Loading...
HomeMy WebLinkAboutFA-1.1 South Netherfield Way MERIDIAN CITY APPROVAL \ \ \ \ \ CONTRACTOR TO MATCHDM \ \ WALK TO VERTEX PHASE \ \ 2 SUBDIVISION WALK VERTEX PHASE 2 L L Partners \ \ \ \ \ SUBDIVISION \ STA 0+63.28, 14.31'LT. \ \ \ \ \ 2815 East 3300 South, Salt Lake City, UT 84109 \ STA 0+63.26, 0.19'RT., \ \ EX. TOP OF BANK, (801) 305-4670 www.edmpartners.com \ ANTICIPATED END OF VERTEX \ ' FARR LATERAL \ PHASE 2 ROAD CONSTRUCTION00, vo \ STA 0+63.28, 14.69 RT. CONTRACTOR TO MATCH 8 Gp WALK TO VERTEX PHASE 2 SUBDIVISION WALK 5°0\ STA 0+74.99 \\ / SCALE: 1" = 20'r, 30• \\ FP n o \\\ Noy° �3�° °�� 0 10 20 40 60 y OWNER: Dawson Ranch, LLC N oy \�\ 6865 S. Pemberley Pl. STA 0°+93.29, 14.28'LT% . ` Meridian, ID 83642 Noy° s �' y�°/ P°' \\ 75'�TYP.� VERTEX PHASE 2 , LL Contact:Jarron Langston \ \ \\ \ 1 / \\ �a ' I^ PHONE: (208)724-6239 SUBDIVISION 00 \ \\ \ \ FUTURE 8"WATER MAIN CURRENTLY UNDER - �V0 STA 0+93.26, 14.72'RT. CONSTRUCTION IN VERTEX 2 SUBDIVISION. \ \ \ \ \\ CONTRACTOR TO COORDINATE WITH VERTEX 2 \\ \ CONTRACTOR Et CITY OF MERIDIAN FOR CONNECTION. p/ Noy`° NOTES: Vol / \ 7.00'\ 1. This drawing is considered preliminary unless 100 N g3 3$ \\\ �q °o affixed with a municipal approval or accompanied by a separate approval document. STA 0+63.26, 0.19'RT., \ EX. TOP OF BANK / �' ,� / `�� / 2. All sanitary sewer improvements shall conform ANTICIPATED END OF VERTEX / oy�° STA 1+28.64, 14.50'LT. .01 PHASE 2 ROAD CONSTRUCTION \ \ FARR LATERAL Noy° / a/ �� N / 6 io with the standards and specifications of the \ / �� _ / \\ 6�9 �� City of Meridian. \ y�°/ /� 30° STA 1+19.43, 14.50'RT. \�\ / / i 3. All culinary water improvements shall conform STA 0+74.99��\ No / d / 1 i with the standards and specifications of the EX. TOP OF BANK, ,� °d 3o ao City of Meridian. FARR LATERAL Q' / i 4. All improvements in the public right of way y\° INSTALL 50 LF OF 000 shall conform with the standards and STA 1+26.37, A k93. 12"STEEL SLEEVE / ,a;y�� ^ , specifications of the Ada County Highway Noy° e°'° / °° � i , District (ACHD) and the Idaho Standards For ° / yo/ // / i / sS Public Works Construction-ACHD Supplement / (ISPWC-ACHD). / ,a / - ' / � 00-� 5. All private improvements shall conform to Idaho N / Standards For Public Works Construction Noy° \ ° // (ISPWC) standards and specifications. 6 Contractohe horizontal and field to verify locate and t and vertical location of all utilities BRIDGE DIMENSIONAL DETAIL DIMENSIONAL NOTE: SEE STRUCTURAL PLANS FOR prior to beginning work. / EX. TOP OF BANK, \° / j S S�°F�y\ SCALE: 1"= 10' BRIDGE DIMENSIONS. STRUCTURAL PLANS TO � Noy�o FARR LATERAL STA 1+26.37 / 44 PREVAIL. 0000� 10 N S. NETHERFIELD WAY 2+00 SS SS THE KEEP PHASE 2 \ M I \ KEY MAP i /Ss sz/ STA 1+48.67, 20.22'RT. 441VDS CgP^, 1G " m ��� M M M M \ I FA-1.1 � - LOT 21 APPROVED FOR CONSTRUCTION: FARR LATERAL BRIDGE PLAN These plans are valid for construction only with the 2770 HORIZONTAL SCALE: 1" = 20' 2770 signature of the design engineer on the line below. v w 0 Z 3? Approved Date 01 co r, - CO o O 7 W N 2765 � ^ M �Cn 2765 o, a, N 0 N ANAL F u1 M ^ N v v 'Lln, LAv~ z W W O �� APPROX. END OF ROAD N STA: 1+23.33 N 12 419 6 4 0 2760 2760 � 44/ w \ PRESSUREq R\ Ln IRRIGATION CROSSING co \ FINISH GRADE @CL v \ (KEEP 2 2755 COMBINATION IMPROVEMENT PLAN S) 2755 o AIR/RELEASE VALVE, Farr Lateral PER ISPWC SD-408A E WATER CONNECTION IN .� \ EXISTING GRADE v VERTEX 2 SUBDIVISION PLANS �cL tossing J — — — — — — South Netherfield Way 2750 2750 M — — — — — — — — — — — — — — Utility Plan & Profile A PROJECT: w 8" GATE VALVE DRAWN BY: CRS N 50 LF 12" STEEL SLEEVE 2745 2745 REVISIONS: No. ERB No. DATE REMARKS v Ey 45.21 LF of 8"SDR 0 35 SS @ 0.65% v o x + 2740 2740 U U 0+50 1+00 2+00 3+00 k O FARR LATERAL BRIDGE PROFILE DATE: October 9, 2024 Q HORIZONTAL SCALE: 1" = 20' U Y VERTICAL SCALE: 1" = 5' SHEET NUMBER: FAa Q 191 A