Loading...
HomeMy WebLinkAbout2025-03-28 COMPASS Communities in Motion (CIM) Development Review Checklist Development Name: Rockwell Greens I CIM Vision Category: Future Neighborhood Consistent with YES Vision? M= cMillan td New Households: 412 New Jobs: 0 �. • Safety Economic Vitality 0 0 How safe and comfortable is the nearest To what extent does the project major road (minor arterial or above) for enable people, government, and bicyclists and pedestrians? Analysis is businesses to prosper? limited to existing roadway conditions. McDermott Road Economic Activity Center 0 Access Pedestrian level of stress Impact on Existing 0 Surrounding Farmland Bicycle level of stress Net Fiscal Impact it o Convenience Quality of Life What services are available within 0.5 Checked boxes indicate that miles (green) or 1 mile (yellow) of the additional information is attached. project? Active Transportation Nearest bus stop Automobile Transportation Nearest public school Public Transportation Nearest public park � Roadway Projects t1/ } Improves performance Does not improve or Reduces performance �1 reduce performance Comments: Based on the site plan provided, COMPASS has no additional comments. Who we are; The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization for Ada and Canyon Counties. This review evaluates whether land developments are consistent with Communities in Motion the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document. Past checklists are available online. See the Development Review User Guide for more information on the red, yellow, and green checklist thresholds. ® https://compassidaho.org/ COMPASS ® info@compassidahoorg °°' `°"'"°"'T""`"""'"pass°"I Sent: 3/27/2 5 . °`s "WBe"d— de"° Complete Network Appendix Checkmarks (J) below indicate suggested changes to a site plan, based on the COMPASS Complete Network Policy (No. 2022-01). Both the Complete Network Policy and site-specific suggestions are intended to better align land use with identified transportation uses in the corridor. Please see the Complete Network for primary and secondary uses for roadways (minor arterial and above) in Ada and Canyon Counties. Corridor Name: McDermott Road Primary Use: N/A Secondary Use: N/A Fiscal Impact Analysis Below are the expected revenues and costs to local governments from this project. The purpose of this analysis is to help the public, stakeholders, and the decision-makers better manage growth. Capital and operating expenditures are determined based on service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. Net Fiscal Impact by Agency City County Highway District School District Breakeven point across all agencies: 1 Year Disclaimer: This tool only looks out 20 years and does not include replacement costs for infrastructure, public utilities, or unfunded transportation needs in the project area. More information about the COMPASS Fiscal Impact Tool is available at: https://compassidaho.orglfiscal-impact-tool/ Short-Term Funded Capita/ Projects SH-16,Ustick Road to US lw ,ft �n-u(a mr..tl Regionally Significant: Inflated TIP Achievement: Key#: 23400 System Performance s Requesting Agency.ITD NH;-LOTTR - Project Year: 2025.2026 Total Previous Allocations: $92,921 Safety Total Programmed Budget: $31,400 Total Cost(Prev.+Prog.):$124,321 URWA*Md Project Description Construct new segment of State Highway 16 from Ustick Road to US 20126 in the City of Meridian and Ada County.The roadway will include two lanes in each direction with at-grade intersections at Ustick Road a nd US 20126,utilizing the on and off ramps for the future interchanges.Work also includes an overpass at McMillan Road and Five Mile Creek,several local frontage roads to connect to the roadway system,and irrigation structures.Design and right-of-way budgeted in separate,previous project(KN 20788)- Funding Source State Program Leading Idaho Local Match 100-00% Goat Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year' Engineering Engineering Engineering Consulting I I 2025 0 C 0 C 1200 20,000 21.200 I Cl 21200 2025 0 C 0 0 0 10,200 10.200 0 10 200 Fund 0 0 0 0 1.200 30,200 31,400 0 31.400 Totals: Source: The COMPASS Transportation Improvement Program (TIP). The TIP is a short-range (seven-year) budget of transportation projects for which federal funds are anticipated, along with non-federally funded projects that are regionally significant and is available at: https://compassidaho.org/transportation-improvement-program/