Loading...
HomeMy WebLinkAboutCC - Engineers Statement lAOMAD. 1W -_q - - November 7, 2024 City of Meridian 33 E. Broadway Ave, Suite 210 Meridian, Idaho 83642 RE: Keep West Subdivision—Road Centerline Elevations To Whom It May Concern: Please accept this letter as certification that the roadway centerline elevations within the referenced project are designed a minimum of three (3)feet above the seasonal high groundwater elevation (SHGWE). The SHGWE was determined by a geotechnical exploration conducted by Atlas and summarized in the report, Residential Subdivision, dated January 27, 2023 and given the Atlas project file number B222755g. Sincerely, EDM Partners, LLC ONAL FF�c�A 14176 N� 11/7/24 z 44/ 9�FOF� O R . Ted Burke, PE Partner www.edmpartners.com 9 2815 East 3300 South,Salt Lake City, UT 84109 • 801-305-4670