Loading...
HomeMy WebLinkAbout2024-10-24 ACHD Alexis Pickering,President Miranda Gold,Vice-President ACHD Jim Hansen,Commissioner Kent Goldthorpe,Commissioner 'ar ww�m Dave McKinney,Commissioner Date: October 21, 2024 To: Ethan Mansfield, Hawkins Companies Bob Beckman, Kimley-Horn and Associates Staff Contact: Sam Standal, Assistant Traffic Engineer Project Description: Fairview Drive Through Coffee Trip Generation: This development is estimated to generate 92 vehicle trips per hour in the AM peak hour, based on the traffic impact study. Proposed Development Traffic Impact Study Meets All ACHD •• _ F •'-• Revisions to ACHD Policies •. • • required PlannedArea Roadway Level of ACHD Service Improvements D• area roadways • D's LOS Planning Thresholds? Yes • Livable Street Performance Measures Area •.• -- • LOS Planning Thresholds in Pedestrian the future with planned • • Is Transit • - • Comments: Transit is available via VRT Route 4S. connecting you to more Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 208387-6100•FX 345-7650•www.achdidaho.org Development Services Department 'ACHD connecting you to more Project/File: Fairview Drive Through Coffee Shop / MER24-0065 / H-2024-0049 The development application is for the construction of a combination coffee shop- vehicle quick lubrication building on a 0.76-acre parcel. This application also includes a development agreement modification with the City of Meridian. Lead Agency: City of Meridian Site address: 4300 E Fairview Avenue Staff Approval: October 21, 2024 Applicant: Ethan Mansfield, Hawkins Companies 855 W Broad Street Boise, ID 83702 Representative: Bob Beckman, Kimley-Horn & Associates 1100 W Idaho Street, Suite 210 Boise, ID 83702 Staff Contact: Sam Standal, Assistant Traffic Engineer Phone: 208-387-6384 E-mail: sstandal(@achdidaho.org Report Summary: ACHD Planned Improvements............................................2 Level of Service Planning Thresholds.................................2 A. Site Specific Conditions of Approval ............................3 B. Vicinity Map.................................................................4 C. Site Plan ......................................................................5 D. Traffic Impact Study— Summary and Findings.............6 E. Findings for Consideration...........................................8 F. Policy...........................................................................9 G. Attachments...............................................................13 H. Standard Conditions of Approval ...............................13 I. Conclusions of Law....................................................14 Request for Appeal of Staff Decision ................................15 1 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 ACHD Planned Improvements 1. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Fairview Avenue is scheduled in the IFYWP to be widened to 7-lanes from Locust Grove to Eagle Road in 2029. • The intersection of Fairview Avenue and Locust Grove Road is scheduled in the IFYWP to be widened to 7-lanes on the north leg, 7-lanes on the south, 9-lanes east, and 9-lanes on the west leg, and reconstructed in 2029. • Fairview Avenue is listed in the CIP to be widened to 7-lanes from Meridian Road to Locust Grove Road and from Eagle Road to Cole Road between 2036 and 2040. • The intersection of Fairview Avenue and Locust Grove Road is listed in the CIP to be widened and reconstructed between 2021 and 2025. • The intersection of Fairview Avenue and Cloverdale Road is listed in the CIP to be widened and reconstructed between 2021 and 2025. Level of Service Planning Thresholds 1. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Fairview Avenue 142-feet Arterial 1611 Better than "E" * Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH). ** ACHD does not set level of service thresholds for State Highways. 2. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Fairview Avenue west of Cloverdale Road was 35,600 on July 16, 2024. 2 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 A. Site Specific Conditions of Approval 1. Dedicate additional right-of-way on Fairview Avenue to total 62-feet from centerline. 2. If desired, reconstruct the existing driveway to be 30 to 36-feet wide paved curb return type driveway. 3. Replace or repair any deteriorated transportation facilities abutting the site. 4. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 5. There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 6. Comply with all Standard Conditions of Approval. 3 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 B. Vicinity Map ;id. _. ,EgVen[urc PI `^ �A 12550 rr 285 tj 422,5 _ •i 4349 jw,� +* .RR FF IL,55 � �, 11542 r + � 12,0 12570 125I11 zs�n - i 12632 • ate. �.:J¢¢ 12624 1 F F �' C •. N 12598 9 12598 12S1G 126G•S., y 12598 1239k3 12516 I as - - W Fairview Ave 4 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 C. Site Plan i f I � I-- --.._— -- ____________ .,+� All�e c igeuyp tl b 11 .44 - ------------ -- - -------- - tl z � I d I I�Ir. Ir ° r�al+ I ae 5 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 D. Traffic Impact Study - Summary and Findings 1. Traffic Impact Study Kimley-Horn & Associates prepared a traffic impact study (TIS) for the proposed coffee and quick lubrication vehicle shop. An executive summary of the findings as presented by Kimley-Horn & Associates can be found as Attachment A. ACHD has reviewed the submitted traffic impact study for consistency with ACHD policies and practices and may have additional requirements beyond what is noted in the TIS. Staff comments and recommendations on the submitted traffic impact study can be found below. a. Policy: Mitigation Proposals: Mitigation recommendations shall be provided within the report. At a minimum, for each roadway segment and intersection that does not meet the minimum acceptable level of service planning threshold or v/c ratio, the report must discuss feasible measures to avoid or reduce the impact to the system. To be considered adequate, measures should be specific and feasible. Mitigation may also include: • Revision to the Phasing Plan to coincide with the District's planning Capital Projects. • Reducing the scope and/or scale of the project. Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such as roadway widening and intersection improvements are infeasible as determined by ACHD, the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall demonstrate that impacts from the project will be offset. • If the impacted roadway segments and/or intersections are programmed as funded in the Integrated Five Year Work Plan (IFYWP) or the Capital Improvements Plan (CIP); no alternative mitigation is required. • If the impacted roadway segments and/or intersections are not programmed in either the IFYWP or the CIP; the applicant may (i) analyze the shoulder hour, defined as the hour prior to after the determined peak hour within the two-hour peak period, (sometime analyzed as hour before or after peak period) and (ii) provide a safety analysis to determine alternative mitigation requirements. o If the impacted roadway segments and intersections meet the minimum acceptable level of service planning thresholds in the shoulder hour, the applicant may suggest feasible alternative mitigation measures beyond improvements from District policy, such as: off-site sidewalks, off-site bike facilities, connectivity, safety improvements, etc. within 1.5 miles of the proposed development. o If the shoulder hour planning thresholds are exceeded the applicant may request to enter into a Development Agreement and pay into the Priority Corridor Fund an amount determined by the ACHD to offset impacts from the project. • Alternative Mitigation may also include: o Revision to the Phasing Plan to coincide with the District's future Capital Projects. o Reducing the scope and/or scale of the project. Level of Service Planning Thresholds: District Policy 7205.3.1 states that Level of Service Planning Thresholds have been established for principal arterials and minor arterials within ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise required to provide a Traffic Impact Study under section 7106, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic 6 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. b. TIS Findings: Staff has reviewed the submitted traffic impact study (TIS). The TIS indicates that the roadway segments and intersections in the study area are anticipated to operate at an acceptable level of service, and that vehicles are unlikely to queue on Fairview Avenue while waiting to access the site. c. Staff Comments/Recommendations: Staff agrees with the findings and recommendations of the traffic impact study and does not recommend any mitigation for this development. 7 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 E. Findings for Consideration 1. Fairview Avenue a. Existing Conditions: Fairview Avenue is improved with 5-travel lanes, vertical curb, gutter, and 5-foot-wide sidewalk. There is 104-feet of right-of-way for Fairview Avenue (54-feet from centerline). b. Applicant Proposal: The applicant is not proposing any additional improvements to Fairview Avenue. c. Staff Comments/Recommendations: The applicant's proposal meets District policy and should be approved. The applicant should be required to dedicate additional right of way to total 62-feet from centerline. The applicant should be required to repair or replace any deteriorated transportation facilities abutting the site. 2. Driveways 2.1 Fairview Avenue a. Existing Conditions: There is an existing 25-foot-wide shared driveway onto Fairview Avenue located at the site's east property line. This driveway is shared with parcel directly east of the site 12668 W Fairview (S1104438500). b. Applicant's Proposal: The applicant is proposing to use the existing shared driveway to access the site. c. Staff Comments/Recommendations: The applicant's proposal does not meet District driveway location or width policy; however, staff recommends allowing the driveway to be located as proposed due to the fact the applicant's proposal maximizes the distance from the driveway and the next intersection within the available site frontage and reduces the number of driveways on Fairview Avenue by sharing a driveway with an adjacent business. However, the applicant may want to consider still widening the driveway to between 30 and 36-feet to accommodate anticipated volumes of traffic and to make it easier to enter and exit the site. 3. Other Access Fairview Avenue is classified as a principal arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway and should be noted on the final plat. 8 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 F. Policy 1. Federal Accessibility Design Guidelines and Standards District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG), 36 CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional information). 2. Minor Improvements Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 3. Livable Street Performance Measures District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation network that serves all ages and abilities. Bike and pedestrian facilities built through development should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a minimum of 5-feet. 4. Fairview Avenue Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Improvements shall include transitional segments in accordance with the current version of PROWAG. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map, Livable Streets Design Guide, and the most current ACHD Livable Streets Performance Measures Plan as adopted by the ACHD Commission. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 7-lane street section shall be 81-feet (back-of-curb to back-of-curb). This width typically accommodates three travel lanes in each direction, a continuous raised or landscaped median with intermittent turn lanes, and curbs and gutters. A 7-lane road shall also include a minimum 10-foot wide multi-use path outside the curb line on both sides with an 8-foot wide buffer from back-of-curb. Other Level 3 bike facility treatments as defined in the ACHD Bike Master Plan may be approved at the discretion of the ACHD Development Review Supervisor. The standard right-of-way width for a 7-lane arterial is 124-feet. If a landscaped median is included in any of these cross sections, the landscaping shall be maintained by license agreement with the adjacent HOA, property owner, or by interagency agreement with the corresponding land use jurisdiction. 9 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 At the discretion of Traffic Engineering staff, adjustments may be made to the street section, including removal of the continuous center turn lanes or modification to lane widths, where no driveways or intersections are present or to ensure adequate space for pathway and buffers. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Pedestrian Facilities: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide are required on both sides of all arterial streets. A parkway strip at least 8-feet wide between the back- of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Alternatively, on roadways identified for improvement in the Capital Improvement Plan, a minimum 10-foot wide multi-use path may be required. The path shall be placed in accordance with planned buildout in the Master Street Map with a minimum 8-foot wide planter strip as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Consult the District's planter width policy if trees are to be placed within the parkway strip. In some instances, to match existing conditions, a minimum 7-foot wide sidewalk may be constructed next to the back-of-curb. ACHD Development Review staff will be responsible for determining the required facility. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Detached sidewalks and multi-use paths are encouraged and should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line parallel to the roadway when authorized by Development Review staff to accommodate site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public pedestrian facilities are placed out of the right-of- way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the pedestrian facility. Pedestrian facilities shall either be located wholly within the public right-of-way or wholly within an easement. Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Fairview Avenue is designated in the MSM as a Mobility Arterial with 7-lanes and on-street bike lanes, a 91-foot street section within 124-feet of right-of-way. 5. Driveways 5.1 Fairview Avenue 10 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under District policy 7205.4.7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restrict the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 355-feet from the nearest intersection for a right-in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal arterial roadways with a speed limit of 40 MPH to align or offset a minimum of 330-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which "is permitted for use until appropriate alternative access becomes available". Temporary access may be granted through a development agreement or similar method, and the developer shall be responsible for providing a financial guarantee for the future closure of the driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. 6. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 7. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop 11 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 8. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 12 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 G. Attachments Attachment A- Queueing Analysis by Kimley-Horn and Associates 13 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 Kimley>>> Horn NAL FN MEMORANDUM To: Development Services a 1197 Ada County Highway District 6/24/2024 From: Robert Beckman, P.E. �0 9T PLO Q' FOF1O Kimley-Horn and Associates, Inc. RTA. BEG Date: June 24, 2024 Subject: Human Bean on Fairview Avenue in Meridian, ID -Traffic and Queuing Analysis Memorandum This memorandum presents a vehicle queuing analysis for the proposed Human Bean Coffee and quick lubrication vehicle shop development at 4300 E Fairview Avenue in Meridian, ID. The proposed site layout information, trip generation, drive-through vehicle queue data collection, and a drive-through vehicle queuing analysis are presented in this memorandum. A vicinity map depicting the development's location is shown in Figure 1. Introduction The proposed mixed-use site includes a 650 sq. ft coffee shop with one drive through lane without indoor seating, and 1,300 sq.ft quick lubrication oil changing facility with two queuing lanes for a total of 1,950 sq. ft. The site will have one access off Fairview Avenue. A site plan of the proposed development is provided in Attachment A. 00 W. Idaho Street, Suite 210, Boise, I D 83702 �: Kim ey>>> Horn Page 2 N RAT -4 WWI MIZZ MeridianID Fairvie _ F`i 7�1y ti Prop sed , co, •'� .��:._ � o Development W >`ems�fi18:� 4 �',•�' .ate..,•. ,171� =• i O '1-:`+�::ro�' • - PineAvenue. U Figure 1 —Vicinity Map Trip Generation The Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, was used to obtain peak hour weekday AM trip generation equations or rates and inbound-outbound percentages for quick lubrication oil changing facility (ITE Code 941) which were then used to estimate the number of AM peak hour trips that can be attributed to the proposed development. The process outlined in the ITE Trip Generation Handbook, 3rd Edition, was used to determine whether average rates or equations should be used in calculating each land use's trip generation. Kimley-Horn collected drive-through vehicle queue information at three Human Bean coffee shop locations in Meridian, ID. Peak period (Weekday AM lam—9am) drive-through vehicle queuing totals were collected at the following locations: • • 1100 W. Idaho Street, Suite 210, Boise, 1 1: • :: Kimley>>> Horn Page 3 • 1635 N Meridian Rd, Meridian, ID, June 2024 (491 sq. ft.) • 2385 W Nelis Dr, Meridian, ID, June 2024 (480 sq. ft.) • 2480 E Gala St, Meridian, ID, June 2024 (480 sq. ft) Table 1 summarizes the trip generation of observed at the drive-throughs for the peak weekday AM hours. Drive-through queue data collected is provided in Attachment B. Table 1 —Observed AM Peak Hour Drive-Through Queues (Number of Vehicles) Location Estimated Size Estimated AM Peak (GSF) Total In Weekday AM Peak Hour 000 Meridian Road 491 62 31 31 126.3 Nelis Drive 480 36 18 18 75.0 Gala Street 480 88 44 44 183.3 Observed Average Trip Rate Per 1,000 GSF 128.2 The trips to each site primarily involve drive-through visits and Table 1 shows that trip rates vary for each site even though they are similar GSF. These results show that GSF does not have significant impact on trip generation. To estimate trip generation for the proposed Fairview coffee shop, the average trip rate from Table 1 was used. The observed average trip generation rate from a similar Human Bean Coffee shop was applied to the proposed 650 square feet stand to forecast expected trip generation during the AM peak hour. Table 2 shows the estimated trip generation based on the observed average rate. Table 2—Trip Generation for Proposed Stand Based on Similar Locations Weekday AM Peak Hour Location Stand Size Total In Out Fairview Avenue (Proposed) 650 84 42 42 The ITE Trip Generation Manual, 11th Edition estimates the coffee shop will generate 179 daily trips with the AM peak hour generating approximately 40 total trips, with 20 trips entering and 20 trips exiting. Additionally, it estimates the quick lubrication oil changing facility to generate 90 total daily trips with the AM peak hour generating approximately eight total trips, with six trips entering and two trips exiting. Table 3 shows the estimated trip generations from the ITE Trip Generation Manual. • • 1100 W. Idaho Street, Suite 210, Boise, 1 1: • :: Kimley>>> Horn Page 4 Table 3—Trip Generation for Proposed Stand Based on ITE Trip Generation Manual Land Use Type Use Quantity Units Total Code Total In ITE Land Daily AM Peak Coffee/Donut Shop w/Drive-Thru 938 1 Number of 179 40 20 20 Lanes Quick Lubrication Oil Changing 941 1.3 1,000 SF 90 8 6 2 Facility Total 269 48 26 22 The estimated number of trips generated from the sampled Human Bean locations were found to be around 52% greater than the trip generation estimated from the ITE Trip Generation Manual for the weekday AM peak hour. Drive-Through Queueing Data The proposed Human Bean Coffee shop will have a single drive-through entrance leading to a service lane that extends from the entrance to the pick-up window and continues along the north side of the building, and back along the east side of the building to the south site access. The pick-up window is located on the west side of the building, providing a single lane for vehicles to queue. The drive-through lane offers approximately 80 feet of storage from the pickup window to the order station. An additional 300 feet of storage is available between the order station and the driveway off Fairview Avenue. This configuration can accommodate approximately 15 vehicles, assuming each vehicle requires 25 feet of space. In addition, the parking at the building site has capacity to hold an additional 18 vehicles. The queuing data from sample Human Bean location's drive-throughs was used to estimate the 95th percentile queue and maximum queue at the proposed coffee stand. Because drive-through trip generation is not directly tied to building square footage, traffic counts from adjacent arterial streets gathered from ACHD online traffic counts for the locations below were used to estimate a queuing rate. • Meridian Road, South of Fairview Avenue—Collected on 3/20/2019 • Ten Mile Road, South of McMillan Road—Collected on 9/15/2021 (used for Nelis location) • Overland Road, West of Locust Grove—Collected on 10/5/2021 (used for Gala location) • Fairview Avenue, East of Eagle Road—Collected on 7/27/2022 The counts were grown to 2024 travel volumes using growth rates provided by COMPASS. It should be noted that the COMPASS model outputs show no growth along the Ten Mile Road and Overland Road segments that the Nelis Drive and Gala Street locations have frontage on. Attachment C provides COMPASS growth rates. This methodology mirrors the approach used in trip generation data collection and rate calculation, shown in Table 4. • • 1100 W. Idaho Street, Suite 210, Boise, ID 837021: • :: Kimley>>> Horn Page 5 Table 4—9511 Percentile and Maximum Observed Queue and ACHD Traffic Counts JMrStand Size Adjacent Arterial 95th percentile Maximum Observed (GSF) Traffic Volume Queue (veh) e Meridian Road 491 1,513 (2019) 4 5 1,528 2024 Nelis Drive 480 1,236 (2021) 3 4 1,236 2024 Gala Street 480 1,800 (2021) 7 10 1,800 2024 Observed Average Queue Rate per 1,000 VPH 2.98 4.02 Based on the volumes collected from 2022 ACHD traffic counts for Fairview Avenue and grown to 2024 traffic volumes, the estimated 95th percentile and maximum queues at the proposed coffee stand are four and six cars, respectively. Table 5 shows the estimated queue results. Table 5—95' Percentile and Maximum Estimated Queue and ACHD Traffic Counts Human Bean Coffee Weekday AM Stand Location Stand Size Adjacent Arterial 95 th percentile Maximum Observed (GSF) Traffic Volume Queue (veh) e Fairview Avenue (Proposed) 650 1,361 (2022) 4 6 1,375 2024 It is recommended to use the estimated 95th percentile queue of four vehicles and a maximum queue of six vehicles as the design parameters for the new coffee stand on Fairview Ave. Proposed Site Plan Queuing Evaluation The site plan specifies a total drive-through storage of about 80 feet, designed to accommodate up to three vehicles, assuming each vehicle is approximately 25 feet long.Additionally, there is approximately 300 feet of drive-through storage from the order stand to the driveway on Fairview Avenue. This configuration ensures that the proposed drive-through can easily handle the estimated 95th percentile and maximum queue,even during peak times or instances when multiple vehicles arrive simultaneously at the order stand. Figure 2 shows the queue storage on the proposed site plan. • • 1100 W. Idaho Street, Suite 210, Boise, ID 837021: • :: Ki m ey>>> H o r n Page 6 Drive-Thru Queue Storage L Additional Queue Storage _ - 1 i a LJ � rt - - �I I, '..,t i , J i 6q I ,•"s j, rmiwm � — . l 4�ttI I I rvn PRO TEAM PROIfCT DATA b„ Figure 2 —Queue Storage While extended vehicle queuing beyond the drive-through storage during maximum queuing events may impact parking accessibility and entrance to the quick lubrication oil changing facility, it's likely that these occurrences will be rare as popular time for the coffee shop do not normally align with that of a lube changing facility. The available storage and configuration of the proposed site should support the estimated maximum queue of six vehicles during the AM peak hour and access to the lube and parking facilities during these times. Conclusions Based on the trip generation and queuing data from comparable Human Bean Coffee shops, it is estimated that the maximum queue length for the proposed Fairview Avenue location during the AM peak hour will be approximately six vehicles. The site plan features a drive-through lane designed to accommodate about three vehicles, along with additional storage for up to approximately 12 vehicles, which exceeds the anticipated maximum queue. The evaluation indicates that queue spill back onto Fairview Avenue is unlikely. Therefore, no on-site mitigation measures are recommended to manage queuing vehicles. Additionally, there is no recommendation for a westbound right-turn lane to address potential queue spillback onto Fairview Ave. • • 1100 W. Idaho Street, Suite 210, Boise, 1 1: • :: Ki m ey>>> H o r n Page 7 It is recommended that store management implement operational strategies to mitigate the impact of individual vehicles with longer service times and to enhance order efficiency during peak periods when multiple vehicles queue. Please contact Bob Beckman at 208-510-6265 or Robert.Beckman(a�kimley-horn.com if you have any questions or comments on the information presented in this memorandum. Attachments Attachment A— Site Plan Attachment B—Drive-Through Queue Data Collection Attachment C— COMPASS Growth Rates • • 1100 W. Idaho Street, Suite 210, Boise, ID 837021: • :: H. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD requirements . The applicant's engineer should provide documentation of compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property, which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. I. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. 14 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049 Request for Appeal of Staff Decision To request an appeal of a staff level decision, see District policy 7101.6.7 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 Request for Reconsideration of Commission Action To request reconsideration of a Commission Action, see District policy 1006.11 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 15 Fairview Drive Thru Coffee/MER24-0065/ H-2024-0049