Loading...
HomeMy WebLinkAbout2024-08-06 Boise Project Board Of Control Charlene Way From:Tom Ritthaler <tritthaler@boiseproject.org> Sent:Tuesday, August 6, 2024 8:58 AM To:Kobe Zimmerman; Greg Curtis - Nampa & Meridian Irrigation (gcurtis@nmid.org) Subject:RE: 24-057 Koby, The only facility that Boise Project has is in the south east corner of the property and then it all becomes private after that. The easement for the concrete structure in that corner is 20 feet in all directions from that structure. The Boise Project does not approve landscaping (other than gravel) within its easements, as this will certainly increase our cost of maintenance. All easements must remain a flat drivable surface. No variances will be granted. Fencing, gates, pathways, and pressurized irrigation lines (as may be required) must be constructed just o? the canal easement, to ensure public safety and prevent encroachments. No variances will be granted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. Thanks, Tom Thomas B Ritthaler Assistant Project Manager Boise Project Board of Control 2465 Overland Rd. Boise, Idaho 83705 208-344-1141 From: Kobe Zimmerman <kzimmerman@kmengllp.com> Sent: Tuesday, August 6, 2024 8:49 AM To: Greg Curtis - Nampa & Meridian Irrigation (gcurtis@nmid.org) <gcurtis@nmid.org> Cc: Tom Ritthaler <tritthaler@boiseproject.org> Subject: 24-057 Good morning, Gentlemen! I hope all is well with you both! 1 Below (also see attached) is the subject parcel we are surveying; irrigation facilities were found onsite and I was curious as to the easement widths and requirements. Thank you so much! ----------------------------------- Kobe Zimmerman 2 Project Surveyor KM ENGINEERING 5725 North Discovery Way | Boise, ID 83713 208.639.6939 3