Loading...
HomeMy WebLinkAboutPZ - Site Posting for 11-7 CERTIFICATE OF SIGN POSTING I certify under penalty of perjury pursuant to the laws of the State of Idaho that the foregoing is true and correct: In accordance with the City of Meridian public hearing process listed in UDC 11 -5A-6, I personally posted or attest that the subject property was properly posted on 16- 4 S! � .1 a A 4 L which is at least ten (10) days prior to the schedulgl public hearing for Sins"O n 1 � �6 � L PC t fL. loin � a � for the �tp&+ dw !�. 1 I have submitted a map depicting the location(s) of the sign(s) and photograph(s) of the posting to the City, concurrent with this certification seven (7) days prior to the public hearing. The sign(s) will be removed no later than three (3) days after the public hearing. Dated this)— day of Oo4a 244 Printed Name: L *4me^, a Gt 1aCy �e Signature: 70L Rev 0911812024 �` . . . � F,. y a IL r l Ad 4 x 4 Signs Posted E Cavalli Ln '` r Q J ., o cn O CD a um . . •. - - Columbia Rd - . . Map of Sign Posting for Summerlin Development per Meridian UDC 11 -5A-6