HomeMy WebLinkAboutLandscape L1.1 Details 07I TREES5ZE NOTES
STREET TREES CAL-CUL-ATONS (I TREE/35 L-F) LANDSCADE NOTES TODSOIL NOTES
[� STREET NAME BUFFER LF CALCULATIONS REQ PRVD I. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR
EASTERN \ DUD 2 EXISTING TEN MILE ROAD WIDTH I. TOPSOIL_ REQUIREMENTS° ASTM D 5268 PH RANGE OF 5.5 TO 7 FOUR PERCENT ORGANIC MATERIAL_
35' qz5 °25/BS=5.5 55 6 PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS
TOTAL STREET TREES MATERIALS HARMFUL_ TO PLANT GROWTH.
C C C D C / 2. NO MATERIAL_ SUBSTITUTIONS SHALL_ BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN 2. TOPSOIL_ SOURCE° STRIP EXISTING TOPSOIL_ FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL_
2 CFNDULA V D - JP RUC- (D-7 EXISTING TOTAL PERIMETER PARKING TREES 8 APPROVAL_. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SU REACE SOIL_, REASONABLY FREE OF SUBSOIL, CLAY
REQ PRVD SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. LUMPS, BRUSH, WEEDS AND OTHER UTTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER
CYC D CDD TOTAL PARKING ISLAND TREES 4 5 THEN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT
���Y BLUE - -� COLOI\�DO JI \UC C- -71 RFo PRVD 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT.
TOTAL SITE TREES Iz zz
4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FO R ACIDITY, FERTILITY AND GENERAL TEXTURE BY A
I I CC CCD CD Y CONSTRUCTION START-UP. RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AN D COPIES OF THE TESTING AGENCY'S FINDINGS
3 C t�1 A N�I C L L L I\ C A L L L I\ I FEAR 2' AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE
• 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC
IITIGATION REQUIREI IENTS REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE
THERE ARE NO ILEA THY TRFFS > 4° CA . PROPOSED FOR REMOVA 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION.
SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. 4. PLACE TOPSOIL IN AREAS REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL
-1 17 PARKING STALLS DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO
/ YD I\D I HANDICAP 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE PROPOSED FINISH GRADE, AS REQUIRED.
O 10 L T T L E LM L D A N G L A 2 GALLON QUANTITIES AND CALL OUT SYMBOL NUMBERS.
5. COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS:
ROSE
8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF I" BLACK AND TAN ROCK A. LAWN AREAS: C INCHES MINIMUM OR AS NECESSARY TO ACHIEVE EVEN GRADES WITH
O 27 FLOI�ER CAR CET ROSE 2 GALLON SURROUNDING LAWN AREAS.
D C C C D 9. ALL PLANT MATERIAL SHALL BE GUARANTEED FORA PERIOD OF ONE YEAR BEGINNING AT THE DATE OF B. PLANTER BEDS° 18 INCHES MINIMUM
2 W L T O N C I\1-1-D N� L U N D L I\ 2GALLON ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY
/�
CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE
I0. FINISH GRADES SHALL PROVIDE A SMOOTH TRAIN SITION WITH ADJACENT SURFACES AND ENSURE QQ \ / D Y D 2 GALLON RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL
u V O \ L O D O WOOD POSITIVE DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. I. AMEND EXISTING APPROVED TOPSOIL AT A RATIO SHALL BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND I" FOR SEED.
G CD OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER 7. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL
YD
7 J K I\O C K E T L U N D E I\S 15 GALLON A MINIMUM OF 6 INCHES INTO TOPSOIL. PLAN.
12. FERTILIZE ALL TREES AND SHRUBS WITH 'A GRIFORM' PLANTING TABLETS. QUANTITY PER 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE
MANUFACTURER'S RECOMMENDATIONS. STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED
GRASSES/PERENNIALS
��[� C C C D C 3. ALL PLANTING BEDS SHALL HAVE A MINIMUM IT DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM
� T \A S S E S/D E \E N N I A L S MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND BEING CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE
UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT PLAN TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS
D D G C D SURFACES OF TURF SOD AREAS, AND I" BELOW ADJACENT SURFACES OF TURF SEED AREAS.
37 K A R L F O E I\S T E I\ GRASS GALLON 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN f/� D T N T NOTES:
QUANTITIES ARE INSUFFICIENT. VERI FY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM.
I I M C C C C PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. I. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED
23 k� A E L N C D N E S E FOUNTAIN GRASS I GALLON TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS ON THEM PRIOR TO PLANTING OR HYDROSEEDING.
WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF
M C ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH -ROUND-UP- (CONTACT HERBICIDE) OR
O 30 IAINACDT (�IAY
NIGDT) M IEADOW SAGE I GALLON EITHER: APPROVED EQUAL.
C CC CC \ /C C A) PROVIDE APPROVED IMPORTED TOPSOIL, OR
M
O 3 U N S T E D E N G L S D LAVENDER 1 GALLON B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
5. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14)
LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOI L, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE
AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER DAYS.
EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS 5. APPLY SECOND APPLICATION OF -ROUND-UP- TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE
TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED WITH THE M REMOVE
WEEDS FROM
SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7)
SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN ,4 INCHES. DAYS. REMOVE WEEDS FROM THE SITE.
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE
TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING DIRECTED TO PERFORM A THIRD APPLICATION.
AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S
REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY 7. AT THE TIME OF PLANTING AND HYDROSEEDIN G, ALL PLANTING AREAS SHALL BE WEED FREE.
CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6.
16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER
OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.
7. TREES SHALL NOT BE PLANTED WITHIN THE I0'-0" CLEAR ZONE OF ALL STORM DRAINPIPE, STRUCTURES, R R I G A T O N NOTES:
OR FACILITIES.
18. STORM DRAINAGE FACILITIES MUST BE PROTEC I. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH
CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. ENSURESOMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE
19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO ZONES.
3. POPUP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OE 4 INCHES AT LAWN AREAS AND 18"
AT PLANTER BEDS.
4. PLANTER BEDS ARE TO HAVE A DRIP IRRIGATION SYSTEM OR POP UP SPRAY SYSTEM. ANNUALS,
PERENNIALS GROUND COVERS OR SHRUB MASSINGS SHALL_HAVE A POP UP SPRAY SYSTEM.
E X S T N� LANDSCAPE T O R E�A I N 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER
REQUIREMENTS ARE AS FOLLOWS:
a. PRECISE INDIVIDUAL STATION TIMING No. Dore DescnPifOn
SHALL- BE RETAINED AND PROTECTED b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
FENCING AROUND TREES AND EXISTING SOD e. AT LEAST ONE PROGRAM FOR EACH HYDROZONE REVISIONS
d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN OFF
e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE
ANYTHING RESULTING FROM DAMAGE SHALL BE REPAIRED BOULDERS DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDROZONES.
6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO
2-31 RESPECTIVE HYDRO ZONES.
7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH
w w w w w w TRIANGULAR SPACING.
w w w w w w KENTUCKY BLUE/PERENNIAL RYE 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES CUTTING EDGE LANDSCAPE
BLACK AND TAN ROCK U L C N w w w w w w (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS).
J. PROVIDE MINIMUM (I) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V. 5407 ALNORTN ST
II SOD LOCATIONS WITH LANDSCAPE ARCHITECT.
2 DEPTH w w w w w w BOISE/ ID B3714
_ _ _ _ _ _ _ _ _ LANDSCAPE CURBING EXISTING 211 CALIPER TREES
NHERE SOD AND ROCK FEET 0
DO NOT HEAVILY PRUNE THE TREE AT O D O p j oc'a N A F D 10 L E
PLANTING. PRUNE ONLY CROSSOVER o
LIMBS,CO-DOMINANT LEADERS,AND op p p o�oo
BROKEN OR DEAD BRANCHES. SOME
INTERIOR TWIGS AND LATERAL 0 p o0
BRANCHES NAY BE PRUNED; p° ° PRUNE DAYIAGED OR OBJECTION-
0 p a�p oqj
HOWEVER,DO NOT REMOVE THE o 0 p po a p PLANT HEIGHT SHALL BE MEASURED ABLE BRANCHES IN SUCH A
TERMINAL BUDS OF BRANCHES ° p o ;�. FRON FINISHED GRADE TO THE UPPER NANNER AS TO PRESERVE THE
THAT EXTEND TO THE EDGE OF o o SECURE STAKES TO MAIN YIAIN BODY OF THE PLANT NATURAL CHARACTER OF
THE CROWN. o Qpo 0 o p v TREE TRUNK W.HENP ROPE THE PLANT
0 13 NN(1/2 IN.)DIAN. � 'LII/ � EACH TREE YIUST FL PLANTED SUCH
AIL..... . THAT THE TRUNK FLARE IS VISIBLE
PLASTIC HOSE SHRUBS PLANTED IN GROUPS SHALL 50 YN(2 IN.)NULCH.DO NOT PLACE
0 0 1800 x 40 NN(721N.x -/21N.) �}'k AT THE TOP OF THE ROOT BALL.
_ BE SET IN CONTINUOUS BEDS AS O MULCH IN CONTACT WITH SHRUB TRUNK.
HARDWOOD STAKES OR OTHER ��� � o � �
50 YY(2 IN.)NULCH.DO NOT PLACE SHOWN ON PLAN CO O a 0 p0 po
GALVANIZED WIRE H CABLE APPROVED STAKE MATERIAL i � �W 0 0
o o TWIST WIRE TO TIGHTEN. �. w a o 0 a�Q
SET TOP OF ROOT BALL AT LEAST � o �. � � MULCH IN CONTACT WITH TREE TRUNK
25-50 NY(1-2 IN.)ABOVE GRADE(OR o o � MAINTAIN THE YIULCH WEED-FREE FOR w o
Wyk PLANTING METHOD ILLUSTRATED � 0 0 \ 1po o0 100 MN(4 IN.)NIGH EARTH SAUCER
NIGHER IN SLOWLY DRAINING SOILS) o p A MINIMUM OF THREE YEARS AFTER SHALL APPLY EQUALLY TO BARE- I
PLANTING. Q o 0 0 0 O o BEYOND EDGE OF ROOT BALL.
EACH TREE MUST BE PLANTED SUCH O o
1800 x 40 YN(721N.x -/21N.) ROOT STOCK f BALLED d BURLAP L o 0 0 0
THAT THE TRUNK FLARE IS VISIBLE oo �
AT THE TOP OF THE ROOT BALL. G88 N CLIFF CREEK LN
HARDWOOD STAKES OR OTHER � `�
APPROVED STAKE MATERIAL w o v a\ Da l�f ER D AN D 83�42
DO NOT COVER THE TOP =
50 YY(2 IN.)MULCH.DO NOT PLACE DO NOT COVER THE TOP OF THE ROOT SET SHRUBS 50 NY(2")HIGHER THAN
OF THE ROOT BALL WTN SOIL . 100 YY(4 IN.)NIGH EARTH SAUCER SURROUNDING GRADE TO TO ao
MULCH IN CONTACT WITH TREE TRUNK. BALL WITH SOIL. z -�
BEYOND EDGE OF ROOT BALL. a
MAINTAIN THE MULCH WEED-FREE FOR ALLOW FOR SETTLEMENT SPECIFIED SOIL MIXTURE FIRMLY
A MINIMUM OF THREE YEARS AFTER 100 MY(4 IN.)HIGH EARTH SAUCER � / - CONPACTED TO ELIMINATE AIR
OF THE ROOT BALL WITH SOIL.
PLANTING. BEYOND EDGE OF ROOT BALL. REMOVE ALL TWINE,ROPE AND WIRE,AND DO NOT COVER THE TOP j//', %.//' POCKETS AND PREVENT
_ / / / /
BURLAP FROM TOP HALF OF ROOT BALL - /
- / � / - / SETTLEMENT
SCARIFY S IRRIGATE INSIDE OF
SHRUB PLANTING PIT PRIOR TO -III % / / RENOVE NURSERY POT PRIOR
SPECIFIED SOIL MIXTURE FIRMLY - / / / / / TO PLANTING(IF APPLICABLE)
COMPACTED TO ELIMINATE AIR PLANTING
ALL STAKES SHALL BE DRIVEN /;// /� = POCKETS 4 SETTLEMENT -
_ TAMP SOIL AROUND ROOT BALL - - /
BASE FIRMLY WITH FOOT PRESSURE OUTSIDE THE EWE of THE ROOT BALL -
j% 50 THAT ROOT BALL DOES NOT SHIFT. _______=
ALL STAKES SHALL BE DRIVEN - / - -III- SET TOP OF ROOT BALL AT LEAST EXCAVATE B PREPARE PLANTING COMPACTED SUBGRADE
BED TO 450 MY(18)DEEP OR - -
_ _ 25-50 NN(1-2 IN.)ABOVE GRADE(OR AS SPECIFIED - - - - - - - -
OUTSIDE THE EDGE OF THE ROOT BALL - HIGHER I SLWLY DRAINING SOILS)
III II IIIIII II IIII�I H N O O
III III III III III III
REMOVE ALL TWINE,ROPE AND WIRE,AND IF PLANT 15 SHIPPED NTH A WIRE BASKET AROUND
BURLAP FRON TOP HALF OF ROOT BALL THE ROOT BALL,CUT THE WIRE BASKET IN FOUR PLACES
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND AND FOLD DOWN 200 NY B IN. INTO PLANTING HOLE. PLACE ROOT BALL ON UNEXCAVATED
( J OR TAMPED SOIL.
THE ROOT BALL,CUT THE WIRE BASKET IN FOUR PLACES PLACE ROOT BALL ON UNEXCAVATED SCALE PROJECT NO.
AND FOLD DOWN 200 YY(8 IN.)INTO PLANTING HOLE. OR TAMPED SOIL C111=10'
DECIDUOUS TREE PLANTING DETAIL CONIFEROUS TREE PLANTING DETAIL SHRUB PLANTING DETAIL DRAWN BY
TYPICAL INSTALLATION - 3" (75MM) CALIPER OR LESS TYPICAL INSTALLATION - �'�" (2000I 1) OR LESS TYPICAL INSTALLATION CI ECKED BY s SET NO.
LANDSCAPE
DATE 8.23.2024 DETAILS
DATE OF PRINT L 1.
Powered by DynaSCAPFP