Loading...
HomeMy WebLinkAboutPP 03 Concept Improvements • T I 1 I CV BLOCK 2 I I I r N I I T w �' Conceptual Future Development I 91 (Subject to Change) CD I - ao X AVENUE"A"PUBLIC ACHD ROADWAY TO BE L I W. Grand Mogul Dr. (Existing) T I CONSTRUCTED AND DEDICATED WITH w I DEVELOPMENT OF PHASE 3. SEE SHEET PP04. TEMPORARY ROADWAY TURNAROUND AND I STUB WATER MAIN FOR FUTURE I 'LU T�Tff_ ACHD EASEMENT ' CONTINUATION WITH SITE DEVELOPMENT � STUB WATER MAIN FOR FUTURE , � - � �X 40'FC-FC - � CONTINUATION WITH SITE DEVELOPMENT � , _ 40' FC-FC F, ,� STUB WATER MAIN FOR I I " " " —— — 6" IRR — LLLIIJ /,0#To I �— - --- - 6PIRR - --- - I I -- - 6PIR6 - -- - --- 6PIRR - - --- - --6PIRR --- - - ——— — ——— — ——— — ——— — ——— — ——— — ——— — ——— — ——— — ——— u _ -6PIRR - - -- _ FUTURE CONTINUATION I i e 7T/ 1i - Al nAA1 -- c�— 12"W 12"W 12"W 12"W x xX 1 12W 2W X 12W 12W 12W SSMH 221 �� � SSMH 21 x x �� � � m �� �� X w x.x I i — — + — 8"SSA 11 8, S — — SS — w I— "SS — I ISo—I — 8'1SS —I — "SS Ss — 37 09 6 00 35+00 34+00 33+00 32+0 31+00 30+00 29+00 28+00 27+00 26+00 25+ 0 24+00 23+00 r22 0 21+00 20+00 FIRE DEPARTMENT AND — o ° ° 18" D 18" PUBLIC TURNAROUND I� i I I I a _ I I _ _ _ a _ I I a - I - - -- - -- - - -- - - - - - - -- - - -- - - - - - - - - - - - I I I — J-- -- - - - - - - - - - -- - - - - - -- - - °-- - -- - - -- SSMH I I I 6PIRR --- - --- - --- 6PIRR PER IFC APPENDIX D r I i I °P}f}R- frP{{}R P RR-- — R 6 P 6 PIR 6 SSMH 20. — — — — --62IBB-- - - �.P1B� - -- - - -- x _ _ 19 EX SSMH 18 L PROPOSED ACHD DRAINAGE r T 40'FC-FC ! _ _ _ _ _ _ _ _ kFC0'C L J GRAN 1 +-98±_P2 EXISTING STA: 21+98±, OFF: 0.00' EASEMENTS AT DRAINAGE SYSTEMS - - — MATCH EXISTING STUB WATER MAIN FOR FUTURE I I LSTUB WATER MAIN FOR FUTURE CONTINUATION WITH SITE DEVELOPMENT (TYP, NOT ALL LOCATIONS DETERMINED) PROPOSED CITY OF MERIDIAN EASEMENTS AT UTILITY i I CONTINUATION WITH SITE DEVELOPMENT H L STUBS (TYP, NOT ALL LOCATIONS DETERMINED) FF BLOCK 3 I I I I I I I I Conceptual Future Development (Subject to Change) li I II I I I I I I W. Grand Mogul Dr - Concept Improvements - Phase 1 & 2 60' 120' Horizontal Scale: 1" = 60' GRANDIMOGUL P2: Sta. 20+00 - 38+20 O 2559 HORIZONTAL SCALE: 1" = 5' o + 2559 cfl M (D VERTIC L SCALE: 1" = 0' F- Cn N m CD LU co ti LC) + O r 00 O co Q � co O N N M r 2556 (D w Cn N N co 2556 CDLU coN QLn PROPOSED GRADE AT CENTERLINE Q o U) N -0.45% W N CD w � w 2553 � II II iIII -- — — ___--- 2553 —_ —————— ---- --------- ---- --___ ————————————---- --- y BEGIN PROJECT ■ EXISTING GROUND AT CENTERLINE EL:: 2552 4 7± 2550 2550 y 328-L11111111 F OF 8-IN PVC AT 0 60% EXISTING EX SSMH 18 SSMH 22 ° 48-IN MH PER ISPWC SD-501 48-IN MH PER ISPWC SD-501 STA: 22+20.28, 3.6711- Cc STA: 33+70.56, 6.00'L I 209- RIM: 2552.24± ■� 0.40% SUMP: 2543.65 2547 RIM: 2554.10± ° LF OF g_IN PVC AT IE IN: 2543.75, 8-IN PVC (W) 2547 IE OUT: 2549.31, 8-IN PVC (E) IE OUT: 2543.65, 8-IN PVC (E) O cc SSMH 21 400 LF OF 8-IN PVC AT 0.40% ■ 48-IN MH PER ISPWC SD-501 STA: 30+42.90, 6.001L RIM: 2555.51± SSMH 20 mime 48-IN MH PER ISPWC SD-501 213-LF OF 8-IN PVC IE IN: 2547.34, 8-IN PVC (W) STA: 28+33.71, 6.00'L AT 0.40% IE IN: 2547.34, 8-IN PVC (S) RIM: 2554.57± 2544 �2544 IE OUT: 2547.24, 8-IN PVC (E) 190-LF OF 8-IN PVC qT 0.40% IE IN: 2546.40, 8-IN PVC (W) IE OUT: 2546.30, 8-IN PVC (E) SSMH 19 48-IN MH PER ISPWC SD-501 STA: 24+33.71, 6.001L cc RIM: 2552.77± EXISTING ELEVATION A CENTERLINE PROPOSED ELEVATION AT CENT RLINE IE IN: 2544.70, 8-IN PVC (W) IE IN: 2544.70, 8-IN PVC (S) ■� 2541 IE OUT: 2544.60, 8-IN PVC (E) 2541 z Lf) co LD Lf) M L.O to co co r` O r` r ti � co � W M LC) N N N � N � M O � M Lf) O ti M Cb N CA LC) r W N M � � � � O (.fl N � ti O M Q r` r r` O CV M M O co C.o r M cm co O 00 LO N O r— � N co N M N N M N M N M N N N N N N ,� N ,� N Lf') N Lf') N N N N N M N M CO M M C6 M N M N co N N N N N M M �_ O LC') 11 Lf) U") U') U") LC') ,n U') X) LO X) L() LO L() LO L() X) LC') LS") LC') LS") LC') Ln LC') Ln LC') Ln LC') LO LO Ln L() Ln L() LS") L() LO LO Ln L() LO L() Ln L() Ln LC) Ln L() LS") LC) L() L() L() LO ,n Lr) 1l LO ,1-) Ln ,1-) Lr) ,n Ln ,1-) Ln ,1-) Lr) U-) Lr) LO Lr) ,1-) Lr) LO Lr) LO Lr) ,n Lr) ,n Lr) ,n Lr) ,n Ln Lr) Lr) ,n Lr) ,n Lr) ,n Ln ,n Lr) LO Ln Ln Ln Ln LO Ln Ln Ln Ln Ln Ln Ln _ N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N CW Q G g 38+20 37+80 37+20 36+60 36+00 35+40 34+80 34+20 33+60 33+00 32+40 31+80 31+20 30+60 30+00 29+40 28+80 28+20 27+60 27+00 26+40 25+80 25+20 24+60 24+00 23+40 22+80 22+20 21+60 21+00 20+40 20+00 Revisions 10 1. SOUTH SIDE NORTH SIDE I I I I I 44'PROPOSED RIGHT-OF-WAY 18'ACHD SIDEWALK AND 18'ACHD SIDEWALK AND PUBLIC UTILITY EASEMENT 22 22 PUBLIC UTILITY EASEMENT 2' 2' 40,BACK TO BACK 2' 2' 4 1 10, 8' 2, 12' 12' 12' 2, 8' 10' d 1 MULTI-USE PATHWAY PLANTER THRU TWO WAY LT.TURN THRU PLANTER MULTI-USE PATHWAYaL I 1.75% ±0.25% &PROFILE GRADE LINE 1.75% ±0.25% -2.00% -2.00% —11 .�H71 ��1 � �� III .,,,III � h/� III III = III III �,.111�_r� - o1QaL _III, ;III- -1 -1 I_, -1 -1 -1 -1 -1 -1 -1 I— 1 = _ _ = �N — — I I I I I I I I I—III—III—III=1 I I—III—III=1 I I-1 I I-1 I I—III—III—III-1 I I—III-1 11- I— III„ III III III III III III �\ST —I —1 =1 -1 III;III—III—III—III—III—III— I —III=1 I—III—III—III—III- -1 —I —III—III—III—III—III—III—III—III—III—I —III— -1 1= CONSTRUCT I0-FT MULTI-USE III III, III II II III III III, ,I I I I III —III I I I I I .I I I„ III III III III III III III III 10 J61 '—"�—I��—i I I=i i i=i i i=i i i=i i i CONSTRUCT 10-FT MULTI-USE PATHWAY PER ACHD SUP SD-709 PATHWAY PER ACHD SUP SD-709 3-IN ASPHALT, SP-3, 0.50-IN COMPACTED NATIVE SUBGRADE s o COMPACTED NATIVE SUBGRADE (1/2") MIX, PG 64-28 6-IN VERTICAL CURB &GUTTER >qTe OF \�P� 4-IN OF 3/4" MINUS CRUSHED AGGREGATE BASE,TYPE 1 PER 4-IN OF 3C4" MINUS CRUSHED AGGREGATE BASE,TYPE 1 CA OF DEN�� 20-IN OF 6"MINUS UNCRUSHED AGGREGATE BASE CONSTRUCT FULL-DEPTH ROADWAY BASE SECTION. 04/2q/2025 EXTEND 6"MIN. BEYOND BACK OF CURB. Project No.: 124186 W. Grand Mogul Dr. - 3 Lane Collector - Typical Section Date of Issuance: 04-29-2025 3 1 Project Milestone: PRELIMINARY PLAT Scale: NTS E Concept Improvements g $E¢' o PP 03