Loading...
HomeMy WebLinkAbout2025-01-27 Boise Project Board of ControlRICHARD MURGOITIO CHAIRMAN OF THE BOARD DAN SHEIRBON VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Clerk's Office 33 E Broadway Avenue Meridian ID, 83642 BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-315 E C E �iE TD RE: Apex Cadence Sub 6575 Locust Grove Rd, Meridian Boise-Kuna Irrigation District Rawson Canal 206+50 Sec. 06, T2N, R1E, BM. Sonya Allen, Planner: N 3 U 2025 (CITY OFliiiH IDI =5/ CITY CLERKS OFFICE 27 January 2025 OPERATING AGENCY FOR 16(,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX:(208)344-1437 H-202-1-0061 ALT, MDA, PUD, PP, RZ, PS BK- 145 A, 145 C The United States' Rawson Canal lies within the boundary of the above -mentioned location. The easement for this can and lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) if approved. The Boise Project Board of Control is contracted to operate and maintain this canal. We assert this Federal easement of 40 feet both directions of the Rawson Canal centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve landscaping (gravel only) within its easements, as this will certainly increase the cost of maintenance. The easement must remain a flat drivable surface. All public roadways must be outside of this easement. Easement must remain a flat drivable surface. No variances will be granted. Fencing, gates, pathways and pressurized irrigation lines (as may be required) must be constructed just off the lateral easement, to ensure public safety and prevent encroachments. No variances will be granted. The construction of any roadway crossings must be conducted only during the non -irrigation season when the lateral is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Project facilities and/or easements that parallel and are within and/or intended to be within road right-of-ways due to any development of this property must be relocated outside of road right-of- ways. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Crossing agreements must be secured and signed by all parties prior to March Ist of each year. A time schedule for the construction to be done during the non -irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Board of Control facilities after March lst of each year. However, on a case -by -case basis, overhead utilities and utilities boring underneath a Project facility may be allowed after March lst if reviewed and approved by the Boise Project. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into the live irrigation_ system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. YVhereas this properiy lies within the Boise -Kona Irrigation District it is hi7portant that representatives of this development contact the BKID office as soon cis possible to discuss the pressure system prior to anV. costly design work If applicable the irrigation systein will have to be built to specific specifications as set by the District/Project. YVritten confirmation ft•oin the Boise -Kuria Irrigation District and the City ofAlleridian is required as to who tivill own and operate the irrigation system. If the district is to own and operate this presscn•ized irrigation system, Boise Project Board of _Control will require a set of plans be sent to An Money, Civil Survey Consultants, Inc. at 1400 E. Watertower Street, Meridian, Nalco 83642-3513 for his review, connnents and approval. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a fiill- size hard copy of the irrigation and drainage plans. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statutes, Title 42-1209. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to require changes when our easements and/or facilities are affected by unknown factors even during the approved construction phase. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, homas Rittthaler Assistant Project Manager, BPBC for/tr cc: Kevin Reeves Watermaster, Div. 2 BPBC Alicia Flavel Secretary — Treasurer, BKID File