HomeMy WebLinkAboutUpdated Preliminary Site Plan - 965 ustick `n E
V
H �
V
L
V L
0
LU
c
STOP SIGN 1 3
NOTES: fill •' 3
VERIFY ALL HOSE BIB LOCATIONS WITH OWNER.
INSTALL INTERIOR SOUND INSULATION-VERIFY LOCATIONS WITH OWNER. FUTURE
FINISHES:CONTRACTOR AND OWNER SHALL REVIEW ALL FINISH MATERIALS PRIOR TO CONSTRUCTION TO PROVIDE ;I MONUMENT *_0SUBSTRUCTURE AS REQUIRED FOR PROPER INSTALLATION OF THESE MATERIALS. SIGN 01�
ALL FINISHED CORNERS OF SHEET ROCK WALLS TO BE BULLNOSE OR AS BY OWNER. COORD PROTECTION OF CORNERS 414- -41 4 -4, -41 It- 11, 4- 11, � ILI
TO 48"A.F.F.W/STEEL OR PLASTIC PROTECTORS. 4- -4- 'l- -4- 4, -4- 11- 4- 41 41
AGGESS�SLE RADUTE4TYP),i, 1, -4- .1, 1, -4, i, .i, .- �, .L, .L,
ALL BUILT-INS AND CABINETRY DESIGN BY OTHERS. ll- � 4- 11, -41 -4, -41 � -41 � ��-
VERIFY DIFFERENT FLOOR FINISHES SELECTED BY OWNER/CONTRACTOR TO ADJUST SUB FLOOR HEIGHTS AS REQUIRED � ,I, 'I, .- .4, ,I,,,I,, -41 '1, �, 4, -4, � �-
06
TO ACCOMMODATE MATERIAL THICKNESS DIFFERENCES. 11 11, , ' `1 `- , `1 0
CONTRACTOR TO VERIFY ADEQUATE SITE DRAINAGE. `�- `�' ' `4 4'
y -4- -41 11, LU
INTERIOR DESIGN TO BE BY OTHERS. '�' -41 -4, _41 0
NON-STRUCTURAL ROOF OR CEILING BEAMS MUST BE SECURELY ANCHORED TO FRAMING. CONTRACTOR'S OPTION TO INSTALL ol 14' 23' 1 O
BEFORE OR AFTER(OVER)SHEET ROCK FOR INTERIOR APPLICATIONS. ALL FASTNERS MUST BE COUNTERSUNK AND PLUGGED. LU
CL
VERIFY THAT ALL EGRESS WINDOWS HAVE A MIN.5.7 SQ. FT. OF CLEAR SPACE W/24" MIN. VERTICAL CLEAR,20"MIN. -4, 4-
HORIZONTAL CLEAR AND SILL HEIGHT OF LESS THAN 44"AND ALL OTHER I.B.C. R310 WINDOW REQUIREMENTS FOR EGRESS LO
WINDOWS. _ / .i, ll-- •
OWNER TO COORDINATE AND VERIFY ALL PLUMBING FIXTURE LOCATIONS SUCH AS SHOWER HEADS ETC.
VERIFY INSULATION MINIMUMS: CEILINGS R-32,WALLS R-19, SLAB PERIMETER R-10. 4-ALLZ 0
ALL MECHANICAL EQUIP
HOLD ALL FINISH GRADE&LANDSCAPING DOWN 6" MIN. FROM SIDINGS&TOP OF FOUNDATION WALL. TO BE LOCATED 10'OR Y N
MORE FROM ROOF EDGE SEAMLESS VAPOR BARRIER/RADON RETARDER TO BE USED BELOW ALL SLABS.OWNER OPTION TO GO FURTHER WITH RADON (TYP) Q ,i, LUQO
OR MOLD PREVENTION STEPS. y w
ALL EXPOSED METAL FLASHINGS TO BE COLORED METAL OR AS PER OWNER. J' O
Cl)
zo 41 Q
4--41
MAIN BICYCLE41
LUU
ENTRANCE PARKING
(2 SPACES) -4, O O
-1-
13' 24'-9314" m
13'
ABBREVIATIONS � � 4
RAMP SLO E MAX 1:12 TO �
MAX 6"HEI HT, HIGHER
A.B. = Anchor Bolt LF. = Lineal Feet RAMP TO LOPE MAX 1:20
A/C = Air Conditioning LIN. = Linen T A CESSIB E PARKING STALL ~
ADJ. = Adjustable LOG. = Location TO HAVE N AX SLOPE OF 1: 8 U
A.F.F. = Above Finish Floor
LR. = Living Room Q 0 0
ALT. = Alternate MAX. = Maximum TRASH ENCLOSURE(2X 96-GALLON) Q O (n Z
ALUM. = Aluminum
MFR. = Manufacture 5'X5'MIN LANDING FENCING TO MATCH SITE PERIMETER LL
MICRO. = Microwave @ BASE OF RAMP — _ LLJ
APMR = A5 Per Manufacturer's MIN. = Minimum Z
Recommendations LO
MTL. = Metal a Z Z
B.B. = Bond Beam N.I.G. = Not In Contract TOTAL PARKING Q Uj N
8' 10
BD. = Board
O.G. = On Center „a.. SPACES=37
BM. = Beam
PLAM. = Plastic Laminate � � C)
B.O. = Bottom Of PL. = Plate 4- Q LU
B.O.B. = Bottom Of Beam �-
BOT. = Bottom PLN. = Plan -, ,i, Z C)
BSE. = Base PLY. = Ply wood
B.W. = Both Ways PLUMB. = Plumbing ,,, �/'� Y � Q N
P.M. = Project Manual c /
GAB. = Cabinet �-
G.J. = Control Joint P.T. = Pressure Treated ,,, ,,, � >0 D
RAFT. = Rafter 4- — > uj
G.L. = Clean Out -1- 1, 4- 4- -4- 4- 4- -4, -41 4- -41 �-R.B. = Roof Beam ,,, ,,, ,,, ,,, ,,, ,,, ,,, ,,, ,,, 4_ ,,, -41 4 4- -41 -41 4-
,,, ,,, ,,, �, ,,, LO
COL. = Column
REF. = Refrigerator �- �- -, .11 .� -4, ,1, ., 4- .11 ., �. .1 .t, .� ,.� 41 .I, � -, �- 4- L
GONG. = Concrete -41 �- 4- -4- �- -41 �- �- 4- -4- �- 4- 41 -41 �- J- �- �►- d�
GONT. = Continuous Repro = Reproduction ,,, , , , ,,, ,,, ,,, ,,, ,,, 41 ,,, ,,, ,,, , ,,, ,,, ,,, � ,,,
REINF. = Reinforcing J- J- J- � J- -41 J- J- J- J- � �, 1, J-
COORD. = Coordinate -4, -4, -4, �- -4, 4- 4- -4, �- 4- �- �- 4- �- -4, �- �- -4, 41 -4, 4,
REQ. = Required IL, _4' i. ILI 4- i. i. I, -41 i. 4, -4- .i. .i. .i, i co= Down Spout RES. = Residence y y
D. = Dryer N
R.G. = Rain Gutter \\
DET. = Detail R.J. = Roof Joist
DIA. = Diameter RM. = Room
DIAL. = Diagonal R.O. = Rough Opening _
DN. = Disposal R.5. = Rough Sawn
D = Down 5DL = Single Divided Light
DO = Ditto S.F. = Square Feet
D..W. = Dish Washer EA. = Each SIM. = Similar EL. SIMP. = Simpson
= Electrical 5.I.P. = Structural Insulated Panel
EL. = Elevation SPEC. = Specification
ELEV. = Elevation STL. = Steel
EXIST. = Existing TDL = True Divided Light
EXP. = Expansion TEMP. = Temperature
EXT. = Exterior re
T a G = Tongue and Groove
FAB. = Fabrication T.O. = Top Of
F.B. = Floor Beam
w E F.D. = Floor Drain T.O.A. = Top Of Arch
c
CD
FDN. = Foundation T.O.B. = Top Of Beam
a, � = T.O.B.B. = Top Of Bond Beam SITE PLAN
m Q 3 .; FE. = Fire Extinguisher
O N aci F.F. = Finish Floor T.O.F. = Top Of Footing 1" =20'
m c T.O.P. = Top Of Pier
E ° '� FIN. = Finish
o o F.J. = Floor Joist T.O.S. = Top Of Slab
c '> F.O.W. = Face of Wall T.O.W. = Top Of Wall
.. >. _ Q TYP. = Typical _
@ a c FLR. = Floor U.B.G. = Uniform Building Gode
c F.P. = Fire Place U.N.O. = Unless Noted Otherwise �I -
c °' o FRMG. = Framing
e� 1
E
U c FT. = Feet UTIL. = Utility SITE
FTC. = Footing
Y 3 CFI. = Ground Fault Interrupt EE
VERY. = verticals
w c o GYP. = G
v. = volt
sum V.I.F. = verify In Field .�
E H.B. = Hose Bib
3 E W. = Washer a cm .
c, Z HC = Handicap y.V = With '"
•°a HORIZ. = Horizontal ` -willa:
�, .. W.H. = Water Heater !.[,
c HT. = Height W.P. = Water Proof
F_ L I.B.0 = International Building Code
_
3 a a, K.P. = King Post - —
t - m
O LAST EDITED:6/30/09 — -_ • ,
+. 0 r
a 3
L
3 ° N i
N
Z
CD
'L O
O
U v d y
O
fA O O_
N
N
SITE LOCATION
NOT TO SCALE
ll
W
DATE:1/24/25
z