Loading...
HomeMy WebLinkAboutPublic Utility Plan 1i1, IIII BLOCK 2 - II III IIII � 2551 ' \ I IIII IIII _ — — — — 2552 I I II III Conceptual Future Development — N I \ 1, III III (Subject to Change) Cn CD � CO x1 7 � IIII IIII FUTURE PUBLIC ACHD ROADWAY TO BE I W. Grand Mogul Dr. (Existing) �JJ I CONSTRUCTED AND DEDICATED WITH - II r I DEVELOPMENT OF LOT 3, BLOCK 2 \ I I III III ICD 7�1 TEMPORARY ROADWAY STUB WATER MAIN FOR FUTURE I '�AIN FOR FUTURE TURNAROUND AND IEDl i CONTINUATOSTUN WITH SATER TE DEVEELOMENT \\ CONTINUATION WITH SITE DEVELOPMENT I F ACHD EASEMENT — — — — — — — — —r - - r ,r I _ STUB WATER MAIN FOR IIII fill — _— 2552 — "PIRR_ ___ _ ___ "PIRR _ _ —— R _ _ "PIRR ___ — ——— — "PIRR_ _ _—— " FUTURE CONTINUATION 1 l I I d li I — a — —— PIRR__ _ _ _ _ 6 IRR_ _ I I a d \ I _ _ - - - AI — - - II I x 1 12"W 12"W X 12"W 12"W 12"W x c� 12"W 12"W w 12"W 12"W x x x SSMH 22 SSMH 21 x m X � �zll I ----- — � — � I— — �8„SSI I — 8„ S — � — W — 5 — � � W — SS — � 5 — 'SS w — 5 38+00 a I 6 00 35+00 34+00 33+00 32+0 31+00 30+00 29+00 28+00 27+00 26+00 , — 25+ 0 24+00 23+00 22 0 21+00 �0+00 — FIRE DEPARTMENT AND fi i — — — PUBLIC TURNAROUND \ Ill i ll���N — a 2553 - - - \— � - - - -- - - -- - - - - - -- - - -- - - - - - - - - - - - - -- - - - - - - -— IRR 6 P 6 PIRIf� 6 SSMH 20 6 PIRR — — — PIRR —— SiPIR PER IFC APPENDIX D l I � ��I � up}{}R- �-P+f�R — �P1RRr— — —— SSMH 19 I EX SSMH 18 I l I \\ P7� J STAGRANDM 98�±L, OFF: 0.00L PROPOSED ACHD DRAINAGE — tEXISTING� EASEMENTS AT DRAINAGE SYSTEMS �+- — = � MATCH EXISTING — I STUB WATER MAIN FOR FUTURE I — — — _ = I STUB WATER MAIN FOR FUTURE Ili CONTINUATION WITH SITE DEVELOPMENT 2�� — (TYP, NOT ALL LOCATIONS DETERMINED) PROPOSED CITY OF MERIDIAN EASEMENTS AT UTILITY I — _ _ 2553 h CONTINUATION WITH SITE DEVELOPMENT \ \ � STUBS (TYP, NOT ALL LOCATIONS DETERMINED) —2555 II IIII �4 � _ - - - -2556— _ — '�\25S5 \ � I - - _ I — — 2554- BLOCK 3 - \ 5 I Conceptual Future Development — i (Subject to Change) - I II _ —2558_ —I I � � I - - - - - II Illi - - - - - - _ _ _ — 2557- - - - - - - - - - - - - - \ I —4 y W. Grand Mogul Dr - Concept Improvements 0 60' 120' Horizontal Scale: 1" = 60' GRAND OGUL P2: Sta. 20+00 - 38+20 0 2559 RIZ NTAL ALE: 1" = 60' + 2559 o � M VERTIC L SCALE: 1' = 2' LO CO N M J CD W co ti Lf) + O I- cc� O co Q U� co 6) M T N M O 2556 w N � N 2556 00 J CV + n w PROPOSED GRADE AT CENTERLINE 00 Q o � N -0.45% � �' � w(!) N m J 0.45% � w 0.45% -0.40% 2553 �� _ ____ — ——— — 2553 y _ ---------- ---- --- --------- ���\ ------ ---- — — o0 ■� �� II BEGIN PROJECT ■� STA: 21+98± II EXISTING GROUN�AT CENTERLINE 1 EL: 2552.47± 2550 2550 y � in 328-LF OF 8-IN PVC AT 0.60% EXISTING EX SSMH 18 01 � SSMH 22 ° 48-IN MH PER ISPWC SD-501 48-IN MH PER ISPWC SD-501 STA: 22+20.28, 3.67'L STA:33+70.56, 6.00'L I 209- RIM:2552.24± ■� SUMP: 2543.65 LF OF g-IN PVC AT 0.40% IE IN:2543.75,8-IN PVC (W) 2547 2547 RIM: 2554.10± ° IE OUT:2549.31,8-IN PVC (E) IE OUT:2543.65,8-IN PVC (E) � O SSMH 21 400 LF OF 8-IN PVC AT 0.40% ■� 48-IN MH PER ISPWC SD-501 STA: 30+42.90, 6.00'L RIM: 2555.51± SSMH 20 �/� 48-IN MH PER ISPWC SD-501 213-LF OF 8-IN PVC C/ CJ IE IN: 2547.34, 8-IN PVC (W) STA: 28+33.71, 6.00'L AT IE IN: 2547.34, 8-IN PVC (S) RIM: 2554.57± 2544 2544 IE OUT: 2547.24, 8-IN PVC (E) 190-LF OF 8-IN PVC AT 0.40% IE IN: 2546.40, 8-IN PVC (W) SSMH 19 IE OUT: 2546.30, 8-IN PVC (E) 48-IN MH PER ISPWC SD-501 STA: 24+33.71, 6.00'L cc RIM: 2552.77± EXISTING ELEVATION AT CENTERLINE PROPOSED ELEVATION AT CENTERLINE IE IN: 2544.70, 8-IN PVC (W) IE IN: 2544.70, 8-IN PVC (S) ■ 2541 IE OUT: 2544.60, 8-IN PVC (E) 2541 z co CO M co co O I_ c0 LC) N I� O co co M N LO r c0 ti O N Q Lq Lf) (D (D (.O M N N N M M 6) N M L() (D L() O M I� � r � I� O N LS7 00 O co CO � r 6) CO co O CO LC) N O (` � N co N N N N N N N N N N N N N N N N N N N N co M coco M N N N co co �_ O M M M M M L, LC) LC) 11 L, M M M M N N N N LC) LO LP) Lf) LC) L, LC) L, LC) LO LC) Lf� LC) Lf� LC) Lf� LC) LO LC) Lf� LC) X) LC) X) LC) L, LC) L, LC) L, LC) Ln LC) L, LC) L, LC) Ln LC) Ln Lf) Lo LC) LO L() L, L() L, U-) L, L() U-) Lf7 L() LC) LC) n Ln n Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Cq n Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln LU _ N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N CW Q G g 38+20 37+80 37+20 36+60 36+00 35+40 34+80 34+20 33+60 33+00 32+40 31+80 31+20 30+60 30+00 29+40 28+80 28+20 27+60 27+00 26+40 25+80 25+20 24+60 24+00 23+40 22+80 22+20 21+60 21+00 20+40 20+00 Revisions 1. i SOUTH SIDE NORTH SIDE i I i I i I i I 44'PROPOSED RIGHT-OF-WAY 18'ACHD SIDEWALK AND 18'ACHD SIDEWALK AND PUBLIC UTILITY EASEMENT 22 22 PUBLIC UTILITY EASEMENT 2' 2' 40'BACK TO BACK 2' 2' � I � 10, 8' 12' 12' 12' 8' 10, MULTI-USE PATHWAY PLANTER 2 THRU TWO WAY LT.TURN THRU 2 PLANTER MULTI-USE PATHWAY 1 i 3.1 �'IpNAL p cL 1.75% --0.25% &PROFILE GR DE LINE 1.75% +0 25% c��' �G\ST l� -2.00% -2.00% -1 10961 111� III—III—III III—III —� —III- —III IIII IIII IIII IIII I; -1 =I �_� I=III-1 I-III-1 -1 l I I III Ili 9Te OF \oP� V CONSTRUCT 10-FT MULTI-USE it it CONSTRUCT 10-FT MULTI-USE �SoN DEN PATHWAY PER ACHD SUP SD-709 PATHWAY PER ACHD SUP SD-709 a2/18/2025 3-IN ASPHALT, SP 3, 0.50 IN COMPACTED NATIVE SUBGRADE COMPACTED NATIVE SUBGRADE (112") MIX, PG 64-28 6-IN VERTICAL CURB &GUTTER Project No.: 124186 4-IN OF 3/4" MINUS CRUSHED AGGREGATE BASE, TYPE 1 PER ACHD SUPP SD-701 Date of Issuance: 0217 2025 3 20-IN OF 6"MINUS UNCRUSHED AGGREGATE BASE 4-IN OF 3/4" MINUS CRUSHED AGGREGATE BASE, TYPE 1 CONSTRUCT FULL-DEPTH ROADWAY BASE SECTION. Project Milestone: PRELIMINARY PLAT EXTEND 6" MIN. BEYOND BACK OF CURB. g W. Grand Mogul Dr. - 3 Lane Collector - Typical Section Concept Improvements - r 12 N E a Scale: NTS �1 PIP 03