Loading...
HomeMy WebLinkAboutPZ - Creason Lateral Pathway Legal Description RVSD-10-15-24 JHMH engineering Exhibit `A' Lennon Pointe Subdivision Creason Lateral Pedestrian Pathway Easement Legal Description A pathway easement situate in the North 112 of the West 112 of Government Lot 4 in Section 1, Township 3 North, Range 1 West, Boise Meridian, City of Meridian, Ada County, Idaho, and more particularly described as follows: COMMENCING at the Northwest corner of Section 1 as described in Corner Record Instrument No. 109109699, from which the West 1/4 corner as described in Corner Record Instrument No. 108044955 bears, South 00°01'03" East, 2699.19 feet; thence South 00°01'03" East, 683.16 feet to the southerly boundary of the North 1/2 of the West 1/2 of Government Lot 4; thence along said boundary, South 88°59'01" East, 73.98 feet to the easterly right-of-way for N. Linder Road monumented by a 5/8-inch bar with cap PLS11463; thence continuing along said boundary, South 88°59'01" East, 86.57 feet to the westerly boundary of the Pathway easement, the northerly boundary of an existing pathway easement recorded as Instrument No. 109004708 and the POINT OF BEGINNING; Then along said westerly boundary the following ten (8) courses and distances: Thence North 20°26'27" West, 3.17 feet; Thence North 08°25'32" West, 110.67 feet; Thence along the arc of a curve to the left 18.75 feet, having a radius of 38.00 feet, a central angle of 28°15'59", and a chord bearing North 22°33'31" West, 18.56 feet; Thence North 36°41'31" West, 67.38 feet; Thence along the arc of a curve to the right 14.86 feet, having a radius of 52.00 feet, a central angle of 16°22'05", and a chord bearing North 28°30'29" West, 14.80 feet; Thence North 20°19'26" West, 44.30 feet; Thence along the arc of a curve to the right 7.10 feet, having a radius of 52.00 feet, a central angle of 07°49'14", and a chord bearing North 16°24'49" West, 7.09 feet; Thence along the arc of a non-tangent curve to the left 13.64 feet, having a radius of 49.25 feet, a central angle of 15°52'01", and a chord bearing North 88°15'20" West, 13.60 feet to the easterly right of way for N. Linder Road; Thence along said right of way, North 00°01'03" West, 14.06 feet; 680 S. Progress Ave., Suite #213 • Meridian, Idaho 83642 • Tel: 208-342-7957 • Web: hmh-Ilc.com Equal Opportunity Employer Then along said westerly boundary the following three (3) courses and distances: Thence along the arc of a non-tangent curve to the right 12.43 feet, having a radius of 63.25 feet, a central angle of 11°15'44", and a chord bearing South 89°11'18" East, 12.41 feet; Thence North 01°17'03" East, 151.63 feet; Thence along the arc of a non-tangent curve to the left 99.89 feet, having a radius of 354.05 feet, a central angle of 16°09'53", and a chord bearing North 09°10'55" West, 99.56 feet to the easterly right of way for N. Linder Road; Thence along said right of way, North 00°01'03" West, 40.45 feet to the easterly boundary of the Pathway easement; Then along said easterly boundary the following eleven (8) courses and distances: Thence along the arc of a non-tangent curve to the right 173.14 feet, having a radius of 368.47 feet, a central angle of 26°55'22", and a chord bearing South 09°48'13" East, 171.55 feet; Thence South 01°16'36" West, 123.50 feet; Thence along the arc of a non-tangent curve to the left 14.33 feet, having a radius of 38.00 feet, a central angle of 21°36'24", and a chord bearing South 09°31'14" East, 14.25 feet; Thence South 20°19'26" East, 44.30 feet; Thence along the arc of a curve to the left 10.86 feet, having a radius of 38.00 feet, a central angle of 16°22'05", and a chord bearing South 28°30'28" East, 10.82 feet; Thence South 36°41'31" East, 67.38 feet; Thence along the arc of a curve to the right 25.65 feet, having a radius of 52.00 feet, a central angle of 28°15'59", and a chord bearing South 22°33'32" East, 25.39 feet; Thence South 08°25'32" East, 115.99 feet to the southerly boundary of the North 1/2 of the West 1/2 of Government Lot 4; Thence along said boundary, North 88°59'01" West, 13.52 feet to the POINT OF BEGINNING. Containing 7,945 square feet more or less The sidelines of said easement are two feet offset with the constructed sidewalk pathway which serves as a monument for this description. Prepared by: Ronald M. Hodge, PLS Survey Department Manager o�P� LAND Q G Of O /f 5 �i0-15-2024 p f'pN9TF 0 F 4� D M NO RMH:bf 680 S. Progress Ave., Suite #213 • Meridian, Idaho 83642 • Tel: 208-342-7957 • Web: hmh-Ilc.com Equal Opportunity Employer 35 36 Ustick Rd EXHIBIT B 2 1 CREASON LATERAL PATHWAY EASEMENT o c � �C E rn o � o � U C O U O E E Of U U LEGEND o 30 60 Plat Line SCALE: 1"= 60' Riw Right—of—Way Line _ Section Line — — — — — — — — Kellogg Drain Easement Line — — — — — — — — Creason Lateral Easement Line Lot Line Record Plat Line Suvery Monuments Pathway Area 05 Lot Number M � O co L O J Z / O O \ (0 I \ N \ W I \ ih \ O \ O \0 fn O \\ LAND \ \\ o mp N 0_ 8 5 c �O \ \ s i0-15-2024 p �Z — — \ OF O�� \ \ \ � M. NO 73.98' 0 8 68' HMH ENGINEERING S88°59'01" (208) 342-7957 \ Point of Beginning CR 108044955 ` �. Sheet 1 of 5 Lennon Pointe Exhibits.dwg EXHIBIT B CREASON LATERAL PATHWAY EASEMENT �G �C SHEET 3 MATCH LINE \ w 0 5 10 \ M M SCALE: 1"= 10' O N N 00 0 Z � Z � \ O � W U � LAND rfR r5% 85 5 \ �10-15-2024 p �0' F 0 F L1 4 D M N� L8 Sheet 2 of 5 HMH ENGINEERING Lennon Pointe Exhibits.dwg (208) 342-7957 EXHIBIT B CREASON LATERAL SHEET4 PATHWAY EASEMENT MATCH LINE A �G C J n \co 0 c4 w SCALE: 1"= 30' \mow 10 0 � oelry J Z \ O \ D \ 9q w \ \ M O N �\ o N N �P� LAND Z ` z �` TfRr G\\ MATCH LINEcl- 85 5 SHEET 2 1 2o-2s-2o24 0 �pN9TF 0 F 4 D M. �0 Sheet 3 of 5 HMH ENGINEERING Lennon Pointe Exhibits.dwg (208) 342-7957 EXHIBIT B CREASON LATERAL PATHWAY EASEMENT J �C 0 is 30 SCALE: 1"= 30' AP-AP- < a fY I4) � a C ¢ J IZ a I I a Im o L M r1 N W M -> O M n � e-I l0 N o O ti Z O � Q NANO /PQ � 85 5 J,10-15-2024 p � Z A P �'pN9TF 0 F 41 D M. N� MATCH LINE Sheet 4 of 5 SHEET 3 HMH ENGINEERING Lennon Pointe Exhibits.dwg (208) 342-7957 EXHIBIT B CREASON LATERAL PATHWAY EASEMENT LINE TABLE CURVE TABLE LINE DIRECTION LENGTH CURVE RADIUS DELTA LENGTH CH. BEARING CH. LENGTH L1 N20°26'27"W 3.17' C1 38.00' 028'15'59" 18.75' N22°33'31"W 18.56' L2 N36°41'31"W 67.38' C2 52.00' 016'22'05" 14.86' N28°30'28"W 14.80' L3 N20° 19'26"W 44.30' C3 52.00' 007°49'14" 7.10' N16°24'49"W 7.09' L4 N00°01'03"W 14.06' C4 49.25' 015'52'01" 13.64' N88°15'20"W 13.60' L5 N00°01'03"W 40.45' C5 63.25' 011'15'44" 12.43' S89°11'18"E 12.41' L6 S20° 19'26"E 44.30' C6 354.05' 016'09'53" 99.89' N09°10'55"W 99.55' L7 S36°41'31"E 67.38' C7 368.47' 026°55'22" 173.14' S09°48'1 YE 171.55' L8 N88°59'01"W 13.52' C8 38.00' 021°36'24" 14.33' S09°31'14"E 14.25' C9 38.00' 016°22'05" 10.86' S28°30'28"E 10.82' r-c 1 0 52.00' 028-15-59" 25.65' S22°33'31"E 25.39' ,\ \_ LAND L\� o\- TERr G\\ a 85 5 7u s 10-15-2024 p �'pN9TF OF 41 D M. �0 Sheet 5 of 5 HMH ENGINEERING Lennon Pointe Exhibits.dwg (208) 342-7957