Loading...
HomeMy WebLinkAboutStaff Comments - Solitude Sub 2 FP STAFF REPORT: CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT ~g /,'''"'."' .~, \..A1Cndt:r't \ ID,'\tiO I. Hearing Date: February 20, 2007 Transmittal Date: February 15, 2007 TO: Mayor and City Council FROM: Kristy Vigil, Assistant City Planner 'fJ/ 208-884-5533 Michael Cole, Development Services Coordinator 208-898-5500 . (Y\ c RECEIVED FEB ~ ~- 2001 SUBJECT: Solitude Subdivision No.2 City of Meridian City Clerk Office Request for Final Plat Approval of Solitude Subdivision NO.2 Consisting of 120 Single-Family Residential Building Lots and 13 Common Area Lots on 34.74 Acres in an R-8 Zone by Solitude Development, LLC (File# FP-07-002). We have reviewed this submittal and offer the following comments and conditions of the applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION The applicant, Solitude Development, LLC, has applied for final plat approval of 120 single-family residential building lots and 13 common area lots on 34.74 acres ofland for Solitude Subdivision No.2. The zoning designation for the proposed subdivision is R-8 (Medium Density Residential). The gross density of the proposed subdivision is 3.45 dwelling units per acre; the net density is 5.22 dwelling units per acre. Solitude Subdivision NO.2 is located on the south side of West McMillan Road and on the east side of North Meridian Road in the NW ~ ofT. 4N., R. IE., Section 31. This property has not been previously platted. The City Council approved the preliminary plat for Solitude Subdivision on April 11 , 2006 and the submitted fmal plat substantially complies with the approved preliminary plat. Staff recommends approval of Solitude Subdivision No.2 with the comments and conditions stated in this report. SITE SPECIFIC CONDITIONS 1. Applicant is to meet all terms of the approved annexation (AZ-06-007), development agreement (Inst. # 1 06133466), and preliminary plat (PP-06-006) for this subdivision. 2. The Final Plat approval for this subject phase shall expire 18-months from the signature of phase 1. 3. A pedestrian pathway along Meridian Road that extends the entire length of the western subdivision boundary (including the 5-acre out parcel) shall be installed prior to occupancy of any new dwelling units on this property. FP-07-002 Solitude Subdivision No.2 FP.doc PAGE 1 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT 4. The applicant has indicated that Settlers Irrigation District will own and operate the required pressurized irrigation system in this development. Therefore an email from Settlers indicating plan approval, pressure irrigation system ownership and approved license agreement shall be submitted prior to scheduling of a pre-construction meeting. 5. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If a single-point connection is used, the developer shall be responsible for the payment of assessments for the irrigable common areas prior to signature on the final plat by the Meridian City Engineer. 6. All fencing installed on the site must be in compliance with UDC 11-3A-6 and 11-3A-7. Temporary construction fencing to contain debris shall be installed at the subdivision boundary where permanent fencing does not exist. Perimeter fencing shall be installed prior to release of building permits for this subdivision. 7. Sanitary sewer and water service to this site is being proposed via extensions of existing mains installed in phase #1. Applicant will be responsible to construct the sewer and water mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. 8. The applicant shall coordinate with Public Works, prior to plan approval, to ensure the sewer main is being routed in a manner that enough depth is preserved to meet the elevation of the lift station in Cobre Basin Subdivision. 9. The applicant shall field verify the elevation of the sewer stub to this property from Cobre Basin to ensure that the flow direction is correct. 10. Include the instrument number of the ACHD sidewalk easement shown on the face of the plat. 11. Prior to signature on the final plat include the book and page numbers for Solitude Place #1 on the face of the plat. 12. The bearings of the lines common to Cobre Basin Subdivision do not seem to match the bearings of record. Please confirm this and include any bearings of record in parenthesis on the face of the plat. 13. Revise or add the following note(s) on the face of the plat prepared by Engineering Solutions, LLP., stamped on 01/04/07 by D. Terry Peugh, prior to signature of the final plat by the City Engineer: 8.) Add Lot 17, Block 17. 10.) Revise to read, "Per City efMeridiBfl reqtlKem.eBts, all Fencing adjacent to Lot 20, Block 5 shall be a maxiR'ffiffi of fOlH" feet high if eeflstrueted of selid, sight obsouriflg fl'laterial in compliance with the applicable zoning regulations of the City of Meridian at the time of submittal. 14. The landscape plan, prepared by Harvest Design and dated 12/29/06 shall be revised as follows: a. Include lawn symbol on the plan. b. Include tree acronym in the material legend (CKNM, RFC, et cetera). c. The conifer symbol on the plan does not match the conifer symbol on the material legend, revise accordingly. FP-07-002 Solitude Subdivision No.2 FP.doc PAGE 2 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT d. A six-foot open vision fence or four-foot solid fence is required adjacent to the micropaths located on Lot 20, Block 5 and Lot 5, Block 11. e. Include details for fencing on Lot 20, Block 5 and Lot 5, Block lIon the plan (picture & description) . f. Include details for the tot lot and gazebo on the plan (pictures). g. Add one tree to Lot 1, Block 16 adjacent to McMillan Road. Submit three copies of the revised landscape plan to the Planning Department prior to signature on thefinal plat by the City Engineer. 15. Submit a copy of the Ada County Street Name Committee's "Final" letter for the street names and lot & block numbering. Make all corrections necessary to comply. 16. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention facilities incorporated into the approved open space are subject to UDC 11- 3B-11 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space lots, except as permitted under UDC 11-3B- 11. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. If the stormwater detention facility cannot be incorporated into the approved open space and still meet the standards of UDC 11~3B-ll, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of final construction. 17. Complete the Certificate of Owners and the accompanying acknowledgement. 18. Staff s failure to cite specific ordinance provisions or conditions of the preliminary plat does not relieve the Applicant of responsibility for compliance. GENERAL REQUIREMENTS 1. Per UDC 11-3A-6 all irrigation ditches, laterals or canals, exclusive of natural waterways, that intersect, cross or lie within the area heing !';uhdivided shall be covered. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department prior to plan approval. If lateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer. 2. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base shall be approved by the Ada County Highway District, and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 3. A letter of credit or cash surety in the amount of 110% shall be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 4. All development improvements, including but not limited to water, sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. 5. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the FP-07-002 Solitude Subdivision No.2 FP.doc PAGE 3 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. 6. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat. 7. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 8. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 9. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. 10. All development features shall comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. 12. Approval of the preliminary plat shall become null and void if the applicant fails to record the final plat within two years of the approval of the preliminary plat per UDC 11-6B-7 A. In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if submitted within successive intervals of eighteen months, may be considered for final approval without resubmission for preliminary plat approval per UDC 11-6B-7B. STAFF RECOMMENDATION Staff recommends approval of the final plat for Solitude Subdivision No.2 (FP-07-002) with the above stated comments and conditions. FP-07-002 Solitude Subdivision No.2 FP.doc PAGE 4