HomeMy WebLinkAboutCC - Engineer Statement km
E N G I N E E R I N G
February 7,2025
Project No.24-164
City of Meridian
33 E Broadway Ave.,Ste.210
Meridian, Idaho 83642
RE: Apex Northwest Subdivision No.6
Meridian,Idaho
To Whom It May Concern:
Please accept this letter as certification that the centerline elevations of the proposed streets within Apex
Northwest Subdivision No. 6 are designed a minimum of three (3)feet above the seasonal high ground water
elevation. The geotechnical investigation, "Apex West Subdivision", prepared by Atlas and dated February 8,
2022, was used to determine the approximate groundwater elevations relative to the street centerline
elevations.
Please feel free to contact me at 208.639.6939 should you have questions or require any additional information.
Sincerely,
KM Engineering,LLP
SS\ON AL
f NG
ENS 0
NSFD
<" Digitally signed by
Lachlin Kinsella
6860 Date:2025.02.07
tl�, 2/7/25 o Q 15:22:46-07'00'
OF \�P �
C. K\NS
Lachlin Kinsella, P.E.
Project Manger
5725 North Discovery Way 0 Boise,Idaho 83713 208.639.6939 kmengllp.com