HomeMy WebLinkAboutCC - ACHD conditions for area roadway and bridge improvements From: Dawn Battles
To: Sonya Allen
Subject: RE:Tanner Creek Sub. 1
Date: Thursday,January 30,2025 3:37:08 PM
Attachments: imaae002.g_na
image004.g_na
imaae001.ma
External Sender-Please use caution with links or attachments.
Sonya,
Here are the site specific conditions of approval regarding Corporate Extension,Waltman lane and
the bride across Ten Mile Creek. Please let me know if you have any questions.
1. Prior to plan approval and ACHD signature on the first final plat, enter into a Cooperate
Development Agreement with ACHD for the construction of the Corporate Drive extension,
which will also include the construction of a new bridge over the Ten Mile Creek. Construct
Corporate Drive north of the bridge as a 40-foot wide commercial street section with vertical
curb,gutter, and 5-foot wide attached concrete sidewalks. The crossing of Ten Mile Creek
will require a 58-foot wide bridge with 2-foot parapets. South of the bridge construct
Corporate Drive with a minimum of 30-feet of pavement and 3-foot wide gravel shoulders on
one side of the roadway. ACHD will pay for the construction of curb,gutter, and a 5-foot wide
attached concrete sidewalk on one side of the roadway.
The Cooperative Development Agreement shall include the roadway and bridge design and
construction,as well as allocation of costs(70%ACHD and 30%the applicant).
2. In order to ensure that Corporate Drive will be extended,the following items must be in place
prior plans acceptance for the first final plat.
• Cooperative Development Agreement;
• Financial surety provided by the applicant meeting the terms of the Cooperative
Development Agreement;
• Full design and approved plans for the roadway and bridge.
3. Construct the south side of Waltman Lane as of a 36-foot wide collector street section,
with vertical curb,gutter an 8-foot wide planter strip and a minimum 5-foot wide detached
concrete sidewalk(or 7-foot wide attached)abutting the site.The applicant should be
required to construct the north side of Waltman Lane with a minimum of 12-feet of pavement
from centerline,a 3-foot wide gravel shoulder and a borrow ditch to accommodate the
roadway storm runoff.
4. Extend the right-of-way a minimum of 2-feet behind the back of curb if detached sidewalks
are constructed. Provide a permanent right-of-way easement to 2-feet behind back of
sidewalk for any sidewalk placed outside of the dedicated right-of-way.
5. Construct center left turn lanes on Waltman Lane at the apartment driveway located
approximately 430-feet east of Corporate Drive and at Kearney Avenue.
6. Reconstruct the existing Ten Mile Creek bridge crossing on Waltman Lane as a full 36-foot
street section with vertical curb and 5-foot wide attached concrete sidewalks. This will
require a 54-foot wide bridge with 2-foot parapets.
To ensure the existing Ten Mile Creek bridge crossing on Waltman Lane is improved when
necessary and to allocate costs,the applicant should be required to enter into a Cooperative
Development Agreement with ACHD.
The Cooperative Development Agreement should include bridge design and construction,as
well as allocation of costs(76%ACHD and 24%the applicant).
7. In order to ensure that Waltman Lane bridge is constructed,the following items must be in
place prior plans acceptance for the final plat necessitating the improvements:
• Cooperative Development Agreement;
• Financial surety provided by the applicant meeting the terms of the Cooperative
Development Agreement;
• Full design and approved plans for the bridge.
Thanks,
Dawn Battles
Senior Planner I Development Services
Ada County Highway District (ACHD)
3775 N. Adams Street, Garden City, ID 83714
Phone: (208)387-6218
www.achdidaho.org
Connect with us on social! @achdidaho
'AX :4
connecting you to more
We're thrilled to share some exciting news with you! Our team is in the midst of a big move to
our new headquarters building on Meeker Avenue in Boise.This relocation is a major milestone
as we work to better serve our wonderful community.
We expect to be fully operational at Meeker by late February. In the meantime,we'll continue
to provide service at our current headquarters just down the hill on Adams Street in Garden
City(3775 N Adams Street).
At the Adams location,you can still pay fees, drop off plans, and reach us with any questions or
concerns.We're always here to help just stop by or give us a call at 208.387.6170
The new headquarters will be more centrally located for the residents we serve, offering
greater convenience and bringing our administrative staff back together under one roof.We
can't wait to welcome you to this space,thoughtfully designed to enhance our operations and
create an even better experience for you.
Thank you for your patience and support during this transition.We'll be sharing more updates
soon, so stay tuned!
From: Sonya Allen <sallen@meridiancity.org>
Sent:Thursday,January 30, 2025 1:25 PM
To: Dawn Battles <Dbattles@achdidaho.org>
Subject:Tanner Creek Sub. 1
Caution:This is an external email and has a suspicious subject or content. Please take
care when clicking links or opening attachments.When in doubt, contact your IT
Department
Hi Dawn,
I'm working on the final plat staff report for this project and need to know if the Cooperative DA with
ACHD requires the developer to widen W.Waltman Ln.and reconstruct and widen the bridge across
the Ten Mile Creek after the Phase 1 improvements have been made,which include the Corporate
Drive extension, is required prior to signature on the plat for phase 1 or phase 2 or if it's tied to
something else.
Thanks,
Sonya Allen I Associate Planner
City of Meridian I Community Development Department I Planning Division
33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642
Phone: 208-884-5533 1 Direct/Fax: 208-489-0578
C4fE II D�
Built for Business, Designed for Living
All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law,
in regards to both release and retention,and may be released upon request, unless exempt from disclosure by law.