Loading...
HomeMy WebLinkAbout2025-03-26 ITD 1DAH0 * * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT Ma : P.O. Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity (208)334-8300 • itd.idaho.gov August 15, 2024 Linda Ritter Planner 33 E Broadway Ave Meridian, ID 83642 VIA EMAIL—Revised Comments Development Application H-2024-0019 CUP, MDA,ALT Project Name Centrepoint Apartments Project Location SW Corner of N. Eagle Rd. & E. U-Stick Rd. Project Description 295-unit Multifamily Apartments Applicant Kimley-Horn The Idaho Transportation Department (ITD) reviewed the referenced application(s) and has the following comments: 1. This project abuts the State Highway System. 2. As mentioned in the applicant's narrative, an application was completed for the original Villasport project in 2018. ITD submitted a response to this development in December 2018 with the following comment: "The southbound right turn lane on SH-55 (Eagle Rd) onto East Seville Lane does not meet current ITD standards. The applicant will be required to reconstruct the right turn lane to current ITD standards. To accommodate the lane reconstruction, ITD requests a 12-foot Right-of-Way dedication along the applicant's parcel." 3. Although the applicant is making changes to the original site plan, our comments and concerns remain. Through common ownership of the adjacent parcel,the applicant will still be required to complete this mitigation. 4. If the owner intends to sell the adjacent parcel, a cross-access agreement will need to exist between Parcel S1105110120 and S1105110111. ITD will not grant access onto SH-55 for Parcel S1105110120 due to the mitigation listed above. 5. ITD reserves the right to make further comments upon review of the submitted documents. If you have any questions,you may contact me at 208-334-8377. Sincerely, Kendra Conder/Development Services Coordinator Kendra.conder@itd.idaho.gov 1DAH0 * * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT Ma : P.O. Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity (208)334-8300 • itd.idaho.gov September 17, 2024 Brandon McDougald Kimley-Horn 1100 W Idaho St Suite 210 Boise, ID 83702 RE:Centrepoint Apartments-ITD Development Staff Report Dear Brandon, The Idaho Transportation Department(ITD) has completed our review of the Centrepoint Apartments Traffic Impact Study (TIS) & Updated Transportation Memorandum.The proposed development will be located at 3100 N.Centrepoint Way in Meridian, Idaho. Development Summary • The proposed development will consist of 295 multi-family apartments. ITD Staff Requirements • Centrepoint Apartments is conditioned for the following: o Reconstruct the southbound right-turn lane on SH-55 providing direct access to E.Seville Lane to match the specifications listed below. ■ 340'storage length ■ 180'taper o Additionally,the developer will need to demonstrate joint use of the E Seville Lane/SH-55 approach for Parcel S1105110120 and S1105110111. ITD will not grant access onto SH-55 for Parcel S1105110120. Right-of-Way Dedications • ITD will require 12 feet Right-of-Way dedication on SH-55 along the adjacent parcel (S1105110120). Mitigation Funding • All mitigations will be the responsibility of the applicant. Permit Requirements • Once Civil Plans have been drafted for any work occurring in ITD's Right-of-Way,submit an access permit application via our online permitting tool here. o ITD staff will receive the application and all submitted supportive documents,which should include: ■ Civil Plans ■ Parcel Deed ■ Cross-Access or Access Easement, if applicable ■ Traffic Control Plan designed by a certified Traffic Control Supervisor o Access and Utility Permits ■ Both Access and Utility Permits, if required,for work being done in ITD ROW will need to be submitted for reviewed and approved by ITD staff prior to work beginning. 1 1DAH0 * * Your Safety • Your Mobility IDAHO TRANSPORTATION DEPARTMENT Ma : P.O. Box 8028 • Boise, ID 83707-2028 Your Economic Opportunity (208)334-8300 • itd.idaho.gov Expiration of Staff Report • In the event an approved encroachment permit is not obtained within one year,this staff report will no longer be valid and ITD may request an updated TIS to reflect current traffic conditions. Notices • This report does not supersede or nullify any local land use requirements or legal property restrictions. Legal property restrictions include but are not limited to easements,access agreements,deed restrictions, plat restrictions, liens or other encumbrances. Removing, modifying,or establishing legal property restrictions is the responsibility of the developer. • This report does not constitute a permit approval, or denial issued pursuant to IDAPA 29.03.42. ITD Staff Recommendations are intended to assure that the proposed development will not place an undue burden on the existing State Highway system within the vicinity impacted by the proposed development. Maintaining safety and mobility for Idaho's motorists is of utmost importance to ITD.We appreciate your improvements to livability in Eagle, Idaho as we want all residents to travel safely and efficiently on the highway system. If you have any questions,feel free to contact me at Brian.Duran@itd.idaho.gov or Kendra Conder, Development Services Coordinator at(208)334-8377 or email Kendra.conder@itd.idaho.gov Sincerely, Brian Duran Development Services Manager Idaho Transportation Department I District 3 Cc: Linda Ritter, Planner, City of Meridian 2