Outstanding Issue(s) for City Council: At the last public hearing you asked us to come back with
more information and revised DA provisions, on the realignment of Overland Road, and on what
occurred and/or will occur with regard to ACHD approval. Finally, President Borton requested
follow-up information from the Planning Department with regard to a few ofthe DA provisions.
Location: south side of Overland between Linder and Ten Mile
DA Provisions as Proposed in Memo from Caleb Hood (I've included only the modified
ones)
3. That all TN-R zoned lots and uses will comply with the recently adopted TN-R
standards adopted in the UDC (see Ordinance# 06-1241); that the TN-C zoned area
along Overland Road will include: at least 20 multi-family dwelling units with the
dwelling units being located primarily between Overland Road and any surface parking
area for the units; at least 20 attached single-family dwellings and/or townhouse lmits;
that a useable common open space area (park) of at least 10.000 square feet.
excludine parkine areas and/or drainaee areas. and includine some recreational
equipment (e.e. - eazebo with benches. BBO area. tot-lot. swimmine pool.
clubhouse. etc.) within the open space area be provided on site; and an internal
pedestrian connection to the TN-C zoned property to the west shall be provided.
(NOTE: this provision was modified subsequent to original memo to clarifY question
from President Borton.)
12. The eity private park lot shall be included within the first final plat phase of this
development as shown on the revised master site plan; all "mega" lots shown on the
master concept plan, west ofthe first phase, shall be annexed and recorded as mega lots
with the first final plat, but no home or road construction shall occur in this area until
such time as the Ten,.Mile Area Specific Plan is adopted by the City. After such time,
the mega lots may be developed if new (detailed) preliminary and then final plats of the
mega lots, that are consistent with the adopted Ten Mile Area Specific Plan, are
submitted and approved by the City. No variances to lot dimensions, setbacks or
block lengths shall be requested by the applicant as part of the re-development of
the mega lots. .
16. That the applicant agrees to plat a public library lot and an elementary school lot with
the first phase of development. (NOTE: President Borton asked us to check with the
School District if they would like the irrigation ditch tiled adjacent to the elementary
school. We just heard back from Wendell Bigham and he would prefer that it be
covvered.)
17. That with the construction of the first phase (prior to any occupancy being granted), a
lO-foot wide multi-use pathway shall be constructed on this site generally on the south
side of the Ridenbaugh Canal, from Linder Road to the eity private park (temporarily
terminating at the eity private park) with the remainder out to Ten Mile Road to be
constructed with future phases as they are brought in for replatting. The city will
require additional multi-use pathways along the Ridenbaugh Canal and/or within the
northwest pipeline easement, as the mega lots develop. (NOTE: The Parks Director
would like to speak to this issue once] have finished my review.)
21. That the applicant agrees to construct a development and public street system on this
site that is in general compliance with the submitted Master Concept Plan, prepared by
The Land Group, Inc., labeled sheet M1.0, dated 4-15-06, with the provisions
mentioned above ( detailed approval of the internal street systems will be reviewed and
approved with the re-subdivision of each mega lot). Provide a stub street to at least one
of the 5-acre lots in Val Vista Subdivision when mega lot 2 develops. Said stub street
shall be located near the west property line. Also, provide a public stub street to
either, Parcel #S1223233905 or S1223234100 to the west, when mega lot 2
develops. (NOTE: The above sentence is a new provision that staff has included based
on the Council's discussion about specifically providing stub streets from mega lot 2,
and limitingfuture access to Ten Mile Road)
22. The applicant has agreed to limit the height of homes on the southern border shared
with Val Vista Subdivision and Aspen Cove Subdivision to a single story, with a
maximum height of 22 feet (measured between average finished ground level of
the lot to the average height of the highest roof surface). The applicant has also
agreed to provide a greater than B-30 foot rear setback for the lots along the southern
boundary. The applicant has also agreed, and shall be required, to construct a solid
6-foot tall vinyl fence adjacent to the lots in Val Vista Subdivision and Aspen Cove
Subdivision, prior to issuance of building permits within the first phase of the
development.
23. The applicant shall be required to construct a minimum of 1,000 residential
dwelling units on the property and a maximum of 1,252 residential dwelling units
on the property, unless otherwise specifically approved by the City Council
through subsequent applications.
24. The applicant shall comply with all adopted state and federal air and dust
particulate emission standards. The applicant shall make all reasonable attempts
to abate (mitigate) dust settling on adjacent properties generated by the
development of the property. The applicant shall keep a water truck on site at all
times, unless otherwise allowed by authorized city staff, and use said truck to
abate the emission of dust.
25. With the development of the village center at Overland Road and Linder Road,
the applicant shall incorporate and build at least one transit stop, including
benches and covers. The applicant shall incorporate and construct a park and ride
area near the proposed fire station and Ten Mile Road. (NOTE: President Borton
asked for clarification on whether transit now exists in the area. Overland is also not
currently in VRT's regional operations or capital improvements plan for bus service.
However, once we g~t densities along Overland that can support the bus system, there
will eventually be service in this area. We see a lot of potential for Overland serving
both bus and park and ride users in the future.)
26. Prior to the signature of the first final plat, the applicant shall submit and obtain
City Council approval for, a development agreement modification that proposes
architectural guidelines for this development.
Mr. Hood also provided information regarding Duane Drive in the Redfeather development.
Council required a gate on Duane Drive that could be removed and Duane Drive opened for all
vehicular traffic between Redfeather and Perkins-Brown at the discretion of the ACHD
Commission, after a public request and subsequent public hearing on the matter. If one of the
five-acre lots to the south of this property were to develop, Council could use a similar
mechanism to restrict traffic from Val Vista Drive.
Information on Overland Road Realignment as detailed in Pete Friedman's Memo
The rationale for realigning Overland Rd. was based on: 1) the proximity of the eXIstmg
Overland/Ten Mile Rd. intersection with the future interchange and a desire to direct traffic
those movements to the south; 2) grade issues that would necessitate significant fill and right-of
way acquisition to bring Overland Rd. up to the future grade of the interchange; and 3)
recognition that an extension of Overland to the west would be impractical and expensive due to
the presence ofthe Tasa subdivision and other residential development
Initially, the planning team had the relocated Overland Rd, aligned with Lamont Rd. As the plan
evolved Jim Jewett indicated that there were topographic issues on his property affecting that
alignment. The consultant and other members of the planning team met on site with the Mr.
Jewett's engineer and after viewing the topography and proposed engineering plans determined
that a shift to the north was appropriate. In fact, the proposed location cannot be shifted much
farther north again due to topography.
Another factor was the current parcel configuration on the east side ofTen Mile Road at Lamont.
Based on a review of the parcel information for this area, the potential re-alignment would bisect
two, possibly three properties. This leaves the future development of the road dependent on the
future plans (if any) of those individuals. By shifting the road to the north, the proposed
alignment crosses land involving a single owner (Mr. Jewett) who, through a pending
development has offered to dedicate a portion of the right of way, thus precluding the necessity
for the expenditure of public funds for property acquisition. (NOTE: President Borton asked us
to clarify what was meant be dedicating a portion of the RO W. Mr Jewett has proposed to build
all of the Overland Road realignment. He would be solely responsible for the dedication and
construction of the first two lanes of Overland Road, including sidewalk. The construction costs
and ROW for these two lanes would not be eligible for reimbursement. However the ROWand
travel lanes after the first two are eligible for reimbursement through impactfees, as Overland is
an arterial roadway that is currently in ACHD 's CIP.)
Our draft plan also shows a western extension of Overland Rd. which is really conceptual at this
point. Given the multiple ownerships and absence of development pressures on the west side of
Ten Mile Rd. I would expect that the road alignment will most likely be determined through one
of two actions: 1) in response to a specific development proposal; or 2) the preparation of a
specific area plan based on future development pressures once the interchange is constructed.
Finally, ACHD is in the process of completing the South Meridian Transportation Study that
includes this area. The current draft identifies a western extension of Overland Rd. from the
proposed intersection at Ten Mile Road to the existing intersection with Black Cat Rd. The study
indicates that this extension would serve local traffic since discussions with the City of Nampa
and the Nampa Highway District indicate that neither entity has plans to extend either Airport
Rd.or Orchard Rd. to connect to Overland Rd.
Information on ACHD Approval. Lori Den Hartog clarified her original memo regarding
ACHD approval and transmitted that information to the City. Mr. Inselman sent a copy of the
minutes to the Clerk as well. I asked Mr. Insleman to clarify some of the information in Ms .
Hartog's letter. All of that information is presented below (by topic).
Summary of December 6, 2006 ACHD Commission Meeting
The revised plan proposed a re-alignment of Overland Road through the site, south of the
. existing roadway. After hearing testimony, the- Commission determined that there were
several critical components needed prior to making a final decision on the revised
development application. The items included the following:
· A different public involvement process would be necessary for a major re-
alignment of a principal arterial roadway (not just the development application public
hearing process)
o Due to the nature of the proposal (i.e. re-routing a critical east-west principal
arterial roadway), the Commissioners indicated that a broader public process would be
more appropriate because more people, other than just those impacted by the
development, would be affected by the proposal. ACHD staff notified all property
owners within 300-feet of the development of the date and time of the Commission
Meeting. However, the realignment of Overland was viewed as having more of a
regional impact thus requiring a broader public process.
o Additional 1nformationfrom Mr. 1nselman: If the City approves Southridge with
the realignment of Overland and the City and applicant request ACHD to take an
action, then ACHD will be compelled to initiate a public process for the Realignment of
Overland prior to rescheduling Southridge jor a Commission action. At a minimum
that public process will most likely need to include a Public Information Meeting or
Open House with the appropriate level of advertising and public notice prior to
scheduling the item for a Commission action. The most time effective process would be
to allow the South Meridian Transportation Plan to be completed. There is a P1M
scheduled for next week. If we try to schedule a P 1M for the realignment of Overland
Road alone we are a minimum of 2 months out, possibly 3 months and then would have
to schedule the item for a Commission agenda after that. The timing would put any
action by the Commission occurring at about the same time as their consideration of
the South Meridian Transportation Plan.
· Formal adoption of the Ten Mile Area Plan by the City of Meridian, because the
proposed Ten Mile Area plan prompted the re-design of the revised application.
o It was the draft transportation map produced as a result of the Ten Mile Area
Plan Charette meetings that spurred the re-design of this particular development
application. That document is still in draft form and subject to change as it continues
through the public hearing process. There were concerns raised about the desirability
of making a final decision on the realignment of Overland Road before the Ten Mile
Area plan has been formally adopted.
d Additional Information from Mr. 1nselman: The South Meridian Transportation
Plan could satisfY this requirement. The South Meridian Transportation Plan is
scheduled to be complete in April with possibly a Commission action in May. This
planning effort could and probably should be the ACHD public process for considering
the realignment of Overland as it encompasses the transportation needs of the whole
area.
· Which design alternative (SPUr, Diamond, etc.) is selected by rTD for the Ten
Mile Interchange.
d The Commissioners stated that knowing the design selection would be helpful ili
understanding the full impacts to both Ten Mile Road and Overland Road, and any
future .intersections along either of those roadways relative to proposed Interstate
ramps, etc.
o Additional Information from Mr. 1nselman: 1 don't believe anyone is saying we
need to wait for full design of the interchange by 1TD. The Commission simply
expressed a view that it would be desirable and helpfUl to know what type . of
interchange design would he chosen.
o Additional Information from Ms Sue Sullivan with 1TD: The Ten Mile
Interchange project termini (southerly) ends on Ten Mile Road just north of the
Ridenbaugh Canal. We do not intend to replace or widen the canal. To do so would
likely delay our project. If Ten Mile Road needs to be widened south of our current
project termini to the "new" intersection ofTen Mile & Overland, someone else should
he responsible for that improvement.
The ACHD Commission indicated that there was not sufficient information available to
make a final decision on the development application. The Commission remanded the
application back to District staff to await answers on some of the aforementioned issues.
The Commission did not identify a time frame to re-schedule the revised preliminary plat
application for a final decision.
Questions Raised by Meridian City Council
In reviewing the revised application which included the re-alignment of Overland Road
through the site, District staff analyzed the proximity .of other nearby roadways intersecting
with Ten Mile Road. The proposed new intersection of the re-aligned Overland Road with
Ten Mile Road, is approximately 700-feet north of the existing Lamont Road intersection
with Ten Mile Road, and approximately 1,000-feet north of the existing Val Vista Road
intersection with Ten Mile Road. Both of these offset distances meet District policy. In
addition, the offset of the re-aligned Overland Road from a proposed new private road
intersection on the west side ofTen Mile (within the proposed Shadow Leaf Subdivision) is
.approximately 400-feet, which also meets District offset policy.
In evaluating the area, District staff deterinined that aligning the proposed new Overland
Road with Lamont Road was not a desirable option. While Lamont Road is currently
classified as a collector roadway, there are a number of existing residences that front-on the
roadway. If the re-aligned Overland Road were to align with Lamont at Ten Mile Road, it
would effectively make Lamont Road a de-facto principal arterial roadway without going
through the normal roadway classification process through COMPASS. However, by
offsetting Lamont Road, it opens of the opportunity to possibly extend Overland Road,
west of Ten Mile Road, parallel to Lamont Road through largely un-developed acreages.
(NOTE: This is consistent with the memo Mr. Friedman prepared for Council.)
In summary, the Ada County Highway District Commission understood the need to address
the concerns regarding the existing intersection of Ten Mile Road and Overland Road, and
that one approach to doing that may be to re-align Overland Road to the south. However,
the Commission did not take a final action on the development application because they