HomeMy WebLinkAboutPZ - Staff Report
City of Meridian | Department Report I. Project Overview
HEARING
DATE:
4/17/2025
TO: Planning & Zoning Commission
FROM: Linda Ritter, Associate Planner
208-884-5533
lritter@meridiancity.org
APPLICANT: Mike Maffia, MGM Meridian 2
SUBJECT: TEC-2025-0001
Sadie Creek Drive-Through
LOCATION: 3030 N. Cajun Lane, located in the NE ¼
of Section 5, Township 3N, Range 1E
(Parcel # S1105110120)
PROJECT OVERVIEW
A. Summary
Request for a two (2) year time extension for the (H-2021-0006) due to delays caused by adverse
market conditions, including increased construction costs and limited tenant interest. The City is
also processing an application for a Development Agreement Modification to separate this
property from the current Development Agreement.
B. Issues/Waivers
The property was originally purchased with the intent of leasing to Starbucks, but they ultimately
decided not to proceed. Since then, the applicant has actively marketed the site and now has
strong interest from a reputable regional credit union looking to build a new branch. Their plan
includes a drive-through, which is essential to their operations.
C. Recommendation
Staff recommend approval of the proposed time extension for a time period of two (2) years as
requested for the application to expire on April 1, 2027.
D. Decision
Pending
COMMUNITY DEVELOPMENT
DEPARTMENT REPORT
City of Meridian | Department Report II. Community Metrics
COMMUNITY METRICS
Table 1: Land Use
Description Details Map Ref.
Existing Land Use(s) Commercial -
Proposed Land Use(s) Commercial -
Existing Zoning General Retail and Service Commercial District (C-G) VI.A.2
Proposed Zoning General Retail and Service Commercial District (C-G)
Adopted FLUM Designation Mixed-Use Regional (MU-R) VI.A.3
Proposed FLUM Designation Mixed-Use Regional (MU-R)
Table 2: Process Facts
Description Details
Preapplication Meeting date 1/28/2025
Neighborhood Meeting 2/13/2025
Site posting date 4/3/2025
STAFF ANALYSIS
A. General Overview
Per UDC 11-6B-7C, “Upon written request and filing by the applicant prior to the termination of
the period in accord with subsections A and B of this section, the director may authorize a single
extension of time to obtain the city engineer's signature on the final plat not to exceed two (2)
years. Additional time extensions up to two (2) years as determined and approved by the City
Council may be granted. With all extensions, the director or city council may require the
preliminary plat, combined preliminary and final plat or short plat to comply with the current
provisions of this title.”
Table 3: Project Overview
Description Details
History CUP-2021-0006; Centrepoint Mixed Use MDA, H-2022-0035 DA Inst.
#2022-079000, TED-2023-0002
B. History
On April 1, 2021, the Planning and Zoning Commission approved a Conditional Use Permit
(CUP) for the Sadie Creek Drive-Through establishment (H-2021-0006) that is within 300 feet of
another drive-through. The CUP approval was valid for a period of two (2) years. A Certificate
of Zoning Compliance and Design Review will still need to be submitted and approved by the
Planning Division prior to the Building Permit submittal.
A time extension was requested and approved by the Director (TED-2023-0002) for a two (2) year
time extension in order to commence the use as permitted in accord with the conditions of approval,
satisfy the requirements set forth in the conditions of approval, and acquire building permits and
commence construction of permanent footings or structures on or in the ground. The time extension
is valid until April 1, 2025. The applicant stated additional time is needed to complete the transfer
in ownership due to delays related to inflation resulting in higher construction costs.
The applicant is now requesting an additional two (2) year time extension due to delays caused by
adverse market conditions, including increased construction costs and limited tenant interest. Per
the applicant, this additional time will allow them to work with a reputable credit union who has
shown interest in purchasing the property and building a new branch which includes a drive-
through which is essential to their operations.
City of Meridian | Department Report IV. City/Agency Comments & Conditions
CITY/AGENCY COMMENTS & CONDITIONS
A. Meridian Planning Division
1. The applicant shall comply with all the previous conditions of approval associated with this
development except as modified with this approval and compliance with any future
amendments approved with this Development Agreement Modification application.(CUP-
2021-0006; PBA A-2018-0361 (ROS #11747, Parcel F); Centrepoint Mixed Use MDA H-
2022-0035 DA Inst. #2022-079000, TED-2023-0002).
2. A Certificate of Zoning Compliance and Design Review is required to be submitted, reviewed
and approved by the Planning Division prior to the Building Permit submittal.
3. The applicant is required to dedicate twelve (12) feet of right-of-way to the Idaho
Transportation Department (ITD) and reconstruct the right turn lane to current ITD standards
as the southbound right turn lane on SH- 55 (Eagle Rd) onto East Seville Lane does not meet
current ITD standards.
B. Idaho Department of Environmental Quality (DEQ)
https://weblink.meridiancity.org/WebLink/Browse.aspx?id=391630&dbid=0&repo=MeridianCit
y
C. Idaho Transportation Department (ITD)
https://weblink.meridiancity.org/WebLink/Browse.aspx?id=391630&dbid=0&repo=MeridianCit
y
ACTION
A. Staff:
Staff recommend approval of the proposed TEC application and find it in conformance with the
Comprehensive Plan and the UDC with the conditions included in Section IV.
B. Planning and Zoning Commission:
Pending
City of Meridian | Department Report VI. Exhibits
EXHIBITS
A. Project Area Maps
(link to Project Overview)
1. Aerial
2. Zoning Map
City of Meridian | Department Report VI. Exhibits
3. Future Land Use
4. Planned Development Map
City of Meridian | Department Report VI. Exhibits
B. Approved Site Plan (date: 1/27/2021)
C. Approved Landscape Plan (date: 1/27/2021)
City of Meridian | Department Report VI. Exhibits
D. Existing Conditions
City of Meridian | Department Report VI. Exhibits
E. Service Accessibility Report