Loading...
HomeMy WebLinkAboutZ - Approved Order BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: APRIL 1, 2025 ORDER APPROVAL DATE: APRIL 8, 2025 IN THE MATTER OF THE ) REQUEST FOR A 2-YEAR TIME ) EXTENSION ON THE ) CASE NO. TECC-2025-0002 PRELIMINARY PLAT FOR SKY ) MESA COMMONS NO. 5 IN ) ORDER OF CONDITIONAL ORDER TO OBTAIN THE CITY ) APPROVAL OF TIME EXTENSION ENGINEER'S SIGNATURE ON ) THE FINAL PLAT,LOCATED IN ) SECTION 32, T.3N., RJE, ) MERIDIAN, IDAHO ) BY: TODD TUCKER, BOISE ) HUNTER HOMES ) APPLICANT This matter coming on regularly before the City Council on April 1, 2025, upon the Applicant's submittal of a preliminary plat time extension application for a 2-year extension within which to obtain the City Engineer's signature on a final plat for Sky Mesa Commons No. 5, which preliminary plat was originally approved on September 5, 2017, as provided in Unified Development Code § 11-6B-7C, and good cause shown. An administrative time extension TED- 2022-0006 for 2-years was previously approved for this subdivision by the Planning Director on March 1, 2023 and would have otherwise expired on February 25, 2023. IT IS HEREBY ORDERED THAT: The above named Applicant is granted an additional 2-year extended period of time, until ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR SKY MESA COMMONS NO. 5 (TECC-2025-0002) Page 1 of 2 February 25, 2027, within which to obtain the City Engineer's signature on the final plat, subject to the conditions of approval as shown in the attached Staff Report for the hearing date of April 1, 2025 incorporated by reference. Attached: Staff Report for the hearing date of April 1, 2025 By the action of the City Council at its regular meeting on the 8th day of April , 2025. DATED this 8th day of April , 2025 Mayor Robert E. Simison Attest: Chris Johnson, City Clerk Copy served upon the Applicant,Planning Division,Public Works Department,and City Attorney. 4-8-2025 BY: Dated: ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR SKY MESA COMMONS NO. 5 (TECC-2025-0002) Page 2 of 2 COMMUNITY DEVELOPMENT C��fEPIDIAN*,,--, DEPARTMENT REPORT HEARING 4/1/2025 Legend - DATE: Project Location i Area of impact TO: Mayor& City Council ::- I : City Limits o FROM: Linda Ritter,Associate Planner 0 Analysis 208-884-5533 Irifter@meridiancity.org , APPLICANT: Todd Tucker,Boise Hunter Homes SUBJECT: TECC-2025-0002 ---' I I I I Sky Mesa Commons No. 5 I J IL- LOCATION: West of S. Eagle Rd.,midway between _ E. Taconic Dr. and E. Lake Hazel Rd, a located in the NE '/4 of the SE '/4 of Section 32,Township 3N,Range lE (Parcel#R0988260484) I. PROJECT OVERVIEW A. Summary Request for a two (2)year time extension on the Sky Mesa preliminary plat(H-2017-0068)in order to obtain City Engineer's signature on Sky Mesa Commons No. 5 final plat(FP-2020- 0021). The final plat consists of 13 buildable lots and one(1) common lot on four(4) acres of land in the R-8 zoning district for the fifth and final phase of Sky Mesa Subdivision. B. Recommendation Staff recommends approval of the proposed time extension for a time period of two(2)years as requested for the application to expire on February 25,2027. C. Decision Pending City of Meridian I Department Report 1. Project Overview I1. COMMUNITY METRICS Table 1: Land Use Description Details Map Ref. Existing Land Use(s) Residential - Proposed Land Use(s) Residential - Existing Zoning R-4/R-8 VLA.2 Proposed Zoning R-4/R-8 Adopted FLUM Designation Medium Density Residential VLA.3 Proposed FLUM Designation Medium Density Residential Table 2: Process Facts Description Details Preapplication Meeting date 2/11/2025 Neighborhood Meeting 2/13/2025 Site posting date 3/21/2025 III. STAFF ANALYSIS A. General Overview Per UDC 11-613-7C, "Upon written request and filing by the applicant prior to the termination of the period in accord with subsections A and B of this section,the director may authorize a single extension of time to obtain the city engineer's signature on the final plat not to exceed two(2) years. Additional time extensions up to two(2)years as determined and approved by the City Council may be granted. With all extensions,the director or city council may require the preliminary plat, combined preliminary and final plat or short plat to comply with the current provisions of this title." Table 3: Proiect Overview Description Details History H-2017-0068 Sy Mesa Subdivision;FP-2020-0021,TED-2022-0006;DA 2017-119308 B. History On March 23,2021,the City approved the Final Plat for Sky Mesa Commons No. 5 (FP-2020- 0021)which was found to be consistent with the approved Preliminary Plat(H-2017-0068). On March 1, 2023, a two-year time extension was approved for Sky Mesa Common No. 5 as requested by the applicant due to the economic recession and the applicant developer needed additional time to complete the fifth phase of the subdivision. The applicant has now requested an additional two(2)year time extension in order to obtain the City Engineer's signature on the approved Final Plat, Sky Mesa Commons No. 5. due to the reconstruction of Eagle Road from E. Taconic Drive intersection to the E. Lake Hazel Road intersection. Per the applicant,this additional time will allow ACHD to complete the reconstruction of Eagle Road,which will alleviate the access,marketing,and pricing issues caused by the construction. City of Meridian I Department Report II. Community Metrics E �ti 7 r�ti7��TPb i r. RL .41 P. 4 2 m �ti r R _ � I �►Yal WER gCURRENTLY ; ram ti Ar E _hAE FAZEL RQ+kb 4 The Sky Mesa subdivision is a total of 98.35 acres and located within two different zoning designations R-4(63.85 acres) and R-8 (34.50 acres). The R-4 zoning district requires 12%open space and the R-8 zoning district requires 15%open space for a combined total of 12.837 acres of qualified open space. When the Sky Mesa subdivision was originally approved the Unified Development Code only required 10%open space for the entire development. Currently, 94.36 acres have been developed,and 15.296 acres(16.2%)of open space has been provided,which is 2.459 acres more open space than what is required by the new code. Because the overall Sky Mesa Subdivision has already provided 2.49 acres more open space than what is required under the current code, additional open space is not required to be provided with this final phase of development. City of Meridian I Department Report III. Staff Analysis Further,the required amenities under the current standards would require 20 points of qualified site amenities. The amenities approved include a total of 23 points which exceed the current standards. Based on the analysis above, staff is not recommending the addition of any new conditions of approval. IV. CITY/AGENCY COMMENTS & CONDITIONS A. Meridian Planning Division 1. The applicant shall comply with all terms of the Annexation and Preliminary Plat conditions of approval(H-2017-0068 findings) and Final Plat conditions of approval(FP-2020-0021); and development agreement(Inst.No. 2017-119308). 2. The applicant shall obtain the City Engineer's signature on the Final Plat by February 25, 2027,in accord with UDC 11-6B-7 in order for the Preliminary Plat to remain valid; or request another time extension. V. ACTION A. Staff: Staff recommend approval of the proposed TECC application and find it in conformance with the Comprehensive Plan and the UDC with the conditions included in Section IV. B. City Council: The Meridian City Council heard these items on April 1,2025. At the public hearing.the Council moved to approve the subiect time extension request. 1. Summary of the City Council public hearing a. In favor: Todd Tucker. applicant b. In opposition:None C. Commenting: Brian Bolt stated he was prepared to talk about the two-year extension and the reason for or the rationale for it being extended out and the McKay Subdivision being dependent on the utilities being provided as part of Sky Mesa Commons No. 5. But since he learned the McKay Farm Subdivision was purchased by Boise Hunter Homes,he did not have any further comments. d. Written testimony:None e. Staff presenting-application: Linda Ritter f. Other Staff commenting on application:None 2. Key issue(s)of public testimony_ . a. None 3. Key issue(s)of discussion by City Council: a. None 4. City Council change(s)to Commission recommendation: a. None City of Meridian I Department Report IV. City/Agency Comments &Conditions • 1 AMITY •-` —� �— - - • ct Location . of Impacti IY 0 Analysis \ _ EIIIIIIIIIIE yell !uu - r YY,lulrrlllr�''• - ` `b. -. ou,� -r�nnnnn i � LAKE HAZEL - t LocationLegend Project AMITY �!- -a o f its illll jlll!�-�111■RRrr' r 1fgA W ♦�+r= - 1111�' r+.rpq - ►j�j �////I� 1Y1�1 Illrt ��y� •y••�r,� I��� •' + Iliii i^yi my�r of w'.;:::�.■ ■ :Jt�.�ri•�� �1 •♦ ry Llnnn= nq �n cool::���:■wrs irr�2�'.� • I r 111111■O Illll� rr ■■■,++rr • p�1 t1r � uul '71 1111111�� ,� .nn+r►� yV - � ��� •�::i:n1i,llr■ unn- C• unlu=:����+u,,,rr � rrr rri tlPl B!l! � ■ ��iRidu n� E rm��.J,l a:. • • r q - _ - --.,� �111 1 ■ ■_� ��rR =nEi uu hj rir R •- uwulllll=-, �:: III�llll 1]=�f11 11^II 1�1-+-�Ir �■■ i ri��y�rrrrpi- nmuum-_ : i�11OH1 1' n =pll y ■�rrrr ' 'r �� N-�i�Iri 11�Il ♦ � Oyrir���� � ■ � 1 -�I�,' m�ii,iniwa3� - L-AKE HAZEL �...�v1 ■ I I 11111 �u�� I l "'Alll 1■Ilr _ �� yfM� l Im mm C G ..il o Illll 11-- EE=11i1 iIilpa::` �Ar 1 AMITY -� ,. Legend Project Location 111■ 111111E Area of Impact • C Analysis =�=�niii ilililiilil ll J•'-!!!!!_ weec _ il�ll r-xu11i1ia►r u! ■r■■■�Ilq� � -�xll 111 au►_�- uiun,pn- �l■.� _— ■11l r1111 1 Ira.. J1111 111111 NN■ ■ r flf/� W Ilillr=IIIx111 ♦�•1� _��p��' � ran nll■-- � - 11�+M►f � 9i � 5's-_ p nlr►► pair_ ■n unn-= � �. IIIIIIf<f "ti :: �= i A/i ♦ pr C�ull 'lrrl► �:: �jj �llnlr� a+* t17 p -�psli__ - -=nn1 ► q.►!���:: ���y 1� Irlll��tpl►\` �rlll I x 111„p�17 n r ay'►il�►ir} � �� IIIR■ ull i�11 111:��- as i aA► � � Silxxll= L lllllll� �1■ Illlll:-- rR p}.}1♦ t� _• � ■ Illlllll� -11111 Il� Illlrll�-� ■�i�• ►•ij• r� fi��Olul■■ 1111l11 11 fj• •f 1'i wAff.�- '' •Irr ►• nluw ■ >•Ii■rl►�:�n mxu ►uu ., ., q•h1 1 ��r mrr ��11111111�-'Inw uw ■■ • •. r ulw-==_=- - e - . "'�1�1141I111111���=.Illlr� =__-_� y ■r.r►�.0 i•Nr�l I III = Ilp nwll r 111FA M 111rift�a■- I� nil llt — 'I ■fir••11'• I -110■I..F, " !! 9NAla11luu� I!r _f IIFIIIIII q r•9 :� f k.ry[I IIIII,�N f ryilplr, IIIIIIIIIEI'k11ia I/ =mnmm� *` n■ r_ T = —11i■11 \■■ IFII I_. rw�' �. •YI�.Inrmu�Ll au�G,Inuaa� CAKE HAZEL f , ��s t.fllill � - . Iliiiri��►►_ �■ w• III r - � I 11111'� -�111i _ 1 • - • _ 111 I� I ��1 � ■■■■ 1 11r- Ol`� pC_ ►'}Ili�� Y f Legend ppikocc �G3III ��A•�i' kiA AMITY •_- {' Project Locationul�l It111 h,m�lip�\ �-■■■ _al I lllgllll II—R'�11 Area of Impact _ 52 -=_==11111111U• frll,rllllil1111111�, -V� i,_ 1 �i _ I Ill►f'-�Illlul nnllllllil l• _ �.uula �/1•_ --le 1111111111111►� W:_:=nnmmm liimliinl nmTmiii���"Inu___. ■ -��r,_::,IIIIIIII/i\ �:_'_ nn!= ■_ _-�-■■■■ Ixrn�■ la>•'r----11111111r {�;' !um- = 11 -�'-"����IIIl11111 � �uruulx=�!.H■rlll�I ■ City Limits Planned Parcels .- a,nl►' nn,ulun� =uuuir r r rrr� 11011111111111v'' - 1111 Ilx1 ! ,Iruu°Illlll w:■ -■rnllr111ow- ffrr� IY "'11m011111111 �lrr 0 AnalysisTA �\IIU1 I r�llllr' • pr!4 e - +�: ralfi_ ♦ ■` ■ IIIF R-00 ♦♦�i _- �l_--_♦ ■n.1 � R 111111�`fr �♦ r -r�=x 7� ♦♦+�� im ■■f► r:=e ♦ ,� 'Ik r r r f f fI Ili 111l;�• �/ �R`- -. - r•j Ij•�r rl ►a'!c�!:!Ii.`,, ��j I �jsti�ti�J Hill -- fit ittu►r - = •.;•�w- ��. I�11111�• � �IIj� tliry 111 r s., r fq��� a 1r� •y•iyf� al F ♦� ■n s I a-. � ux1.�*."r a .+• .,, / +11 _ ■■ . '•q''9 � r♦ ♦ I I� IIIR�Illtlltl In1 :�11 111: ■■- a,,► ♦ ♦ � �♦ flllull�"" L Illlll)� r1 1x111: }►}►�1 1 _uwul n unm nr} �• i •ii nrr •i Mat.■ =Ilunu' um ,� ► • •+r . " IIII'_II ��I/ ,�= •�■ww 7 r1u11a.r71ili�� �ul■In C+ lul • •►i.i1j•�►�q Illlilll �/111►-i - 1 ■ 1l�rr G 1uu■-u■■■1 Iamun� m ■►r''•Ar+i�hr = �e - G1BGi I■■■r ■■■■■ 'i111I1 Illlll_ II nn ■■ •. ••►•11-� n'nllg - rn r wuuullE:-; T � �II11111111�- � 111a ■r••iy . •ri r' II Mlle�_ r� �� C� _„r_ ■r,1► r qr+ w�� r 111111111111��; =--1i�1 1 4111 1 1 11 1��`- �IIII- r •.�, �• �� I m=_--_ '1=Fna y EIElEI _ �_n,r umnul�p�p � nil ni y•r .- 11 uuari GG ui, -� Iw=111■Itllrll_r��11! •• � f 1 IIIIIIIFIP III[I9111�_I �■ -.-•a - ��tllf IIIIIIIIIIIII� ��_ // � �=IIIIIIIIIr1� a■, 9��- f mnw •nn-- -r�l 1111 (r. ikr,-e_�_ r� , I��� ■nuuu� ■r■ ■■�■ f `_u� nnn�`=■ t,,,,,� R'=L=n_1"�r� Il_ i�r-a:ar i� 'iin:C'p� IJ flll3ll Allllll IIIIIM IINII iuuull. �f■� ti l ■■.f�n111F1.5, LAKE-H'AZEL' poll - I ■ 1 �1 III�III= � ninlp I i �fI/I ••rq}f iir;=Illlll c�l�illi`� Mira#fi#� 1 i IIIIIII IIIIIl1- ,�-.����� _ ' �■� I I t1- - �11111==11111� .--.�11 r- _ ►:�' ''i j ; �,IIEI p i- � 1 C , '�[1/1 IIIIIIII I I nell I � *� Imurau�i)p<<nuul� �' ♦liar■ I Nall _=H=1n11.- v Ilr �i r11/rm nm� a .♦ 6.b.If/._.....■I il_f/r,� n.:_. _.F ■■■■ 1 B. Approved Preliminary Plat(date: 4/24/2017) !115 n a it ��� ,• it U sdeolxscx vnasxs PR� .. , .� �` _ `- Ley-. •���� 1� ��f " e 1 eo'IN�� e x� vEFT]oF a� me.im P:CENP k mcimn uw xorx5 k A,E P•r• 99GIn9M Pxa9nG � � P^£ City of Meridian I Department Report VI. Exhibits C. Approved Final Plat(date: 12/21/2020) PLAT SHOWING PEAr 6aa,1 PA Sky Mesa Commons Subdivision No. 5 1 56Y16'xe2 1u5.xe' +6ffit wav ,aor q I I tl�-I F^v H rIP S II I _41 Si al al �R• I �[ I R i �R I � I e—I I I I I ti Fw a I JRUY__ ___aeJe___ ___y°°•_.. __sm.__ ___eAm __ __ NEP16ww JlPM'°E4 ° — w x ,wwvc J ---x,ar---- ---iAm•---- ---+e.,c--- ---yam-- - --- - --T---------1 i i----- i Ti rT-- �° rw I i —e w• I r , I I P I l I I � li 11 � --------� `---'----- LL----- I: -- N0740'4pYl 5Lu.4e' HOi ROR"'RECOROA,ION J•EFB ENGINEERS,INC. SHEET 2 OF° PLAT SHOWING PI,A.r 900N PAGE Sky Mesa Commons Subdivision No. 5 I S...V "t 1A W MVI3'35'E mm' aax• �,O.OU' rti T I f_-------- L G ____________L_ aS iY 5N JECb'- seza .e•m-. , -------------- --------r _, --T7 rT --- a, � II ig AID �� i 'R a I ig yi f_______________e 'ly rw V I .� I _j L mm' Jnw• �-L--v�.errzv e x i Rlv46Y2Y° 5AN26' !!9'1+'lyR 'A076' __ NOT FOR 0.ECOROITION J-IYB ENGIREER5,INC. s°swm P�3..mcim s.noe lm m. 9HfLf 3 0, City of Meridian Department Report VI. Exhibits D. Approved Landscape Plan (date: 2/12/2021) ------------------------------------------------------ ` 0 0 0 0 0 CO i - .. 00 9. r — Al ILA,�. ..�......,q........a� w.�.e L101 !-U City of Meridian Department Report VI. Exhibits E. Qualified Open Space Exhibit(date: Click here to enter a date.) i OPEN SPACE s t -COMMON LOT QPDJ SPACE CAJ2KMVI PUFFER QR9J 5MCF f yl�r �r J 1 5 p a I _ L l� snecr*sa s x 1 0 A 57. MA AA. . . . ... .s City of Meridian Department Report VI. Exhibits � 1 1 a......... OWN • / _ -_.may.: -++ � '�� � �. G. Service Accessibility Report PARCEL R0988260484 SERVICE ACCESSIBILITY Overall Scare: 23 12nd Percentile Description Location In City Limits FREEN or Extension Sewer Trunkshed mains < 500 ft.from parcel GREEN Floodplain Either not within the 100 yr floodplain or > 2 acres GREEN Emergency Services Fire Response time 5-9 min. YELLOW Emergency Services Police Meets response time goals some of the time YELLOW Pathways Within 1/4 mile of current pathways GREEN Transit Not within 1/4 of current or future transit route RED Arterial Road Buildout Status Ultimate configuration (#of lanes in master streets YELLOW plan) > existing (# of lanes) & road IS in 5 yr work plan School Walking Proximity From 1/2 to 1 mile walking YELLOW Either a High School or College within 2 miles OR a School Drivability Middle or Elementary School within 1 mile driving GREEN (existing or future) Either a Regional Park within 1 mile OR a Community IP Park Walkability Park within 1/2 mile OR a Neighborhood Park within GREEN 1/4 mile walking City of Meridian I Department Report VI. Exhibits