HomeMy WebLinkAboutCC - Narrative Cent ur io n Eng ineer s, Inc .
2323 S. Vista Ave Suite 206 1 Boise, ID 83705 1 208.343.3381
City of Meridian Community Development Department
Planning Team
Meridian City Hall 33 E Broadway Avenue
Meridian, ID 83642
208.888.4433
February 25, 2025
Dear Planning Team,
We are pleased to submit the final plat for Addison Circle for your review.
The Site: Addison Circle Subdivision has frontage along Black Cat Road and an unimproved connection to
W.Torana Street at the end of a cul-de-sac.Settlers Canal is along the northern boundary; Black Cat Road
provides the eastern boundary; Rapid Creek Subdivision is to the south,and Oakcreek Subdivision is on
the west.The site is 1.87 acres in area.
TheAppiication. City Council approved application AZ PP H-2024-0040 on December 17, 2024.The
approval required one off-site improvement to construct an asphalt pathway from the north property
boundary to connect to an existing pathway near the canal crossing.That detail is included in the
construction plans.
Substantia/Comp/iance; The final plat is in substantial compliance with the approved preliminary plat
and meeting all requirements and conditions of approval.The plat conforms to all other required
provisions of the UDC.The plat conforms to acceptable engineering,architectural and surveying practices
and local standards.
The P/at:There are seven single family home lots and one landscape buffer lot along the full length of
Black Cat Road.The residential lots range in size from 4,985 square feet to 7,546 square feet.The
landscape buffer lot is 8,705 square feet.We have made the following changes to the final plat as
required by the conditions of approval:
• We have dedicated 50 feet of public right-of-way to AND for Black Cat Road.
• We are providing a landscape buffer that is a minimum of 25 feet wide along the Black Cat Road
right-of-way.
• We have added a micropath connecting Torana Street and Black Cat Road.
• We have submitted a revised landscape plan addressing the required tree mitigation, micropath
connection,and fencing.
In addition,ordinance#25-25-2077 was authorized by the Meridian City Council,and the development
agreement(instrument#2025-015307) has been recorded.
Thank you for taking the time to review this final plat. Please feel free to call with any questions.
Sincerely,
David A Crawford
President
Centurion Engineers, Inc. G 'NTURI�ti
dacrawford@centengr.com
Over a Century of Engineering Excellence
��C[Nf-