Loading...
HomeMy WebLinkAboutDasco Of Idaho Can Ada Lift Station CONTRACT CHECKLIST I. PROJECT INFORMATION Date: 1/9/2025 REQUESTING DEPARTMENT Public Works Project Name: Can Ada Lift Station&Gravity Line Project Manager: David Briggs Contract Amount: $22,470,000 Contractor/Consultant/Design Engineer: Dasco of Idaho Is this a change order? Yes ❑ No ❑ Change Order No. II. BUDGET INFORMATION (Project Manager to Complete) III. Contract Type Fund: 65 Budget Available(Purchasing attach report): Department 3590 Yes ❑� No ❑ Construction ❑ GL Account 96144 FY Budget: 2025&2026 Task Order ❑ Project Number: 10038.f Enhancement: Yes ❑ No ❑ Professional Service ❑ Equipment ❑ Will the project cross fiscal years? Yes❑ No ❑ Grant ❑ IV. PROCUREMENT USE ONLY-GRANT INFORMATION(to be completed only on Grant funded projects) Grant#: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status(Federal Funded) N/A Print and Attach the determination Print,attach and amend bid by addendum(if changed) www.sam.gov Print and attach V. BASIS OF AWARD BID RFP/RFQ TASK ORDER Award based on Low Bid Highest Ranked Vendor Selected Master Agreement Category N/A (Bid Results Attached) Yes No ❑ (Ratings Attached) Yes ❑No Date MSA Roster Approved: Typical Award Yes 0 No ❑ If no please state circumstances and conclusion: Date Award Posted: 12/26/2024 7 day protest period ends: January 2,2025 VI. PROCUREMENT USE ONLY-CONTRACTOR/CONSULTANT REQUIRED INFORMATION PW License 9770 Expiration Date: 6/30/2025 Corporation Status Active Insurance Certificates Received(Date): 1/8/2025 Expiration Date: 3/1/2025 Rating: Payment and Performance Bonds Received(Date): 1/8/2025 Rating: Builders Risk Ins.Req'd: Yes ❑J No ❑ If yes,has policy been purchased? (Only applicabale for projects above$1,000,000) VII. TASK ORDER SELECTION (Project Manager to Complete) Reason Consultant Selected ❑ 1 Performance on past projects Check all that apply ❑ Quality of work ❑ On Budget ❑On Time ❑ Accuracy of Construction Est ❑ 2 Qualified Personnel ❑ 3 Availability of personnel ❑ 4 Local of personnel Description of negotiation process and fee evaluation: Enter supervisor Name Date Approve Vill. PROCUREMENT USE ONLY- AWARD INFORMATION Date Submitted to Clerk for Agenda: January 9,2025 Approval Date 1/21/2025 By: city Council Purchase Order No.: Date Issued: WH5 submitted (Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final City Of Meridian Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 65 - Wastewater Fund 3590 - WW Construction Projects From 10/1/2024 Through 9/30/2025 Budget with Current Year Budget Amendments Actual Remaining Capital Outlay 96144 Lift Station construction 20,404,221.31 7,663.43 20,396,557.88 Total Capital Outlay 20,404,221.31 7,663.43 20,396,557.88 DEPT EXPENDITURES 20,404,221.31 7,663.43 20,396,557.88 TOTAL EXPENDITURES 20,404,221.31 7,663.43 20,396,557.88 Date: 1/9/25 12:07:42 PM Page: 1 OPTION 1: OPEN CUT (BT-35CX) Legend The green cells with bolded numbers indicate that this bid was the lowest price. The orange cells indicate that this item from that vendor was selected. The green cells with orange outline indicate that this item from that vendor was self has the lowest price. $ 123 acted, and BID NAI BID NUI BID DUI #1-1 #1-2 #1-3 #1-4 #2-1 #2-2 #2-3 #3-1 #3-2 #3-3 #3-4 #3-5 #3-6 #3-7 #3-8 #3-9 #3-10 #3-11 #3-12 #3-13 #3-14 #3-15 #3-16 #3-17 #3-18 #3-19 #3-20 #3-21 #3-22 #3-23 #3-24 #3-25 #3-26 #3-27 #3-28 #3-29 ((El IDIAN:--- ME: Can Ada Lift Station & Gravity Sewer Line MBER: PW-2505-10038.f E DATE: December 17, 2024 2:30PM BID RESULTS Items GENERAL (4) 0122 20 1.2 A 1- Mobilization, Bonds, Insurance and Demobilization 0122 20 1.2 A 2- Erosion and Sediment Control 0122 20 1.2 A 3 -Traffic Control 0122 20 1.2 A 4- Potholing 0122 20 1.2 B 1 -Can Ada Lift Station 0122 20 1.2 B 2 -Shoring 0122 20 1.2 B 3- Dewatering- Llft Station GRAVITY & FORCEMAIN PIPELINESO. 0122 20 1.2 C 1 -Gravel Surface Restoration 0122 20 1.2 C 2 - Native/Sod/Landscape Surface Restoration 0122 20 1.2 C 3 -60" Standard Sanitary Sewer Manhole 0122 20 1.2 C 4-48" Standard Sanitary Sewer Manhole 0122 20 1.2 C 5 -60" Vortex Sanitary Sewer Manhole 0122 20 1.2 C 6 a - 15" Gravity Sewer-Open Cut 0122 20 1.2 C 7 a -18" Gravity Sewer- Open Cut 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Gravity) - Five Mile Creek-STA 1+80 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Gravity) -William's Pipeline-STA 30+00 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Gravity) - Phyllis Canal -STA 46+20 0122 20 1.2 C 10- 14" HDPE DR17 Pipe -Open Trench 0122 20 1.2 C 11 - 10" HDPE DR17 Pipe -Open Trench 0122 20 1.2 C 12 -Thrust Wall 0122 20 1.2 C 13 - Dual Air/Vac Valve - Five Mile Creek 0122 20 1.2 C 13- Dual Air/Vac Valve-William's Pipeline 0122 20 1.2 C 13 - Dual Air/Vac Valve - Phyllis Canal 0122 20 1.2 C 13 - Dual Air/Vac Valve - McMillan/McDermott 0122 20 1.2 C 14- 14" Plug Valve 0122 20 1.2 C 15 - 10" Plug Valve 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Pressure) - Five Mile Creek-STA 1+80 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Pressure) -William's Pipeline-STA 30+00 0122 20 1.2 C 9-Trenchless Installation 36" Steel Casing(Pressure) - Phyllis Canal -STA 46+20 0122 20 1.2 C 16-Shoring 0122 20 1.2 C 17 - Dewatering-Gravity 0122 20 1.2 C 18- Dewatering- Forcemain 0122 20 1.2 C 19 -Trench/Soft Spot Stabilization (USED ONLY WITH PRIOR APPROVAL FROM OWNER) 0122 20 1.2 C 20 a -Asphalt Surface Restoration - McMillan Rd -Can Ada to Star Road - Full Road Pavement Rest( 0122 20 1.2 C 21 -Asphalt Surface Restoration - McMillan Rd -Star Road to McDermont-Single Lane Pavement F 0122 20 1.2 C 22 -Asphalt Surface Restoration - McDermont Rd -Single Lane Pavement Restoration Dasco of Idaho Total Cost $ 22,470,000.0 Selected# 36 Selected ($) $ 22,470,000.0 Selected Lowest Quantity Unit UnitPrice TotalCost $ 1,000,000.0 $ 1,000,000.0 1 LS $ 1,000,000.0 $ 1,000,000.0 $ 135,000.0 $ 79,200.0 1 LS $ 135,000.0 $ 135,000.0 $45,000.0 $45,000.0 1 LS $45,000.0 $45,000.0 $ 22,000.0 $ 13,400.0 1 LS $ 22,000.0 $ 22,000.0 1 r _ $ 3,745,784.0 $ 2,850,000.0 1 LS $ 3,745,784.0 $ 3,745,784.0 $ 7,200.0 $ 7,200.0 1 LS $ 7,200.0 $ 7,200.0 $ 200,000.0 $ 200,000.0 1 LS $200,000.0 $ 200,000.0 $ 14,000.0 $ 6,600.0 100 SY $ 140 $ 14,000.0 $ 10,000.0 $ 10,000.0 500 SY $ 20 $ 10,000.0 $ 576,000.0 $ 360,000.0 18 EA $32,000.0 $ 576,000.0 $8,874.0 $ 8,874.0 1 EA $8,874.0 1$8,874.0 $ 125,000.0 $44,500.0 1 EA $ 125,000.0 $ 125,000.0 $ 682,500.0 $ 682,500.0 1500 LF $455 $682,500.0 $ 1,794,500.0 $ 1,794,500.0 3700 LF $485 $ 1,794,500.0 $910,000.0 $ 723,800.0 140 LF $6,500.0 $910,000.0 $ 600,000.0 $ 521,600.0 80 LF $7,500.0 $ 600,000.0 $935,000.0 $ 833,000.0 170 LF $5,500.0 $ 935,000.0 $ 1,232,000.0 $ 1,232,000.0 11200 LF $ 110 Es' 232,000.$972,000.0 $ 972,000.0 10800 LF $90 2,000.0 $ 52,000.0 $ 3,508.0 4 EA $ 13,000.0 $ 52,000.0 $43,000.0 $ 12,600.0 1 EA $43,000.0 $43,000.0 $43,000.0 $ 12,600.0 1 EA $43,000.0 $43,000.0 $43,000.0 $ 12,600.0 1 EA $43,000.0 $43,000.0 $43,000.0 $ 13,600.0 1 EA $43,000.0 $43,000.0 $ 23,200.0 $ 23,200.0 4 EA $5,800.0 $ 23,200.0 $ 3,150.0 $ 3,150.0 1 EA $3,150.0 $ 3,150.0 $ 786,250.0 $ 786,250.0 170 LF $4,625.0 1$ 786,250.0 $ 584,800.0 $ 520,800.0 80 LF $7,310.0 $ 584,800.0 $ 722,500.0 $ 722,500.0 170 LF $4,250.0 $722,500.0 $ 245,000.0 $ 245,000.0 1 LS $ 245,000.0 $ 245,000.0 $ 2,712,042.0 $ 2,150,000.0 1 LS $ 2,712,042.0 $ 2,712,042.0 $ 65,000.0 $ 65,000.0 1 LS $ 65,000.0 1$65,000.0 $ 140,000.0 $ 111,000.0 2000 CY $ 70 $ 140,000.0 $ 2,880,000.0 $ 1,168,000.0 16000 SY 1$ 180 $ 2,880,000.0 $ 842,400.0 $ 639,600.0 7800 SY $ 108 $ 842,400.0 $ 226,800.0 $ 174,300.0 2100 SY $ 108 $ 226,800.0 Sunroc Corporation $ 25,313,486.0 0 $ 0 UnitPrice TotalCost ==MM $ 2,755,034.0 $ 2,755,034.0 $ 79,200.0 $79,200.0 $ 295,000.0 $ 295,000.0 $ 13,400.0 $ 13,400.0 $ 2,850,000.0 $ 2,850,000.0 $46,100.0 $46,100.0 $304,824.0 $ 304,824.0 $ 66 $6,600.0 $99 $49,500.0 $ 20,000.0 $360,000.0 $ 15,200.0 $ 15,200.0 $44,500.0 $44,500.0 $ 1,070.0 $ 1,605,000.0 $ 1,070.0 $ 3,959,000.0 $ 5,170.0 $ 723,800.0 $ 6,520.0 $ 521,600.0 $4,900.0 $833,000.0 $ 123 $ 1,377,600.0 $ 106 $ 1,144,800.0 $877 $ 3,508.0 $ 12,600.0 $ 12,600.0 $ 12,600.0 $ 12,600.0 $ 12,600.0 $ 12,600.0 $ 13,600.0 $ 13,600.0 $8,170.0 $ 32,680.0 $ 5,440.0 $ 5,440.0 $4,890.0 $ 831,300.0 $ 6,510.0 $520,800.0 $4,890.0 $ 831,300.0 $ 1,650,000.0 $ 1,650,000.0 $ 2,150,000.0 $ 2,150,000.0 $ 160,000.0 $ 160,000.0 $ 55.5 $ 111,000.0 $ 73 $ 1,168,000.0 $ 82 $ 639,600.0 $ 83 $ 174,300.0 CONTRACT FOR PUBLIC WORKS CONSTRUCTION CAN ADA LIFT STATION & GRAVITY SEWER LINE PROJECT # 10038.f THIS CONTRACT FOR PUBLIC WORKS CONSTRUCTION is made this_ of January 2025, and entered into by and between the City of Meridian,a municipalcorporation organized under the laws of the State of Idaho, hereinafter referred to as "City", 33 East Broadway Avenue, Meridian, Idaho 83642, Dasco of Idaho hereinafter referred to as "Contractor", whose business address is 411 E Karcher Rd. Nampa, ID 83687 and whose Public Works Contractor License # is 009770. INTRODUCTION Whereas, the City has a need for services involving Sewer Lift Station; and WHEREAS, the Contractor is specially trained, experienced and competent to perform and has agreed to provide such services; NOW, THEREFORE, in consideration of the mutual promises, covenants, terms and conditions hereinafter contained, the parties agree as follows: TERMS AND CONDITIONS 1. Scope of Work: 1.1 Contractor shall perform and furnish to the City upon execution of this Contract and receipt of the City's written notice to proceed, all services and work, and comply in all respects, as specified in the document titled "Scope of Work" a copy of which is attached hereto as Exhibit "A" and incorporated herein by this reference, together with any amendments that may be agreed to in writing by the parties. 1.2 All documents, drawings and written work product prepared or produced by the Contractor under this Agreement, including without limitation electronic data files, are the property of the Contractor; provided, however, the City shall have the right to reproduce, publish and use all such work, or any part thereof, in any manner and for any purposes whatsoever and to authorize others to do so. If any such work is copyrightable, the Contractor may copyright the same, except that, as to any work which is copyrighted by the Contractor, the City reserves a royalty-free, non-exclusive, and irrevocable license to reproduce, publish and use such work, or any part thereof, and to authorize others to do so. 1.3 The Contractor shall provide services and work under this Agreement consistent with the requirements and standards established by applicable federal, state and City laws, ordinances, regulations and resolutions. The Contractor Can Ada Lift Sation&Gravity Sewer Line page 1 of 15 Project#10038.f represents and warrants that it will perform its work in accordance with generally accepted industry standards and practices for the profession or professions that are used in performance of this Agreement and that are in effect at the time of performance of this Agreement. Except for that representation and any representations made or contained in any proposal submitted by the Contractor and any reports or opinions prepared or issued as part of the work performed by the Contractor under this Agreement,Contractor makes no other warranties, either express or implied, as part of this Agreement. 1.4 Services and work provided by the Contractor at the City's request under this Agreement will be performed in a timely manner in accordance with a Schedule of Work, which the parties hereto shall agree to. The Schedule of Work may be revised from time to time upon mutual written consent of the parties. 2. Consideration 2.1 The Contractor shall be compensated on a Not-to-Exceed basis as provided in Exhibit B "Payment Schedule" attached hereto and by reference made a part hereof for the Not-To-Exceed amount of$22,470,000.00. The contract will cross two fiscal budget years (FY25 and FY26); FY25 shall not exceed $16,000,000.00. FY26 shall not exceed $6,470,000.00. Each fiscal year begins October 1st through September 30tn 2.2 The Contractor shall provide the City with a monthly statement and supporting invoices, as the work warrants, of fees earned and costs incurred for services provided during the billing period, which the City will pay within 30 days of receipt of a correct invoice and approval by the City. The City will not withhold any Federal or State income taxes or Social Security Tax from any payment made by City to Contractor under the terms and conditions of this Agreement. Payment of all taxes and other assessments on such sums is the sole responsibility of Contractor. 2.3 Except as expressly provided in this Agreement, Contractor shall not be entitled to receive from the City any additional consideration, compensation, salary, wages, or other type of remuneration for services rendered under this Agreement including, but not limited to, meals, lodging, transportation,drawings, renderings or mockups or material escalations. Specifically, Contractor shall not be entitled by virtue of this Agreement to consideration in the form of overtime, health insurance benefits, retirement benefits, paid holidays or other paid leaves of absence of any type or kind whatsoever. 3. Term: 3.1 This agreement shall become effective upon execution by both parties, and shall expire upon (a) completion of the agreed upon work, (b) or unless sooner terminated as provided in Sections 3.2, 3.3, and Section 4 below or unless some other method or time of termination is listed in Exhibit A. Can Ada Lift Sation&Gravity Sewer Line page 2 of 15 Project#10038.f 3.2 Should Contractor default in the performance of this Agreement or materially breach any of its provisions, City, at City's option, may terminate this Agreement by giving written notification to Contractor. 3.3 Should City fail to timely remit payment to Contractor as provided in Section 28, Contractor, at the Contractor's option, may terminate this Agreement if the failure is not remedied by the City within thirty (30) days from the date payment is due. 4. Liquidated Damages: Substantial Completion shall be accomplished within 608 (six hundred eight) calendar days from Notice to Proceed. This project shall be considered Substantially Complete when the Owner has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, and only minor incidental work, corrections or repairs remain for the physical completion of the total contract. Contractor shall be liable to the City for any delay beyond this time period in the amount of $500.00 (five hundred dollars) per calendar day. Such payment shall be construed to be liquidated damages by the Contractor in lieu of any claim or damage because of such delay and not be construed as a penalty. Upon receipt of a Notice to Proceed, the Contractor shall have 669 (six hundred sixty-nine) calendar days to complete the work as described herein. Contractor shall beliable to the City for any delay beyond this time period in the amount of $500.00 (five hundred dollars) per calendar day. Such payment shall be construed tobe liquidated damages by the Contractor in lieu of any claim or damage because ofsuch delay and not be construed as a penalty. See Milestones listed in the Payment Schedule for Substantial Completion. 5. Termination: 5.1 If, through any cause, Contractor, its officers, employees, or agents fails to fulfill in a timely and proper manner its obligations under this Agreement, violates any of the covenants, agreements, or stipulations of this Agreement, falsifies any record or document required to be prepared under this agreement, engages in fraud, dishonesty, or any other act of misconduct in the performance of this contract, or if City determines that termination of this Agreement is in the best interest of City, the City shall thereupon have the right to terminate thisAgreement by giving written notice to Contractor of such termination and specifying the effective date thereof at least fifteen (15) days before the effectivedate of such termination. Contractor may terminate this agreement at any time by giving at least sixty (60) days' notice to City. In the event of any termination of this Agreement, all finished or unfinished documents, data, and reports prepared by Contractor under this Agreement shall, at the option of the City, become its property, and Contractor shall be entitled to receive just and equitable compensation for any work satisfactorily complete hereunder. Can Ada Lift Sation&Gravity Sewer Line page 3 of 15 Project#10038.f 5.2 Notwithstanding the above, Contractor shall not be relieved of liability tothe City for damages sustained by the City by virtue of any breach of this Agreement by Contractor, and the City may withhold any payments to Contractor for the purposes of set-off until such time as the exact amount ofdamages due the City from Contractor is determined. This provision shallsurvive the termination of this agreement and shall not relieve Contractor of its liability to the City for damages. 6. Independent Contractor: 6.1 In all matters pertaining to this agreement, Contractor shall be acting as an independent Contractor, and neither Contractor nor any officer, employeeor agent of Contractor will be deemed an employee of City. Except as expressly provided in Exhibit A, Contractor has no authority or responsibility to exercise any rights or power vested in the City and therefore has no authority to bind or incur any obligation on behalf of the City. The selection and designation ofthe personnel of the City in the performance of this agreement shall be made bythe City. 6.2 Contractor, its agents, officers, and employees are and at all times during the term of this Agreement shall represent and conduct themselves as independent Contractors and not as employees of the City. 6.3 Contractor shall determine the method, details and means of performing the work and services to be provided by Contractor under this Agreement. Contractor shall be responsible to City only for the requirements and results specified in this Agreement and, except as expressly provided in this Agreement, shall not be subjected to City's control with respect to the physical action or activities of Contractor in fulfillment of this Agreement. If in the performance of this Agreement any third persons are employed by Contractor, such persons shall be entirely and exclusively under the direction and supervision and control of the Contractor. 7. SubContractors: Contractor shall require that all of its sub-Contractors be licensed per State of Idaho Statute # 54-1901 & 54-1902. 8. Removal of Unsatisfactory Employees: The Contractor shall only furnish employees who are competent and skilled for work under this contract. If, in the opinion of the City, an employee of the Contractor is incompetent or disorderly, refuses to perform in accordance with the terms and conditions of the contract, threatens or uses abusive language while on City property, or is otherwise unsatisfactory, that employee shall be removed from all work under this contract. Can Ada Lift Sation&Gravity Sewer Line page 4 of 15 Project#10038.f 9. Indemnification and Insurance: 9.1 Contractor shall indemnify and save and hold harmless City and it's selected officials, officers,employees, agents, and volunteers from and for any and all losses, claims, actions,judgments for damages, or injury to persons or property and losses and expenses and other costs including litigation costs and attorney's fees, arising out of, resulting from, or in connection with the performance of this Agreement by the Contractor, its servants, agents, officers, employees, guests, and business invitees, and not caused by or arising out of the tortious conduct of City or its employees. Contractor shall maintain, and specificallyagrees that it will maintain, throughout the term of this Agreement, liabilityinsurance, in which the City shall be named an additional insured in the minimum amounts as follow: General Liability One Million Dollars ($1,000,000) per incidentor occurrence, Automobile Liability Insurance One Million Dollars ($1,000,000) per incident or occurrence and Workers' Compensation Insurance, in the statutory limits as required by law. The limits of insurance shall not be deemed a limitationof the covenants to indemnify and save and hold harmless City; and if City becomes liable for an amount in excess of the insurance limits, herein provided, Contractor covenants and agrees to indemnify and save and hold harmlessCity from and for all such losses, claims, actions, or judgments for damages or injury to persons or property and other costs, including litigation costs and attorneys' fees, arising out of, resulting from , or in connection with the performance of this Agreement by the Contractor or Contractor's officers, employs, agents, representatives or subcontractors and resulting in or attributable topersonal injury, death, or damage or destruction to tangible or intangible property,including use of. Contractor shall provide City with a Certificate of Insurance, or other proof of insurance evidencing Contractor's compliance with the requirements of this paragraph and file such proof of insurance with the City at least ten (10) days prior to the date Contractor begins performance of its obligations under this Agreement. In the event the insurance minimums are changed, Contractor shall immediately submit proof of compliance with the changed limits. Evidence of all insurance shall be submitted to the City Purchasing Agent with a copy to Meridian City Accounting, 33 East Broadway Avenue, Meridian, Idaho 83642. 9.2 Insurance is to be placed with an Idaho admitted insurer with a Best's rating of no less than A-. 9.3 Any deductibles, self-insured retention, or named insureds must be declared in writing and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles, self-insured retentions or named insureds; or the Contractor shall provide a bond, cash or letter of credit guaranteeing payment of losses and related investigations, claim administration and defense expenses. 9.4 To the extent of the indemnity in this contract, Contractor's Insurance coverage shall be primary insurance regarding the City's elected officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City or the City's elected officers, officials, employees and volunteers shall be excess of Can Ada Lift Sation&Gravity Sewer Line page 5 of 15 Project#10038.f the Contractor's insurance and shall not contribute with Contractor's insurance except as to the extent of City's negligence. 9.5 The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 9.6 All insurance coverages for subcontractors shall be subject to all of the insurance and indemnity requirements stated herein. 9.7 The limits of insurance described herein shall not limit the liability of the Contractor and Contractor's agents, representatives, employees or subcontractors. 10. Time is of the Essence: The parties hereto acknowledge and agree that time is strictly of the essence with respect to each and every term, condition and provision hereof, and that the failure to timely perform any of the obligations hereunder shall constitute a breach of, and a default under, this Agreement by the party so failing to perform. 11. Bonds: Payment and Performance Bonds are required on all Public Works Improvement Projects per the ISPWC and the City of Meridian Supplemental Specifications & Drawings to the ISPWC, which by this reference are made a part hereof. Contractor is required to furnish faithful performance and payment bonds in the amount of 100% of the contract price issued by surety licensed to do business in the State of Idaho with a Best's rating of no less than A-. In the event that the contract is subsequently terminated for failure to perform, the Contractor and/or surety will be liable and assessed for any and all costs for the re-procurement of the contract services. 12. Warranty: All construction and equipment provided under this agreement shall be warranted for 2 years from the date of the City of Meridian acceptance per the ISPWC and the Meridian Supplemental Specifications & Drawings to the ISPWC and any modifications, which by this reference are made a part hereof. All items found to be defective during a warranty inspection and subsequently corrected will require an additional two (2) year warranty from the date of City's acceptance of the corrected work. 13. Changes: The City may, from time to time, request changes in the Scope of Work to be performed hereunder. Such changes, including any increase or decrease in the amount of Contractor's compensation, which are mutually agreed upon by and Can Ada Lift Sation 8,Gravity Sewer Line page 6 of 15 Project#10038.f between the City and Contractor, shall be incorporated in written amendments which shall be executed with the same formalities as this Agreement. 14. Taxes: The City of Meridian is exempt from Federal and State taxes and will execute the required exemption certificates for items purchased and used by the City. Items purchased by the City and used by a Contractor are subject to Use Tax. All other taxes are the responsibility of the Contractor and are to be included in the Contractor's Bid pricing. 15. Meridian Stormwater Specifications: All construction projects require either a Storm Water Pollution Prevention Plan (SWPPP) or an erosion sediment control plan (ESCP) as specified in the City of Meridian Construction Stormwater Management Program (CSWMP) manual. The CSWMP manual containing the procedures and guidelines can be found at this address: http://www.meridianCity.org/environmental.aspx?id=13618. Contractor shall retain all stormwater and erosion control documentation generated on site during construction including the SWPPP manual, field inspections and amendments. Prior to final acceptance of the job by the City the Contractor shall return the field SWPPP manual and field inspection documents to the City for review. A completed Contractor Request to File Project N.O.T. with the EPA form shall be provided to the City with the documents. These documents shall be retained, reviewed and approved by the City prior to final acceptance of the project. 16. ACHD: Contractor shall be responsible for coordinating with the City to obtain appropriate ACHD permit(s) and will reimburse the City for fees, fines, or penalties City incurs due to Contractor's violation of any ACHD policy. City shall certify to ACHD that Contractor is authorized to obtain a Temporary Highway and Right-of-Way Use Permit from ACHD on City's behalf. The parties acknowledge and agree that the scope of the agency granted by such certification is limited to, and conterminous with, the term and scope of this Agreement. 17. Reports and Information: 17.1 At such times and in such forms as the City may require, there shall be furnished to the City such statements, records, reports, data and information as the City may request pertaining to matters covered by this Agreement. 17.2 Contractor shall maintain all writings, documents and records prepared or compiled in connection with the performance of this Agreement for a minimum of four (4) years from the termination or completion of this or Agreement. This includes any handwriting, typewriting, printing, photostatic, photographic and every other means of recording upon any tangible thing, any form of communication or Can Ada Lift Sation&Gravity Sewer Line page 7 of 15 Project#10038.f representation including letters, words, pictures, sounds or symbols or any combination thereof. 18. Audits and Inspections: At any time during normal business hours and as often as the City may deem necessary, there shall be made available to the City for examination all of Contractor's records with respect to all matters covered by this Agreement. Contractor shall permit the City to audit, examine, and make excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel,conditions of employment and other datarelating to all matters covered by this Agreement. 19. Publication, Reproduction and Use of Material: No material produced in whole or in part under this Agreement shall be subject to copyright in the United States or in any other country. The City shall have unrestricted authority to publish, disclose and otherwise use, in whole or in part, any reports, data or other materials prepared under this Agreement. 20. Equal Employment Opportunity: In performing the work herein, Contractor agrees to comply with the provisions of Title VI and VII of the Civil Rights Act, Revenue Sharing Act Title 31, U.S. Code Section 2176. Specifically, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, color, religion,sex, national origin, age, political affiliation, marital status, or handicap. Contractor will take affirmative action during employment or training to ensure that employees are treated without regard to race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap. In performing the Work required herein, Contractor shall not unlawfully discriminate in violation of any federal, state orlocal law, rule or regulation against any person on the basis of race, color, religion,sex, national origin or ancestry, age or disability. 21. Employment of Bona Fide Idaho Residents: Contractor must comply with Idaho State Statute 44-1002 which states that the Contractor employ ninety-five percent (95%) bona fide Idaho residents as employees on any job under any such contract except where under such contracts fifty (50) or less persons are employed, the Contractor may employ ten percent (10%) nonresidents, provided, however, in all cases employers must give preference to the employment of bona fide residents in the performance of said work. 22. Advice of Attorney: Each party warrants and represents that in executing this Agreement. It has received independent legal advice from its attorney's or the opportunity to seek such Can Ada Lift Sation&Gravity Sewer Line page 8 of 15 Project#10038.f advice. 23. Attorney Fees: Should any litigation be commenced between the parties hereto concerning this Agreement, the prevailing party shall be entitled, in addition to any other relief as may be granted, to court costs and reasonable attorneys' fees as determined by a Court of competent jurisdiction. This provision shall be deemed to be a separate contract between the parties and shall survive any default, termination or forfeiture of this Agreement. 24. Construction and Severability: If any part of this Agreement is held to be invalid or unenforceable, such holding will not affect the validity or enforceability of any other part of this Agreement so long as the remainder of the Agreement is reasonably capable of completion. 25. Waiver of Default: Waiver of default by either party to this Agreement shall not be deemed to be waiver of any subsequent default. Waiver or breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is modified as provided above. 26. Entire Agreement: This Agreement contains the entire agreement of the parties and supersedes any and all other agreements or understandings, oral of written,whether previous to the execution hereof or contemporaneous herewith. 27. Assignment: It is expressly agreed and understood by the parties hereto, that Contractor shall not have the right to assign, transfer, hypothecate or sell any of its rights underthis Agreement except upon the prior express written consent of City. 28. Payment Request: Payment requests shall be submitted to City of Meridian through the City's project management software. The Project Manager will compare the invoice against the Payment Schedule in the Agreement for compliance. Upon approval that the work has been done and is in compliance with the Agreement, the Project Manager will approve the pay request for processing. City of Meridian payment terms are Net 30 from the date City receives a correct invoice. Final payment will not be released until the City has received a tax release from the Tax Commission. Retainage of Can Ada Lift Sation&Gravity Sewer Line page 9 of 15 Project 410038.f five percent (5%) of the current contract value will be withheld from the final pay application(s) until final completion has been met and releases from both the Idaho Tax Commission and Surety have been received by the City. 29. Cleanup: Contractor shall keep the worksite clean and free from debris. At completion of work and prior to requesting final inspection, the Contractor shall remove all traces of waste materials and debris resulting from the work. Final payment will not be made if cleanup has not been performed. 30. Order of Precedence: The order or precedence shall be the contract agreement, the Invitation to Bid document, then the winning bidders submitted bid document. 31. Compliance with Laws: In performing the scope of work required hereunder, Contractor shall comply with all applicable laws, ordinances, and codes of Federal, State, and local governments. This Agreement shall be governed by and construed and enforced in accordance with the laws of the State of Idaho, and the ordinances of the City of Meridian. Certifications. Pursuant to Idaho Code §§ 67-2359 and 67-2346, Contractor hereby certifies: A. That Contractor is not currently owned or operated by the government of China and will not, for the duration of this Contract, be owned or operated by the government of China. B. That Contractor is not currently engaged in, and will not for the duration of the Contract engage in, a boycott of goods or services from Israel or territories under its control. 32. Notices: Any and all notices required to be given by either of the parties hereto, unless otherwise stated in this agreement, shall be in writing and be deemed communicated when mailed in the United States mail, certified, return receipt requested, addressed as follows: Q; Contractor: City of Meridian Dasco of Idaho Procurement Manager Attn: Ryan Brunner 33 E Broadway Ave. 411 E Karcher Rd. Can Ada Lift Sation&Gravity Sewer Line page 10 of 15 Project#10038.f Meridian, ID 83642 Nampa, ID 83687 208-489-0417 Phone: 907-406-5619 Email: Ryan.Brunner@dascoidaho.com Idaho Public Works License#: 009770 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 33. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. CITY OF MERIDIAN: DASCO OF IDAHO: BY: IAI�l BY: d6 4"VC KEI WATTS, Procurement Manger Ben Hichcock, President DATED: 1/22/2025 DATED: '9k-Zf32�, Approved by Council Date: (if needed) 1/21/2025 Project Manager David Briggs Can Ada Lift Sation&Gravity Sewer Line page 11 of 15 Project#10038.f Meridian, ID 83642 Nampa, ID 83687 208-489-0417 Phone: 907-406-5619 Email: Ryan.Brunner@dascoidaho.com Idaho Public Works License #: 009770 Either party may change their address for the purpose of this paragraph by giving written notice of such change to the other in the manner herein provided. 33. Approval Required: This Agreement shall not become effective or binding until approved by the City of Meridian. CITY OF MERIDIAN: DASCO OF IDAHO: BY: -- BY: KEITH WATTS, Procurement Manger Ben Hichcock, President DATED: DATED: Approved by Council Date: (if needed) 1/21/2025 Project Manager David Briggs Can Ada Lift Sation&Gravity Sewer Line page 11 of 15 Project#10038.f EXHIBIT A SCOPE OF WORK REFER TO INVITATION TO BID PW-2505-10038.f ALL ADDENDUMS, ATTACHMENTS, AND EXHIBITS included in the Invitation to Bid Package # PW-2505-10038.f are by this reference made a part hereof. SPECIFICATIONS / SCOPE OF WORK All construction work shall be done in accordance with the current version of the Idaho Standards for Public Works Construction (ISPWC), the current version of the City of Meridian Supplemental Specifications to the ISPWC (and any Addendums). See separate attached documents: • Technical Specifications dated September 2024 by City of Meridian (870 pages) • Can Ada Lift Station & Gravity Line Drawings dated September 2024 by Consor (125 pages) Can Ada Lift Sation$Gravity Sewer Line page 12 of 15 Project#10038.f EXHIBIT B MILESTONE / PAYMENT SCHEDULE A. Total and complete compensation for this Agreement shall not exceed $22,470,000.00. MILESTONE DATES/SCHEDULE Milestone 1 Substantial Completion 608 Days from Notice to Proceed Milestone 2 �Final Completion 669 Days from Notice to Proceed PRICING SCHEDULE Contract includes furnishing all labor, materials, equipment and incidentals as required for the PROJECT NAME Project per ITB BID #PW-2505-10038.f. NOT-TO-EXCEED AMOUNT.............................................$22,470,000.00 Contract is a not to exceed amount. Line-item pricing below will be used for invoice verification and any additional increases or decreases in work requested by City.The City will pay the Contractor based on actual quantities of each item of work in accordance with the contract documents. Contract Pricing Schedule Item No. Description Quantity Unit Unit I Price OPTION 1 — OPEN CUT GENERAL 10122 20 1.2 A 1 Mobilization, Bonds, Insurance and Demobilization 1 LS $ 1,000,000. 0122 20 1.2 A 2 Erosion and Sediment Control 1 LS $ 135,000.d 0122 20 1.2 A 3 Traffic Control 1 LS $4S,000.d P1 22 20 1.2 A 4 lPotholing 1 1 LS 1 $ 22,000. CAN ADA LIFT STATION '01 22 20 1.2 B 1 (Can Ada Lift Station 1 LS $ 3,745,784.0 I01 22 20 1.2 B 2 (Shoring 1 LS $7,200.0 '01 22 20 1.2 B 3 IDewatering- Lift Station 1 LS $ 200,000.0 1 GRAVITY & FORCEMAIN PIPELINES - OPEN CUT I p1 22 20 1.2 C 1 ravel Surface Restoration 100 SY $ 146 10122 20 1.2 C 2 Native/Sod/Landscape Surface (Restoration 500 SY $2J Can Ada Lift Sation&Gravity Sewer Line page 13 of 15 Project#10038.f 0122 20 1.2 C 3 160"Standard Sanitary Sewer Manhole 18 EA $32,000.10 0122 20 1.2 C 4 k8"Standard Sanitary Sewer Manhole 1 EA $8,874. 122 20 1.2 C 5 60" Vortex Sanitary Sewer Manhole 1 EA $125,000. 0122 20 1.2 C 6 a 15" Gravity Sewer-Open Cut 1500 LF $45 P1 22 20 1.2 C 7 a118" Gravity Sewer-Open Cut 1 3700 LF $485 122 20 1.2 C 9 lTrenchless Installation 36"Steel (Casing (Gravity) -Five Mile Creek STA 1+80 140 LF $6,500. 122 20 1.2 C 9 rrenchless Installation 36"Steel Casing(Gravity) -William's Pipeline-STA 30+00 80 LF $7,500. 0122 20 1.2 C 9 Trenchless Installation 36"Steel Casing(Gravity) -Phyllis Canal- TA 46+20 170 LF $5,500. 1 22 20 1.2 C 10 14" HDPE DR17 Pipe-Open Trench 11200 LF $ 11 1 22 20 1.2 C 11 10" HDPE DR17 Pipe-Open French 10800 LF $9 10122 20 1.2 C 12�hrust Wall 4 EA $13,000. 0122 20 1.2 C 13 IDual Air/Vac Valve-Five Mile Creek 1 EA $43,000.01 b1 22 20 1.2 C 13 Dual Air/Vac Valve-William's Pipeline 1 EA $43,000. P122 20 1.2 C 13 Dual Air/Vac Valve- Phyllis Canal 1 EA $43,000. r122 20 1.2 C 13 Dual Air/Vac Valve- McMillan/McDermott I EA 1 $43,000. P1 22 20 1.2 C 14 14" Plug Valve 4 EA $5,800. �)1 22 201.2 C 15 10" Plug Valve 1 EA $3,150. 0122 20 1.2 C 9 f Trenchless Installation 36"Steel Casing (Pressure)- Five Mile reek-STA 1+80 170 LF $4,625. b1 22 20 1.2 C 9 �Trenchless Installation 36"Steel (Casing (Pressure) -William's Pipeline-STA 30+00 80 LF $7,310. 122 20 1.2 C 9 rrenchless Installation 36"Steel !Casing(Pressure)-Phyllis Canal- ISTA 46+20 170 LF $4,250. 10122 20 1.2 C 16 horing 1 LS $245,000. b1 22 20 1.2 C 17 IDewatering-Gravity 1 LS $2,712,042. 1 22 20 1.2 C 18 Dewatering-Forcemain 1 LS $65,000. 0122 20 1.2 C 19Trench/Soft Spot Stabilization (USED ONLY WITH PRIOR APPROVAL FROM OWNER) 2000 CY $7 +a 122 201.2 C 20 lAsphalt Surface Restoration- $ 18 1McMillan Rd-Can Ada to Star 16000 SY Can Ada Lift Sation&Gravity Sewer Line page 14 of 15 Project#10038.f Road - Full Road Pavement Restoration 0122 20 1.2 C 21 AsphaltSurface Restoration - McMillan Rd -Star Road to McDermont-Single Lane Pavement Restoration 7800 SY $ 10 122 20 1.2 C 22 Asphalt Surface Restoration - McDermont Rd -Single Lane Pavement Restoration 2100 SY $10