HomeMy WebLinkAboutSite Amenity Plan �• BHP = _ P �P OHS Engineer, Landscape Architect, Q =
CLM
OHP OHP OHP OHP Land Survey:
1°' - W W SD- W W W W W SD W D -W W W W W W W W Property Owner/Developer. O� SD
S 8"SS EAST FRA LIfSFi0A6 8"SS SD — � — — — — — — —_��� — — � _ _ _ Sp- _ _ --
m,,,- r
D KENDRA H. LACKEY AND RYAN BENSON THE LAND GROUP, INC.
L - -- 0 M� ------ � r - — - - - - T UCH ARK 462 E. SHORE DR., SUITE 100 Oct
• �� BOL BOL Z IR
cs 4 — . — — — _ _ _� _ _ 18'GIRR f$ —F���--- !- 5150 SW GRIFFITH DRIVE EAGLE, ID 83616
• ••� L E RR G BEAVERTON, OR 97005-2935 PH: 208.939.4041
E I I
M CONTACT:JASON DENSMER, PE (CIVIL ENGINEER)
TBM 1 `w Ms I Project Summary: CONTACT: BOB SCHAFER PLA (LANDSCAPE ARCHITECT)
rof4,
I I CONTACT: MIKE FEMENIA, PLS (LAND SURVEYOR)
Q PROJECT LOCATION: A PARCEL OF LAND LOCATED IN THE NORTH HALF OF THE
LU SECTION 16,TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN,ADA
* COUNTY, IDAHO.
60 EXISTING ZONING: L-0
I I 10, PROPOSED ZONING: C-C, C-G, L-0 (TO REMAIN)
FLOODPLAIN: THE PROPERTY DOES NOT LIE
BG` r WITHIN AN ESTABLISHED FLOOD +
I i HAZARD AREA.
18"GIRR Notes:
/ I
STREET B — — JJ(1L „ JN ,STREET B— -W
TS
m
— — — — — — — — — — �—I ——— — ——— — ——- — — — — — —— / 1. THIS SUBDIVISION IS SUBJECT TO COMPLIANCE WITH IDAHO CODE SECTION 31-3805 CONCERNING IRRIGATION USE.
\ 2. ALL LOTS WITHIN THIS SUBDIVISION WILL BE PROVIDED WITH DOMESTIC WATER SERVICE BY THE CITY OF MERIDIAN.THE PROPOSED WATER MAINS SHALL BE
EG CONNECTED TO EXISTING CITY OF MERIDIAN WATER MAINS TO PROVIDE SERVICE TO THE SUBDIVISION.
c- i / EGEG 3. ALL LOTS WITHIN THIS SUBDIVISION WILL BE PROVIDED WITH SANITARY SEWER SERVICE BY THE CITY OF MERIDIAN.THE PROPOSED SEWER MAINS SHALL BE
~ EG CONNECTED TO EXISTING CITY OF MERIDIAN SEWER MAINS TO PROVIDE SERVICE TO THE SUBDIVISION.
I�� I - E�
— — IRR ------------- EG
00
EG 4. A PRESSURIZED IRRIGATION SYSTEM OWNED AND OPERATED BY THE DEVELOPER WILL BE INSTALLED TO SERVE THE LOTS.
IRR
\ �Q 5. THIS PROPERTY IS NOT WITHIN A MAPPED SFHA AS SHOWN ON THE FLOOD INSURANCE RATE MAP, COMMUNITY PANELS NO. 16001CO251J WHICH BEARS AN
AREA ONE \ ,AREA TWO IRR EFFECTIVE DATE OF JUNE 19, 2020 AND 16001CO252G WHICH BEARS AN EFFECTIVE DATE OF FEBRUARY 19, 2003.
AW' 6. THE STREETS AS SHOWN WILL BE PRIVATE.
- —STREET D — — 7. SURFACE STORM WATER DRAINAGE SHALL BE MANAGED ON-SITE IN ACCORDANCE WITH CITY OF MERIDIAN REQUIREMENTS. EASEMENTS SHALL REMAIN FREE OF
ti � ALL ENCROACHMENTS AND OBSTRUCTIONS (INCLUDING FENCES AND TREES)WHICH MAY ADVERSELY AFFECT DRAINAGE OR OPERATION AND MAINTENANCE OF THE
96
_. E _ S88°49'\1 .03"E r DRAINAGE FACILITY.
\ �T9FFTo 241.4 5 � 8. THIS DEVELOPMENT RECOGNIZES SECTION 22-4503 OF IDAHO CODE, RIGHT TO FARM ACT,WHICH STATES: NO AGRICULTURAL OPERATION OR APPURTENANCE TO IT
SHALL BE OR BECOME A NUISANCE, PRIVATE OR PUBLIC, BY ANY CHANGED CONDITIONS IN OR ABOUT THE SURROUNDING NONAGRICULTURAL ACTIVITIES AFTER THE
SAME HAS BEEN IN OPERATION FOR MORE THAN ONE (1)YEAR,WHEN THE OPERATION WAS NOT A NUISANCE AT THE TIME THE OPERATION BEGAN; PROVIDED,THAT
\ \ THE PROVISIONS OF THIS SECTION SHALL NOT APPLY WHENEVER A NUISANCE RESULTS FROM THE IMPROPER OR NEGLIGENT OPERATION OF ANY AGRICULTURAL
OPERATION OR APPURTENANCE TO IT.
9. MINIMUM BUILDING SETBACKS SHALL BE IN ACCORDANCE WITH THE CITY OF MERIDIAN APPLICABLE ZONING AND SUBDIVISION REGULATIONS AT THE TIME OF
\ / — ISSUANCE OF INDIVIDUAL BUILDING PERMITS OR AS SPECIFICALLY APPROVED AND/OR REQUIRED, OR AS SHOWN ON THIS PLAT.
IRR'
Survey Data:
VV
SUOU WAY — / / 1. SEE PLAN VIEW ON THIS SHEET FOR LOCATIONS OF THE FOLLOWING BENCHMARKS.
TBM 1:
NORTHING: 706800.085'
EASTING: 2466113.437'
ELEVATION: 2663.96'
TBM 2:
/ —- - NORTHING: 705012.465'
,.- - - \N EASTING: 2466498.204'
/ / - _ i ELEVATION: 2669.29'
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1983 (NAVD83)
3. THE BASIS OF BEARING OF THIS MAP IS GRID NORTH ON THE IDAHO STATE PLANE COORDINATES SYSTEM (NAD83),WEST ZONE,AS DETERMINED BY GLOBAL
POSITIONING SYSTEMS METHODS. ANY DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN U.S. SURVEY FEET.
-, _ - • Legend:
L _ — — — SECTION LINE — — — — — — — — — EASEMENT
PROPERTY BOUNDARY SS GAN EXISTING SEWER LINE W/MANHOLE
— — R/W RIGHT-OF-WAY LINE W EXISTING WATER LINE
' EXISTING POND - � PARCEL LINE GIRR EXISTING GRAVITY IRRIGATION LINE
\ SS f rT �: - — CENTERLINE PROPOSED CURB
\ T-
a ADJACENT PROPERTY LINE B#L# BLOCK&LOT NUMBER
EXISTING OPEN \
.`
SITE L'
\ f II r. E FRANKLIN RD. -- '°�- — - a)
- [+� bit
_ w
J
Q
/ 7XI91k 'A
z "' � S.TOUCHMARK WAY
84
- - A1777
REA THREE
• vi-84 - k"1 f y, 3 �
a" 3 y
w cc c
Ak,
- - TBM 2 o E. OVERLAND RD. •hw �'' ` r+� E CIO l-
— a I w lie
00
co
•� -
On co
r ' VICINITY MAP 0 1500' 30° o 0 0
00 CD
Horizontal Scale: 1"=1500'
Revisions 10
1. 04/17/2025-CITY COMMENTS
- - - - - - - - - -
- NOT FOR
■ �• /
I
CONSTRUCTION
3 Project No.: 123003
Date of Issuance: 12.20.2024
I
r — ■ •�• Project Milestone: PUD-CUP Mad-DA Mod-Rezone
Zi
_ _ _ _ Site and Amenity Plan
Dig Line, Inc.
MST PUD-CUP Mod=DA Mod-Rezone-Site and Amenity Plan 1° 2° Call Before You Dig/
Horizontal Scale: 1" = 100' TM
8„ 1 ■oo
° Project Calculations
°
A. LANDSCAPE REQUIREMENTS AND CALCULATIONS: Q
i
° �� � (9 � ° ARTERIALS UJ = O
35-FT MINIMUM BUFFER WIDTH (ENTRYWAY CORRIDOR). REQUIREMENT: 1 TREE PER 35 L.F.
/ cQ
1 (D �p`��P ° (EAST FRANKLIN ROAD): BUFFER LF TREES REQUIRED TREES PROVIDED = a
2
2 do °
D \ O COLLECTORS
° 20-FT MINIMUM BUFFER WIDTH (*LINEAL FEET OF STREET INCLUDES BOTH SIDES OF PARKWAY WHERE
2 V IV / 1 O APPLICABLE). REQUIREMENT: 1 TREE PER 35 L.F. I
2 2 *9 0 ° 0 (SOUTH TOUCHMARK WAY): BUFFER LF TREES REQUIRED TREES PROVIDED
° 10 \ *2,602 LF 74 81 (81 EXISTING)
2 \ S
LOCAL
1 10-FT MINIMUM BUFFER WIDTH. (*LINEAL FEET OF STREET INCLUDES BOTH SIDES OF PARKWAY WHERE
p
J�� 2 - = APPLICABLE). NO TREE REQUIREMENT FOR LOCAL ROADS.
°
2 \ \ PR 2 / \ ♦ (STREET A): BUFFER LF TREES REQUIRED TREES PROVIDED
*634 LF 0 0
O
�o
I (STREET B): BUFFER LF TREES REQUIRED TREES PROVIDED
o *1,880 LF 0 0
1 10
\\ (STREET C): BUFFER LF TREES REQUIRED TREES PROVIDED
/ O *528 LF 0 0
_ (STREET D): BUFFER LF TREES REQUIRED TREES PROVIDED
O *1,744 LF 0 0
L 2 ° O / O (SOUTH WORTHY WAY): BUFFER LF TREES REQUIRED TREES PROVIDED
*2,772 LF 0 0
LANE SOUTH ARBOR : BUFFER LF TREES REQUIRED TREES PROVIDED
l 2 ( )
/ l *646 LF 0 0
I
� O B. BUFFERS TO ADJACENT USES:
i 10 25-FT MINIMUM BUFFER WIDTH. REQUIREMENT: 1 TREE PER 35 L.F.
1 °
° COMMERCIAL TO
f I 2 ' ° MULTI-FAMILY BOUNDARY: BUFFER LF TREES REQUIRED TREES PROVIDED
620 LF 18 18
I \ ° LIGHT INDUSTRIAL TO
I MULTI-FAMILY BOUNDARY: BUFFER LF TREES REQUIRED TREES PROVIDED
2 ° / 232 LF 7 7
2 2 ° ° 1 ° _ °/ C. PATHWAY CALCULATIONS (EXCL. SUBDIVISION SIDEWALKS):
\ O O - / REQUIREMENT: 1 TREE PER 100 L.F. PATHWAY TREES SHALL BE PLANTED ALONG 10' MULTI-USE PATHWAY
2 ° / THROUGHOUT THE SITE, AS DEPICTED ON PLAN.
10-FT MULTI-USE PATH: LINEAR FEET TREES REQUIRED TREES PROVIDED
3,700 LF 37 37
' I °
1 ° / D. OPEN SPACE CALCULATIONS:
I ° NOTE: COMMON OPEN SPACE CALCULATION DOES NOT INCLUDE RIDENBAUGH CANAL AREA AND OPEN
\ SPACE EXPECTED WITHIN MULTI-FAMILY, TOWNHOME, OFFICE, COMMERCIAL, AND INDUSTRIAL PARCELS.
x REQUIREMENT: 1 TREE PER 5,000 S.F.
I � TOTAL COMMON
OPEN SPACE: SQUARE FEET TREES REQUIRED TREES PROVIDED
486,842 SF (10.5%) 97 97
` Landscape Notes:
E. TREE MITIGATION CALCULATIONS:
REQUIREMENT: FOR EVERY CALIPER INCH REMOVED THERE SHALL BE A CALIPER INCH REPLACED. *SEE
1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR TREE MITIGATION NOTES FOR METHOD OF MITIGATION.
PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK.
2. ALL EXISTING TREES OUTSIDE OF WORK LIMITS WILL BE RETAINED AND PROTECTED. F. AMENITY LIST:
3. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, LE..... FROM BEING BLOWN OVER,
PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. TOTAL SITE SIZE: 111 ACRES (1 POINT PER 5 ACRES-AT LEAST ONE AMENITY PER AMENITY
4. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND CATEGORY).
x SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
5. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3"DEPTH OF MEDIUM BARK CHIPS. AMENITIES TO BE LOCATED ON THE MULTI-FAMILY PARCEL WITH A FEW NOTED EXCEPTIONS.
6. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE LIST IS AS FOLLOWS:
OF ACCEPTANCE BY OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY
CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. QUALITY OF LIFE:
7. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE CLUBHOUSE (5,000 S.F. OR GREATER) -6 POINTS
WITH SITE GRADING PLAN. EXISTING FOUNTAIN AT TOUCHMARK ENTRANCE-2 POINTS
8. IN ALL PLANTER BED AND LAWN AREAS,THE TOP 6 INCHES OF TOPSOIL WILL BE AMENDED AT A OPEN SPACE COMMONS-3 POINTS
RATIO OF 3 CUBIC YARDS OF COMPOST/ORGANIC MATTER PER 1000 SQUARE FEET. ROTO-TILL EXISTING DOG PARK-2 POINTS
ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. ALL TREE PITS SHALL BE A MIX OF SEVEN
I PARTS TOPSOIL (AS SPECIFIED IN THESE NOTES) AND THREE PARTS COMPOST/ORGANIC MATTER, BY RECREATION ACTIVITY AREA AMENITIES:
VOLUME. PLAYGROUND-3 POINTS
9. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER
MANUFACTURER'S RECOMMENDATIONS. PEDESTRIAN OR BICYCLE CIRCULATION SYSTEM AMENITIES:
10. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18"OF TOPSOIL, SOD AREAS A MINIMUM OF 12"OF MULTI-USE PATHWAYS -2 PER 1/4 MILE (3,700 LINEAL FEET) -5 POINTS
TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3"
BELOW SURFACE OF WALKS AND CURBS IN PLANTING BED AREAS, AND 1/2"IN LAWN AREAS. MULTI-MODAL AMENITIES:
I 11. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE.VERIFY SUITABILITY OF SURFACE SOIL TO BICYCLE STORAGE-2 POINTS
l PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A
LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS,WEED SITE AMENITIES: 23 FITS (22 PTS REQUIRED @ 1 POINT PER 5 ACRES OF GROSS DEVELOPED
l SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL AREA.)
DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A)
PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS E. TOTAL TREES AND SPECIES:
APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES
ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER TOTAL TREES: 306 (91 EXISTING) y
l EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. NUMBER OF TREE SPECIES: 18
12. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS
FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, '
l BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES
IN ANY DIMENSION,AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. # CALLOUT NUMBERS COORDINATED
13. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS Keynotes: TO NUMBERED NOTES BELOW.
TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY,WELL-DRAINED SITES
I WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. 1. VISION TRIANGLE PER MERIDIAN CITY CODE.
l 2. SAVE AND PROTECT EXISTING TREES SEE TREE PROTECTION NOTES SHEET C1.03. ■�
14. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE ( )�
OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 3. REMOVE EXISTING TREE. SEE TREE MITIGATION NOTES SHEET C1.03.
I 15. ALL LANDSCAPED AREAS SHALL BE EQUIPPED WITH A PRESSURIZED IRRIGATION SYSTEM 4. SAVE AND PROTECT EXISTING TREES, LANDSCAPE, MONUMENT SIGN, AND FOUNTAIN AMENITY.
l
CONSTRUCTED TO CITY OF CALDWELL MUNICIPAL IRRIGATION DISTRICT(CMID) STANDARDS.THIS 5. SAVE AND PROTECT PORTION OF DITCH.
PRESSURIZED AUTOMATIC UNDERGROUND SPRINKLER SYSTEM SHALL PROVIDE COMPLETE 6. EXISTING PORTION OF DITCH TO BE PIPED.
COVERAGE AND BE PROPERLY ZONED FOR REQUIRED WATER USES. 7. SAVE AND PROTECT EXISTING CANAL.
8. SAVE AND PROTECT EXISTING POWER POLES AND POWER LINES.
9. SAVE AND PROTECT EXISTING PARK STRUCTURE AND PARK AREA. cc cc
Tree Protection Notes: 10. SAVE AND PROTECT EXISTING POND.
r � N
A. PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL ROOT ZONE �i �
IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.) Legend: J= = LU �
A.A. CONSTRUCT PROTECTIVE FENCING OF CHAIN-LINK AROUND THE CRITICAL ROOT ZONE PRIOR TO LO
DEMOLITION OR CONSTRUCTION. LANDSCAPE AREA. Q
A.B. DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING (COMMON OPEN SPACE). M —
DEMOLITION. O O oZS
A.C. DO NOT ALLOW CEMENT TRUCKS TO RINSE WITHIN THE PROTECTION AREA,ANYWHERE THAT TREE o
1 ROOTS EXIST OR IN PLANNED PLANTING BEDS. o PROPOSED DECIDUOUS AND CONIFER TREE LOCATION. M
A.D. DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA.
A.E. MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE ° SEE PLANT SCHEDULE FOR TREE SPECIES LIST.
RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK. -- -- SITE PROPERTY LINE Revisions 1Q
A.F. DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL ROOT VISION TRIANGLE
I ZONE. 1. 04/17/2025-CITY COMMENTS
\ A.G. ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE ROOTS. PLANT SCHEDULE
/ B. PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE:
2 \ B.A. OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES.
B.B. PRUNING OF PUBLIC PROPERTY TREES SHALL BE PERFORMED BY A LICENSED ARBORIST. BOTANICAL/COMMON NAME
C. ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED USING THE
I FOLLOWING CRITERIA: CLASS I TREES
CERCIS CANADENSIS/EASTERN REDBUD MULTI-TRUNK
/ 2 \ EXISTING TREE REPLACEMENT CERCIS CANADENSIS'NC2016-2'/FLAME THROWER® EASTERN REDBUD
/ 1"TO 6"CALIPER.........................2X CALIPER OF TREE REMOVED MALUS X'SPRING SNOW'/SPRING SNOW CRABAPPLE
\ 6"TO 12"CALIPER......................1.5X CALIPER OF TREE REMOVED MAGNOLIA X SOULANGEANA/SAUCER MAGNOLIA
2 > 12"OR LARGER CALIPER.........1 X CALIPER OF TREE REMOVED
\ EXAMPLE: IF AN 8" CALIPER TREE IS REMOVED, AN ACCEPTABLE REPLACEMENT WOULD BE (3) 4" CLASS II TREES
ACER TRUNCATUM X PLATANOIDES 'WARRENRED' TM/PACIFIC SUNSET MAPLE
I / CALIPER TREES OR(4)3"CALIPER TREES. BETULA NIGRA'BNMTF'TM/DURA HEAT RIVER BIRCH
O GINKGO BILOBA'PRINCETON SENTRY'/PRINCETON SENTRY MAIDENHAIR TREE
Tree Mitigation Notes: GLEDITSIATRIACANTHOSINERMIS'SHADEMASTER'/SHADEMASTER HONEY LOCUST
1 / LIRIODENDRON TULIPIFERA/TULIP POPLAR NOT FOR
MERIDIAN, IDAHO UDC SECTION 11-313-10-5A: MITIGATION SHALL BE REQUIRED FOR ALL EXISTING TREES TILIA TOMENTOSA 'STERLING' /STERLING SILVER LINDEN
/ 1 \ FOUR-INCH CALIPER OR GREATER THAT ARE REMOVED FROM THE SITE WITH EQUAL REPLACEMENT OF THE
TOTAL CALIPERS LOST ON SITE UP TO AN AMOUNT OF ONE HUNDRED (100) PERCENT REPLACEMENT(EXAMPLE: CLASS III TREES
TWO (2)TEN-INCH CALIPER TREES REMOVED MAY BE MITIGATED WITH FOUR 5-INCH CALIPER TREES, FIVE (5) CATALPA SPECIOSA/NORTHERN CATALPA
\ FOUR-INCH CALIPER TREES, OR SEVEN (7)THREE-INCH CALIPER TREES). DECIDUOUS SPECIMEN TREES PLATANUS X ACERIFOLIA'BLOODGOOD'/BLOODGOOD LONDON PLANE TREE
FOUR-INCH CALIPER OR GREATER MAY COUNT DOUBLE TOWARDS TOTAL CALIPERS LOST,WHEN PLANTED AT QUERCUS MACROCARPA/BUR OAK OO 0
ENTRYWAYS, WITHIN COMMON OPEN SPACE, AND WHEN USED AS FOCAL ELEMENTS IN LANDSCAPE DESIGN. QUERCUS RUBRA/RED OAK
/ - - *NOTE: FINAL TREE MITIGATION CALCULATIONS TO BE DETERMINED AT FUTURE CZC SUBMITTALS. ANY CONIFERS CONSTRUCTION
l CALIPER INCH THAT IS UNABLE TO BE PLANTED ON SITE, SHALL BE DONATED TO THE CITY OF MERIDIAN. PICEA ABIES/NORWAY SPRUCE
PICEA PUNGENS'FAT ALBERT'/FAT ALBERT COLORADO SPRUCE Project No.: 123003
PILAUS FLEXILIS 'VANDERWOLF'S PYRAMID' /VANDERWOLF'S PYRAMID LIMBER PINE Date of Issuance: 12.20.2024
I PILAUS PONDEROSA/PONDEROSA PINE Project Milestone: PUD-CUP Mod-DA Mod-Rezone
Ei
a a
Site and Amenity Plan -
Dig Line, Inc. Area Three
Ma PUD=CUP Mod=DA Mod-Rezone-Site and Amenity Plan - Area Three 50 100 C all Before You Dig!
Horizontal Scale: 1" = 50' ,h
811 C1 ■03