April 7, 2025
Sonya Allen
Associate City Planner
City of Meridian
33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
RE: McKay Farms Subdivision
Groundwater elevations
Dear Sonya,
A geotechnical evaluation for the project site was performed by Innovate Geotechnical,with subsurface
soil information summarized in their report dated March 24, 2025. According to the reports, seasonal
high groundwater can be anticipated at depths from approximately 6.5-ft to 8-ft below the existing
ground surface. Based on the information provided in the geotechnical reports,the roadway finished
grade centerline elevations were designed to be more than 3-feet above the anticipated groundwater
elevations.
Please feel free to contact me at (208) 860-1623 if you have any questions
Sincerely,
R L.
W. Scott Wonders, PE