83713 • 208.639.6939• kmengllp.com