Loading...
HomeMy WebLinkAboutUpdated Preliminary Site Plan - 965 ustick `n E V H � V L V L 0 LU c STOP SIGN 1 3 NOTES: fill •' 3 VERIFY ALL HOSE BIB LOCATIONS WITH OWNER. INSTALL INTERIOR SOUND INSULATION-VERIFY LOCATIONS WITH OWNER. FUTURE FINISHES:CONTRACTOR AND OWNER SHALL REVIEW ALL FINISH MATERIALS PRIOR TO CONSTRUCTION TO PROVIDE ;I MONUMENT *_0SUBSTRUCTURE AS REQUIRED FOR PROPER INSTALLATION OF THESE MATERIALS. SIGN 01� ALL FINISHED CORNERS OF SHEET ROCK WALLS TO BE BULLNOSE OR AS BY OWNER. COORD PROTECTION OF CORNERS 414- -41 4 -4, -41 It- 11, 4- 11, � ILI TO 48"A.F.F.W/STEEL OR PLASTIC PROTECTORS. 4- -4- 'l- -4- 4, -4- 11- 4- 41 41 AGGESS�SLE RADUTE4TYP),i, 1, -4- .1, 1, -4, i, .i, .- �, .L, .L, ALL BUILT-INS AND CABINETRY DESIGN BY OTHERS. ll- � 4- 11, -41 -4, -41 � -41 � ��- VERIFY DIFFERENT FLOOR FINISHES SELECTED BY OWNER/CONTRACTOR TO ADJUST SUB FLOOR HEIGHTS AS REQUIRED � ,I, 'I, .- .4, ,I,,,I,, -41 '1, �, 4, -4, � �- 06 TO ACCOMMODATE MATERIAL THICKNESS DIFFERENCES. 11 11, , ' `1 `- , `1 0 CONTRACTOR TO VERIFY ADEQUATE SITE DRAINAGE. `�- `�' ' `4 4' y -4- -41 11, LU INTERIOR DESIGN TO BE BY OTHERS. '�' -41 -4, _41 0 NON-STRUCTURAL ROOF OR CEILING BEAMS MUST BE SECURELY ANCHORED TO FRAMING. CONTRACTOR'S OPTION TO INSTALL ol 14' 23' 1 O BEFORE OR AFTER(OVER)SHEET ROCK FOR INTERIOR APPLICATIONS. ALL FASTNERS MUST BE COUNTERSUNK AND PLUGGED. LU CL VERIFY THAT ALL EGRESS WINDOWS HAVE A MIN.5.7 SQ. FT. OF CLEAR SPACE W/24" MIN. VERTICAL CLEAR,20"MIN. -4, 4- HORIZONTAL CLEAR AND SILL HEIGHT OF LESS THAN 44"AND ALL OTHER I.B.C. R310 WINDOW REQUIREMENTS FOR EGRESS LO WINDOWS. _ / .i, ll-- • OWNER TO COORDINATE AND VERIFY ALL PLUMBING FIXTURE LOCATIONS SUCH AS SHOWER HEADS ETC. VERIFY INSULATION MINIMUMS: CEILINGS R-32,WALLS R-19, SLAB PERIMETER R-10. 4-ALLZ 0 ALL MECHANICAL EQUIP HOLD ALL FINISH GRADE&LANDSCAPING DOWN 6" MIN. FROM SIDINGS&TOP OF FOUNDATION WALL. TO BE LOCATED 10'OR Y N MORE FROM ROOF EDGE SEAMLESS VAPOR BARRIER/RADON RETARDER TO BE USED BELOW ALL SLABS.OWNER OPTION TO GO FURTHER WITH RADON (TYP) Q ,i, LUQO OR MOLD PREVENTION STEPS. y w ALL EXPOSED METAL FLASHINGS TO BE COLORED METAL OR AS PER OWNER. J' O Cl) zo 41 Q 4--41 MAIN BICYCLE41 LUU ENTRANCE PARKING (2 SPACES) -4, O O -1- 13' 24'-9314" m 13' ABBREVIATIONS � � 4 RAMP SLO E MAX 1:12 TO � MAX 6"HEI HT, HIGHER A.B. = Anchor Bolt LF. = Lineal Feet RAMP TO LOPE MAX 1:20 A/C = Air Conditioning LIN. = Linen T A CESSIB E PARKING STALL ~ ADJ. = Adjustable LOG. = Location TO HAVE N AX SLOPE OF 1: 8 U A.F.F. = Above Finish Floor LR. = Living Room Q 0 0 ALT. = Alternate MAX. = Maximum TRASH ENCLOSURE(2X 96-GALLON) Q O (n Z ALUM. = Aluminum MFR. = Manufacture 5'X5'MIN LANDING FENCING TO MATCH SITE PERIMETER LL MICRO. = Microwave @ BASE OF RAMP — _ LLJ APMR = A5 Per Manufacturer's MIN. = Minimum Z Recommendations LO MTL. = Metal a Z Z B.B. = Bond Beam N.I.G. = Not In Contract TOTAL PARKING Q Uj N 8' 10 BD. = Board O.G. = On Center „a.. SPACES=37 BM. = Beam PLAM. = Plastic Laminate � � C) B.O. = Bottom Of PL. = Plate 4- Q LU B.O.B. = Bottom Of Beam �- BOT. = Bottom PLN. = Plan -, ,i, Z C) BSE. = Base PLY. = Ply wood B.W. = Both Ways PLUMB. = Plumbing ,,, �/'� Y � Q N P.M. = Project Manual c / GAB. = Cabinet �- G.J. = Control Joint P.T. = Pressure Treated ,,, ,,, � >0 D RAFT. = Rafter 4- — > uj G.L. = Clean Out -1- 1, 4- 4- -4- 4- 4- -4, -41 4- -41 �-R.B. = Roof Beam ,,, ,,, ,,, ,,, ,,, ,,, ,,, ,,, ,,, 4_ ,,, -41 4 4- -41 -41 4- ,,, ,,, ,,, �, ,,, LO COL. = Column REF. = Refrigerator �- �- -, .11 .� -4, ,1, ., 4- .11 ., �. .1 .t, .� ,.� 41 .I, � -, �- 4- L GONG. = Concrete -41 �- 4- -4- �- -41 �- �- 4- -4- �- 4- 41 -41 �- J- �- �►- d� GONT. = Continuous Repro = Reproduction ,,, , , , ,,, ,,, ,,, ,,, ,,, 41 ,,, ,,, ,,, , ,,, ,,, ,,, � ,,, REINF. = Reinforcing J- J- J- � J- -41 J- J- J- J- � �, 1, J- COORD. = Coordinate -4, -4, -4, �- -4, 4- 4- -4, �- 4- �- �- 4- �- -4, �- �- -4, 41 -4, 4, REQ. = Required IL, _4' i. ILI 4- i. i. I, -41 i. 4, -4- .i. .i. .i, i co= Down Spout RES. = Residence y y D. = Dryer N R.G. = Rain Gutter \\ DET. = Detail R.J. = Roof Joist DIA. = Diameter RM. = Room DIAL. = Diagonal R.O. = Rough Opening _ DN. = Disposal R.5. = Rough Sawn D = Down 5DL = Single Divided Light DO = Ditto S.F. = Square Feet D..W. = Dish Washer EA. = Each SIM. = Similar EL. SIMP. = Simpson = Electrical 5.I.P. = Structural Insulated Panel EL. = Elevation SPEC. = Specification ELEV. = Elevation STL. = Steel EXIST. = Existing TDL = True Divided Light EXP. = Expansion TEMP. = Temperature EXT. = Exterior re T a G = Tongue and Groove FAB. = Fabrication T.O. = Top Of F.B. = Floor Beam w E F.D. = Floor Drain T.O.A. = Top Of Arch c CD FDN. = Foundation T.O.B. = Top Of Beam a, � = T.O.B.B. = Top Of Bond Beam SITE PLAN m Q 3 .; FE. = Fire Extinguisher O N aci F.F. = Finish Floor T.O.F. = Top Of Footing 1" =20' m c T.O.P. = Top Of Pier E ° '� FIN. = Finish o o F.J. = Floor Joist T.O.S. = Top Of Slab c '> F.O.W. = Face of Wall T.O.W. = Top Of Wall .. >. _ Q TYP. = Typical _ @ a c FLR. = Floor U.B.G. = Uniform Building Gode c F.P. = Fire Place U.N.O. = Unless Noted Otherwise �I - c °' o FRMG. = Framing e� 1 E U c FT. = Feet UTIL. = Utility SITE FTC. = Footing Y 3 CFI. = Ground Fault Interrupt EE VERY. = verticals w c o GYP. = G v. = volt sum V.I.F. = verify In Field .� E H.B. = Hose Bib 3 E W. = Washer a cm . c, Z HC = Handicap y.V = With '" •°a HORIZ. = Horizontal ` -willa: �, .. W.H. = Water Heater !.[, c HT. = Height W.P. = Water Proof F_ L I.B.0 = International Building Code _ 3 a a, K.P. = King Post - — t - m O LAST EDITED:6/30/09 — -_ • , +. 0 r a 3 L 3 ° N i N Z CD 'L O O U v d y O fA O O_ N N SITE LOCATION NOT TO SCALE ll W DATE:1/24/25 z