Loading...
ACHD Comments .. .,#f;i~it,,- A~ &'~ut1;, ~ John S. Franden, President Sherry R. Huber, 1st Vice President David Bivens, 2nd Vice President Carol A. McKee, Commissioner Rebecca W. Arnold, Commissioner January 10, 2007 TO: Ada County Development Services 200 W. Front St. Boise, ID 83702 ,. '\ f"l~ '9i ",,,L! City oj Meridi~n r:::ity Clerk Office SUBJECT: MCUP-06-040 Ada County EMS Dispatch Bldg 963 E. Pine St. On 9-27-2005, the Ada County Highway District Commissioners acted on MPP05-042 tor Weed & Pest Control Campus. The conditions and requirements also apply to MCUP-06-040. · Prior to final approval you will need to submit plans to the ACHD Development Review Department. · A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. It you have any questions or concerns please teel tree to contact this office at (208) 387-6177. Sincerely, theltJo~ Chelsee Kucera Planning Intern Right-ot-Way and Development Services CC: Project File Lead Agency: City ot Meridian LCA Architects Ada County Highway District. 3775 Adams Street. Garden City, ID · 83714. PH 208-387-6100 . FX 345-7650. www.achd.ada.id.us _ '7. l .....;,....i.)"" . ~ Ada County Highway District Right-aI-Way & Development Department Planning Review Division This application does not require Commission action and is approved at the staff level on September 27, 2005. Tech Review for this item was held with the applicant on September 23, 2005. Please refer to the attachment for request for appeal guidelines. Staff contact: Lisa Bachman, 208-387-6174-phone, 208-387- 6393-fax, IbachmanCWachd. ada.id. us File Numbers: Weed & Pest Control Campus/MPP05-042 Site address: 1127 East Pine Street Owner: Ada County 200 West Front Street Boise, Idaho 83702 (208) 287-7100 ~.,~ t~~7 City oi Meridian City Clerk Office Representative: JUB Engineers, Inc. 250 South Beechwood Avenue Suite #201 Boise, Idaho 83709 (208) 376-7330 Application Information: The applicant has submitted an application to the City of Meridian requesting preliminary plat approval to construct a 3-lot industrial subdivision on 12-acres. Lot 1, Block 1 is intended to accommodate the Ada County Weed and Pest control facility. The remaining 2-lots are proposed for unknown future light-industrial facilities. The site is located on the south side of Pine Avenue approximately % of a mile west of Locust Grove Road. Acreage: Current Zoning: Proposed Zoning: Buildable Lots: Common Lots: Vicinity Map 12-acres I-L I-L 3-lots 1-lot 1 A. Findings of Fact 1. Trip Generation: When the lots develop within the subdivision, the District will be able to determine the estimated additional vehicle trips per day. 2. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building permit. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 3. Traffic Impact Study: A traffic impact study was not required with this application. 4. Site Information: The site is currently vacant. 5. Description of Adjacent Surrounding Area: a. North: Danbury Fair Subdivision and Eastside Addition to Meridian Subdivision (single-family residential subdivisions) b. South: Union Pacific Rail Road c. East: Sante Subdivision (single-family residential) and Railside Park Subdivision (industrial park) d. West: Onwiler Subdivision (single -family parcel with 1.17 -acres and 6A-acres 6. Impacted Roadways Pine Street: Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: 415-feet Minor Arterial East of Main Street was 4,808 on 4-8-03 Better than "C" 25-MPH Commercial Avenue: Frontage: Functional Street Classification: Traffic count: Speed limit: 60-feet Local commercial street Not available 30 MPH 6. Roadway Improvements Adjacent To and Near the Site . Pine Street is improved with 2-traffic lanes with no curb, gutter or sidewalk abutting the site. . Commercial Avenue is improved with 2-traffic lanes with curb, gutter and sidewalk. 7. Existing Right-of~Way . Pine Street currently has 50-feet of right-of-way (25-feet from centerline). . Commercial Avenue currently has 60-feet of right-of-way (30-feet from centerline). 9. Existing Access to the Site The site currently takes access from a driveway that intersects Pine Street approximately 20-feet east of the west property line. 10. Site History The Commission approved Mayfair Commons Subdivision (MPP03-0311MCUP03-057/MRZ03-011) on August 6, 2003. The subdivision was proposed to contain 35-multi-family lots, 3-indutriallots and 2 17 -common lots on 12.7 4-acres. The proposed development was denied by Meridian Council due to lack of land use compatibility (multi-family & industrial). 11. Capital Improvements Plan/Five Year Work Program There are no projects within this area that are scheduled in the District's Five Year Work Program or Capital Improvements Plan. B. Findings for Consideration 1. Pine Avenue Right-of-Way & Sidewalk District policy requires 74-feet of right-of-way on 3-lane minor arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. The adjoining road is not listed as a proposed project in the District's currently adopted Five-Year Work Program or in the currently adopted 20-year Capital Improvements Plan. As such, the applicant cannot receive reimbursement for dedicated right-of-way from available collected impact fees. The applicant shall do one of the following: a. Dedicate by donation a total of 37-feet of right-of-way (from the centerline) along Pine Avenue, and construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located a minimum of 30-feet from the centerline of the right-of-way. b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located a minimum of 37-feet from the centerline of the right-of-way, in an easement provided to the District. c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located at the back edge of the existing right-of-way. Accomplish all necessary adjustments to properly accommodate existing drainage and utilities. 2. Driveways District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 25 to align or offset a minimum of 105-feet from any existing or proposed driveway. District policy 7207.9.3 restricts industrial driveways to a maximum width of 40-feet. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. Location · The applicant is proposing to construct a driveway that intersects Pine Avenue approximately 150-feet east of the west property line and aligns with Stonehenge Way. This driveway location meets District policy and should be approved with this application. 3 Width I Pavino · The applicant should be required to pave the driveway its full width (maximum 40-feet wide) and at least 30-feet into the site beyond the edge of pavement of Pine Avenue and install pavement tapers with 15-foot radii abutting the existing roadway edge. 3. Stub Streets District policy 7203.5.1 and 7205.5 requires stub streets to provide intra-neighborhood circulation and to provide access to adjoining parcels. District policy also requires temporary turnarounds with a temporary easement provided to the District at the end of stub streets that serve more than one lot, or are greater than 150-feet in length with a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". . The applicant is proposing to extend Commercial Avenue from the east property line and extend it to the west property line. Staff is supportive of the extension of Commercial Avenue. Due to the fact that Commercial Avenue is greater than one lot in depth and greater than 150- feet, that applicant should construct a temporary turnaround at the terminus of Commercial Avenue. The applicant should also install a sign at the terminus of Commercial Avenue stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 4. Street Sections District policy 7202.8 and 72-F1A, requires roadways abutting commercial developments to be constructed as a 40-foot street section with curb, gutter and 5-foot concrete sidewalk within 54-feet of right-of-way. . The applicant should be required to construct Commercial Avenue as a 40-foot street section with curb, gutter and sidewalk within 54-feet of right-of-way. The curves shall have a minimum 500-foot radius or 100-foot tangent between the curves. 5. Other Access Pine Street is classified as a Minor Arterial roadway. Other than the access point that has specifically been approved with this application, direct lot access to Pine Avenue is prohibited. Notes of this shall be noted on the plat. C. Site Specific Conditions of Approval 1. The applicant shall do one of the following: a. Dedicate by donation a total of 37-feet of right-of-way (from the centerline) along Pine Avenue, and construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located a minimum of 30-feet from the centerline of the right-of-way. b. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located a minimum of 37-feet from the centerline of the right-of-way, in an easement provided to the District. c. Do not dedicate additional right-of-way, but construct a minimum 5-foot wide concrete sidewalk along Pine Avenue, located at the back edge of the existing right-of-way. Accomplish all necessary adjustments to properly accommodate existing drainage and utilities. 4 . ' 2. Construct a (40-foot wide maximum) driveway that intersects Pine Avenue approximately 150-feet east of the west property line and align the driveway with Stonehenge Way (centerline to centerline), and pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the roadway edge. 3. Extend Commercial Avenue from the east property line and extend it to the west property line. Construct a temporary turnaround at the terminus of Commercial Avenue. Install a sign at the terminus of Commercial Avenue stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 4. Construct Commercial Avenue as a 40-foot street section with curb, gutter and sidewalk within 54- feet of right-of-way. The curves shall have a minimum of 500-foot radius or 100-foot tangent between the curves. 5. Other than the access point that has specifically been approved with this application, direct lot access to Pine Avenue is prohibited. Notes of this access restriction shall be noted on the plat. 6. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of~way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 6. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 7. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 8. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 9. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance. 5 , . 10. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 12. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Request for Appeal Guidelines 6 ~~"'--\'Bffi-- ....-. \ \ ..... ' -- \I - '\ \\\ \1 Y ::::." -- r"\. " T \ \ \ I I ' . \"'\......... \, r ,\ ~l :---E .,~ ,\),7\\ "/ vr l ,..-. v f-- ~ "r-' - ~~. \': :;:?:.. ..- Jr ri/~I Y1 If ,\ ~\. I ~_ :c \ T /"" ........ r"iA r ., \ \ 11 \ I ~ rr ~ \ ~.... 7 ' ' II __ r.. \ ~ -- r~ [11' ,"=i"'\. J- /J- F\I.... - - --1' ... ,__~\:'f..-J:...;J L- ~- _/Ill --I ~_ <-- l 1 ';' !.. ~... - " __ .'__ 1-\~ -- -~ -' - ...- ....-1 ~ :~, srfE ~A- 4fJ':. ..... - / \ . .' ... .. -.... -.. ...... . -. _. T,T Ul~"Ul~ ~V'\T" \V ~> ~ ~ , ...- -. \ ...-T......... \ . . 7' ~5_ ~ ~ - . . \ , i LU ,. '" ,. . ... ~Ll , , , \ \ \ , I t t 0Jil\IE I:' =----- "- "- \ ~,~ jDaIt 11 'H \ \ \ ~~ \ t#'"- , I I I It \ \ pOIItCS , I , I , I I I \ Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 9 II Development Process Checklist II I2ISubmit a development application to a City or to the County I2IThe City or the County will transmit the development application to ACHD I2IThe ACHD Planning Review Division will receive the development application to review I8IThe Planning Review Division will do ~ of the following: DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. I2IWrite a Staff level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. DWrite a Commission level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. I2IThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission level reports. OFor All development applications, including those receiving a "No Review" or "Comply With" letter: · The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) · The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) o Driveway or Property Approach(s) · Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. o Working in the ACHD Right-of-Way · Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) o Sediment & Erosion Submittal · At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. o Idaho Power Company · Vie Steelman at Idaho Power must have his IPca approved set of subdivision utility plans prior to Pre-Con being scheduled. o Final Approval from Development Services · ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 10 -, Figure 1 ~~8~ !i J ~...:i p~i I 'E.a~-8 e ffll l ~ji'" · ~q~ S l!, - '"' li3 ! ~h t 11 - =.g ~ ~ it [I Ii J__... I___.J