Loading...
HomeMy WebLinkAboutCC - Applicant Email and Presentation Chris Johnson From:Bryan Appleby <Bryan.Appleby@deainc.com> Sent:Monday, January 20, 2025 11:05 AM To:Sonya Allen Cc:Kason Wedel; Doug Connelly; Clerks Comment; Bill Parsons Subject:RE: Stonehill Crossing Subdivision No. 1 (FP-2024-0020) -- PowerPoint Attachments:Stonehill Church CC Presentation_2025.01.21_rev1.pptx External Sender - Please use caution with links or attachments. Sonya, On 1/14, I sent you seven PowerPoint slides for tomorrow night’s Stonehill Crossing Subdivision No. 1 plat hearing. We have since received feedback from the owner of the existing residence on the proposed Lot 2, Block 1 (Kent and Donna Mills) regarding the cross-access easement for access to their property. They desire for the proposed easement to be “permanent” rather than “temporary” for the reasons stated further below. As the Engineer of Record, I am in full agreement with these reasons. Please see attached U PowerPoint slides (new Slide 8) along with the proposed wording changes to Condition #10. Current Condition #10 The ingress-egress easement depicted on Lot 1, Block 1 for the benefit of Lot 2, Block 1 shall be temporary until such time as an alternate access is available for Lot 2 with development of the adjacent property; at such time, the access easement shall terminate and the driveway on Lot 2 via Lot 1 shall be removed. Proposed Revision to Condition #10 The ingress-egress easement depicted on Lot 1, Block 1 for the benefit of Lot 2, Block 1 shall be permanent due to the following considerations: (1) functionality of access via Lot 1, Block 1 private driveway (i.e., private church driveway at location of driveway access to Lot 2, Block 1 will appear and function much like a public street); (2) driveway access from the north is more conducive to location of existing garage and driveway located on Lot 2, Block 1; (3) the topography on east side of Lot 2, Block 1 (approximately 6.5 feet of elevation to overcome in a short distance ~ 8% grade); and (4) desire of owner of Lot 2, Block 1 for permanent access location via a driveway from the north. Please give thoughtful consideration to this request during the presentation to Council. Feel free to reach out with any comments or questions. Thank you for all of your assistance along the way! Bryan Appleby, PE | Senior Land Development Project Engineer David Evans and Associates, Inc. 9175 W Black Eagle Drive | Boise, ID 83709 | www.deainc.com d: 986.210.8117 | c: 208.484.3747 | Cisco: 48117 | bryan.appleby@deainc.com ENERGY | LAND DEVELOPMENT | MARINE SERVICES | SURVEYING AND GEOMATICS | TRANSPORTATION | WATER AND ENVIRONMENT 1 To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. This email and any attachments transmitted with it are the property of David Evans and Associates, Inc. and may contain information that is confidential or otherwise protected from disclosure. The information is intended solely for the use of the individual(s) to whom it is addressed. Unauthorized use, copying, distribution or disclosure of any of it is strictly prohibited. We assume no responsibility to persons other than the intended, named recipient(s) and do not accept any liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately and confirm that the message and any attachments and copies have been destroyed and deleted. TTTTT ooooo hhhhh eeeee lllll From: Bryan Appleby Sent: Tuesday, January 14, 2025 8:25 AM To: Sonya Allen <sallen@meridiancity.org> Cc: Kason Wedel <kason@stonehill.church>; Doug Connelly <doug@stonehill.church>; Clerks Comment <comment@meridiancity.org>; Bill Parsons <bparsons@meridiancity.org> Subject: Stonehill Crossing Subdivision No. 1 (FP-2024-0020) -- PowerPoint Sonya, We assembled seven (7) slides for the Stonehill Crossing Subdivision No. 1 plat hearing on 1/21. Please see attached PowerPoint file. Feel free to show any or all of these slides during your discussion. We don’t intend to present to Council but will be available to answer any questions. We are agreeable to the Conditions of Approval. Bryan Appleby, PE | Senior Land Development Project Engineer David Evans and Associates, Inc. 9175 W Black Eagle Drive | Boise, ID 83709 | www.deainc.com d: 986.210.8117 | c: 208.484.3747 | Cisco: 48117 | bryan.appleby@deainc.com ENERGY | LAND DEVELOPMENT | MARINE SERVICES | SURVEYING AND GEOMATICS | TRANSPORTATION | WATER AND ENVIRONMENT To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. This email and any attachments transmitted with it are the property of David Evans and Associates, Inc. and may contain information that is confidential or otherwise protected from disclosure. The information is intended solely for the use of the individual(s) to whom it is addressed. Unauthorized use, copying, distribution or disclosure of any of it is strictly prohibited. We assume no responsibility to persons other than the intended, named recipient(s) and do not accept any liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately and confirm that the message and any attachments and copies have been destroyed and deleted. TTTTT ooooo hhhhh eeeee lllll 2