Loading...
HomeMy WebLinkAboutCC - Engineers Statement CENTURION ENGINEERS, INC. Joseph D.Canning,PE City of Meridian CEO 2323 S.Vista Ave Ste 206 33 E. Broadway Ave. Boise, ID 83705 Meridian, ID 83642 208.343.3381 208.888.4433 dacrawford@centengr.com June 11,2024 SUBJECT: ADDISON CIRCLE SUBDIVISION STREET FINISH CENTERLINE ELEVATION STATEMENT City of Meridian We are in receipt of a geo-technical engineering report from Atlas dated February 22„ 2024. The report from Atlas indicates that seasonal high groundwater is anticipated to remain at depth of greater than 9-feet below ground surface. 2 test pits were dug on the project site.The following identifies the relevant elevations from the report and construction plans: Existing ground Elevation Groundwater Elevation Test Pit 1 2540 2535 The lowest design elevation of the Roadway is 2540.15. Based on the above information the finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation Sincerely, PROSE Joseph D.Canning,PE. CEO Centurion Engineers, Inc. Ica Ay D. GcNTuRl�ti Over a Century of Engineering Excellence Page 1 of 1 '!�VC+IN EC"h