Loading...
HomeMy WebLinkAboutCC - Transition Plan Timber Creek Recycling "Enbineerino- waste to its highest and best use Date: October 28', 2024 Phased Transition Plan for the Meridian Compost Site 7695 S. Locust Grove Rd Meridian, ID 83642 Phase Focus 2024 Timing . % of total Cheese WAS diverted Odor o Stop regularly receiving Cheese Q1 Q2 Q3 Q4 #1 WAS on weekends at the Meridian site (Complete Dust by December o Effective November 1st, no more 2024) Concrete/Asphalt/Tile/Porcelain/ Brick accepted at the Meridian Q1 Q2 Q3 Q4 site o Continue regular dust control measures (i.e. water truck) Volume o At least 25% of the inbound Q1 Q2 I Q3 Q4 Cheese WAS diverted from the 2s°i° Meridian site Accountability o Present final transition plan to Q1 Q2 Q3 Q4 Meridian City Council 1 TCR Transition Plan 2024-2027 Phase Focus 2025 Timing % of total Cheese WAS diverted Odor o Pilot the addition of Calcium Q1 Q2 Q3 Q4 #2 Hydroxide, "lime"(Ca(OH)2), to inbound Cheese WAS (Q1) o Ongoing coordination with Sorrento Lactalis Cheese Plant (Complete o Fully implement additional by successful odor control measures December (Q2) 2025) Dust o Final crushing of Concrete/Asphalt/Tile/Porcelain/ Brick at the Meridian Site (Q1) Q1 Q2 Q3 Q4 o Continue regular dust control measures (i.e. water truck) Volume o Complete engineering for new ASP Q1 Q2 Q3 Q4 pad (Q2) o Additional ASP pad (1 of 2) under 50% construction at the Nampa site (Q3) o Additional 25%of inbound Cheese WAS diverted from the Meridian site (Q4) Accountability o Quarterly inspections with Meridian Q1 Q2 Q3 Q4 City Code Enforcement 2 TCR Transition Plan 2024-2027 Phase Focus 2026 Timing % of total Cheese WAS diverted Odor o Ongoing monitoring of Cheese WAS Q1 Q2 Q3 Q4 3 odor control measures Dust (Complete o Continue regular dust control by measures (i.e. water truck) Q1 Q2 Q3 24 December 2026) Volume o Complete engineering for new ASP 1009,E pad (Q2) o Additional ASP pad (2 of 2) under Q1 Q2 Q3 Q4 construction at the Nampa site (Q3) o 100% of the Cheese WAS diverted from the Meridian site (Q4) Accountability o Quarterly inspections with Meridian Q1 Q2 Q3 Q4 City Code Enforcement 3 TCR Transition Plan 2024-2027 Phase Focus 2027 Timing % of total Cheese WAS diverted Odor o No cheese WAS received at Q1 I Q2 I Q3 Qa #4 the Meridian site Dust (Complete o Continue regular dust control by measures (i.e. water truck) Q1 Q2 Q3 Q December 4 2027) Volume o Sale or transfer of remaining 100�io inventory Q1 Q2 Q3 Qa o Movement of compost/recycling materials and infrastructure off of the site Accountability o Quarterly inspections with Meridian City Code Enforcement Q1 Q2 q3 Qa o Final site walk through with Meridian Code Enforcement (Q4) 4 TCR Transition Plan 2024-2027