HomeMy WebLinkAboutCC - Transition Plan Timber Creek Recycling
"Enbineerino- waste to its highest and best use
Date: October 28', 2024
Phased Transition Plan for the Meridian Compost Site
7695 S. Locust Grove Rd
Meridian, ID 83642
Phase Focus 2024 Timing . % of total Cheese
WAS diverted
Odor
o Stop regularly receiving Cheese Q1 Q2 Q3 Q4
#1 WAS on weekends at the Meridian
site
(Complete Dust
by
December o Effective November 1st, no more
2024) Concrete/Asphalt/Tile/Porcelain/
Brick accepted at the Meridian Q1 Q2 Q3 Q4
site
o Continue regular dust control
measures (i.e. water truck)
Volume
o At least 25% of the inbound Q1 Q2 I Q3 Q4
Cheese WAS diverted from the 2s°i°
Meridian site
Accountability
o Present final transition plan to Q1 Q2 Q3 Q4
Meridian City Council
1
TCR Transition Plan 2024-2027
Phase Focus 2025 Timing % of total Cheese
WAS diverted
Odor
o Pilot the addition of Calcium Q1 Q2 Q3 Q4
#2 Hydroxide, "lime"(Ca(OH)2), to
inbound Cheese WAS (Q1)
o Ongoing coordination with Sorrento
Lactalis Cheese Plant
(Complete o Fully implement additional
by successful odor control measures
December (Q2)
2025)
Dust
o Final crushing of
Concrete/Asphalt/Tile/Porcelain/
Brick at the Meridian Site (Q1) Q1 Q2 Q3 Q4
o Continue regular dust control
measures (i.e. water truck)
Volume
o Complete engineering for new ASP Q1 Q2 Q3 Q4
pad (Q2)
o Additional ASP pad (1 of 2) under 50%
construction at the Nampa site (Q3)
o Additional 25%of inbound Cheese
WAS diverted from the Meridian site
(Q4)
Accountability
o Quarterly inspections with Meridian Q1 Q2 Q3 Q4
City Code Enforcement
2
TCR Transition Plan 2024-2027
Phase Focus 2026 Timing % of total Cheese
WAS diverted
Odor
o Ongoing monitoring of Cheese WAS Q1 Q2 Q3 Q4
3 odor control measures
Dust
(Complete o Continue regular dust control
by measures (i.e. water truck) Q1 Q2 Q3 24
December
2026) Volume
o Complete engineering for new ASP 1009,E
pad (Q2)
o Additional ASP pad (2 of 2) under Q1 Q2 Q3 Q4
construction at the Nampa site (Q3)
o 100% of the Cheese WAS diverted
from the Meridian site (Q4)
Accountability
o Quarterly inspections with Meridian Q1 Q2 Q3 Q4
City Code Enforcement
3
TCR Transition Plan 2024-2027
Phase Focus 2027 Timing % of total Cheese
WAS diverted
Odor
o No cheese WAS received at Q1 I Q2 I Q3 Qa
#4 the Meridian site
Dust
(Complete o Continue regular dust control
by measures (i.e. water truck) Q1 Q2 Q3 Q
December 4 2027)
Volume
o Sale or transfer of remaining 100�io
inventory
Q1 Q2 Q3 Qa
o Movement of
compost/recycling materials
and infrastructure off of the
site
Accountability
o Quarterly inspections with
Meridian City Code
Enforcement
Q1 Q2 q3 Qa
o Final site walk through with
Meridian Code Enforcement
(Q4)
4
TCR Transition Plan 2024-2027