HomeMy WebLinkAboutPZ - Groundwater Monitoring Results - 6-18-24 up
.791I tea, ! is* fi ,, r L �r,� #.,.
4 ' Magic View .� A
'fc_ 1 I CIr.
� I, '�' J S. Allen
;w a 1
yh( r 1,
�
4J'. i
A 0 SITE
f:
e I ,a.T.�. t.
* } _ !. 'y I.• N
Ir
' 7 • - �1
I
f 4r•L #' • -ter
w N
' rr.
APPROXIMATE TEST PIT LOCATIONS
Source: Google Earth 2024, GeoTek Field Observations, 2024.
Not to Scale
FIGURE 2
SITE EXPLORATION PLAN
Wells St. Subdivision
Southwest Corner of E. Magic View Dr.& S.Wells St.
G E 0 T E K Meridian, Idaho
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS
Prepare for: Prestwick Capital
Project No.: Excavation Date: Drawn By:
320 E. Corporate Dr, Suite 300, Meridian, ID 83642 2728-ID June 2024 TSH
(208)888-7010 (phone)/(208)888-7924 (FAX)
2728-Wells St. Subdivision (Prestwick Capital)
Trip No. Date TP-I TP-2 TP-3 TP-4 TP-5 TP-6 TP-7 Notes KEY
0 s/3/24 10.11+ 8.3'+ 10.5'+ 12.0'+ 11.5'+ 8.1'+ 9.8'+ "+" Indicates dry reading at bottom of
piezometer
1 5/17/24 10.11+ 8.3'+ 10.5'+ 12.0'+ 11.5'+ 8.1'+ 9.8'+
"N/A" Indicates that piezometer is
2 6/3/24 10.11+ 8.3'+ 10.5'+ 12.0'+ 11.5'+ 8.1'+ 9.8'+ damaged or missing-therefore no data was
obtained
3 6118/24 10.11+ 8.3'+ 10.5'+ 12.0'+ 11.5'+ 8.1'+ 9.8'+
4 Note: Groundwater elevation results are
recorded in feet below approximate existing
s grade.
6 Generally,irrigation ditches and canals will
7 locally influence ground water during the
irrigation season.
8
9
10
II
12
13
14
15
16
17
18
Distribution:
Maggie Colwell<maggie@prestwick-capital.com>