The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL- PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location and
specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document
Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways
Project Manager. Interactive Pathways Map
2. Prior to final approval the applicant shall dedicate a public access easement for a multi-use pathway (10'
wide detached sidewalk)along both sides of W Grand Mogul Way,for the length of the project. Match/align
with pathway that has already been constructed in the eastern portion of the project.
Because of the alignment of 1-84 in this location and steep fill slopes along Black Cat Road approaching the
future freeway overpass, no pathway will be required in the landscape buffer along 1-84. (This had been
stated as a requirement in preliminary reviews.)
Additionally, 10' detached multi-use pathway will be required along the future mid-mile collector road
planned along the west edge of the project.
Easements shall be a minimum of 14'wide (10' pathway+2' shoulder each side.) Easements need only be
dedicated for multi-use pathways that lie outside the public ROW.
Use standard City template for public access easement. Submit all easements online through Citizen's
Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as recommended by
project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final approval the applicant's
engineer shall provide written documentation that the pathway segment was constructed per the
recommended specifications.
4. The owner (or representative association) of the property affected by each public access easement shall
have an ongoing obligation to maintain the multi-use pathway.
5. If applicable, 6' high open vision fencing shall be installed between pathways and (live) water irrigation
canals and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other fence
details per UDC 11-3A-7.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)as required
for constructing within,or crossing, irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation
district,the developer shall work with Pathways Project Manager to achieve a pathway design that meets
both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to)
override those of the irrigation district having jurisdiction over the project area.