Loading...
HomeMy WebLinkAboutElevations A3.0 CITY APPROVAL STAMPS 1 O 3 4 DRIFTMIER EQ EQ A R C H I T E C T S PRE-FINISHED METAL COPING, MTL-1 7983 LEARY WAY NE, REDMOND,WA 98052 (425)881-7506 MAIL@DRIFTMIER.COM PRE-FINISHED METAL COPING, MTL-1 SIGNAGE UNDER SEPARATE EIFS-1 STONE VENEER PERMIT, PROVIDE POWER SILL, SV-2 T.O. UPPER PARAPET EIFS-2 PER ELECTRICAL DRAWINGS 20'-3" 1. PAINT ALL COMPONENTS THAT ARE NOT PREFINISHED. 2. ALL PENETRATIONS THROUGH THE WRB OF THE BUILDING FROM BOLTS AND — T.O. PARAPET OTHER LARGE CONNECTION PIECES (NOT NAILS AND SCREWS)ARE TO BE TREATED = ; , -. , - .- _, ,- -•- _ - ,•- -• � _ - , - - _ , •_- 19'-3' WITH LIQUID WRB. CANOPY ATTACHMENT HARDWARE TO MATCH _ _ _ •_ _ B6:3 _ _ _ _ _ _ _3. BUILDING SIGNAGE IS TO BE PROVIDED BY OWNERS VENDOR. GC TO PROVIDE CANOPY FINISH TYP. i7_ EIFS-2 POWER AND BLOCKING FOR INSTALLATION COORDINATE WITH VENDOR. - _ , � `-"'� ; CANOPY SUPPORT I. CONNECTION PER DETAIL 7.1 16 ; '� - 7' 4" 6'-6 SCALE ALUMINUM EXT. ELEVATION NOTES N/A 17 _ /T _ r PRE-FINISHED CANOPY, MTL-2 N THE FOLLOWING AREAS OF THE BUILDING ENVELOPE SHALL BE SEALED, CAULKED, _ _ _ WINDOW LEVEL GASKETED OR WEATHER-STRIPPED TO MINIMIZE AIR LEAKAGE (IN ACCORDANCE WITH — ' 10'-0" M 2018 INTERNATIONAL ENERGY CODE): _ uj co - I: 1. JOINTS, SEAMS, AND PENETRATIONS OF AIR BARRIER STOREFRONT SYSTEM, 2. JOINTS AROUND FENESTRATION AND DOOR FRAMES. +; , o GL- TL-4 - - STONE VENEER SILL, SV-2 �+ 3. JUNCTIONS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AT BUILDING - � _ PRE-FINISHED METAL X " o _ CORNERS, BETWEEN WALLS AND STRUCTURAL FLOORS OR ROOFS, AND BETWEEN O ' WALLS AND ROOF OR ROOF PANELS. FLASHING, MTL-1, TYP. �_ ED X = 00 , 4. OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH THE ROOFS, WALLS Y B.O. SILL AND FLOORS. ������� } �\ ����� 3'-0 =� o uj 5. SITE-BUILT FENESTRATION AND DOORS. w 6. BUILDING ASSEMBLIES USED AS DUCTS OR PLENUMS. --cl \ ' �_—� LEVEL 1Lu Y 7. LIGHT FIXTURE PENETRATION & POWER/DATA OUTLET PENETRATIONS CANOPY RAIN LEADER .. 8. ALL OTHER OPENINGS IN THE BUILDING ENVELOPE. Z NIGHT DROP, F.O.I.O. GC TO STOREFRONT SYSTEM, STONE VENEER WAINSCOT, SV-1 z DOORS AND GLAZING: AIR LEAKAGE FOR FENESTRATION AND DOORS SHALL BE IN COORDINATE OPENING SIZE GL-1, MTL-4 ACCORDANCE WITH NFRC 400 OR AAMA/WDMA/CSA 101/IS2/A440 OR ASTM E283. AIR WITH VENDOR. LEAKAGE SHALL NOT EXCEED (ALL TESTED AT A PRESSURE OF AT LEAST 1.57 POUNDS ALUMINUM SIDING, MTL-3 uj PER SQUARE FOOT):1. 1.00 CFM/FT2 FOR GLAZED SWINGING ENTRANCE DOORS. ATM AND SURROUND, F.O.I.O. GC TO COORDINATE OPENING SIZE WITH 2. 0.06 CFM/FT2 FOR CURTAIN WALL AND STOREFRONT GLAZING. VENDOR. ATM TO COMPLY WITH ICC A117, 1 SECTION 707 Q 3. 0.20 CFM/FT2 FOR ALL OTHER PRODUCTS. U. AIR BARRIER NOTES SCALE 18 FRONT ELEVATION 1SCA1E0„ 2 LL LL J C.� STONE VENEER: SV-1 - ELDORADO STONE, SIERRA co O O 2.6 2.3 02 1 � I I - STONE VENEER: PRE-FINISHED METAL ALUMINUM SIDING, MTL-3 ' SV-2 - ELDORADO STONE, GREY SKY COPING, MTL-1 PRE-FINISHED METAL x- COPING, MTL-1 EIFS-1 ACCESS HATCH, PAINT TO MATCH EIFS-1 T.O. UPPER PARAPET 20' -3' EXTERIOR INSULATION FINISHING PANEL: EIFS-1 - STO THERM Cl, STO 16292 - T.O. PARAPET _ 19' -3" — — - - — B.O.ACCESS DOOR EXTERIOR INSULATION FINISHING PANEL: 17'- 1 1/4" T.O. DRIVE THRU-CAN LICENSED EIFS-2 - STO THERM Cl, STO 16289 ;, _ 16' -6° ARCHITECT PRE-FINISHED ALUMINUM A 986136 - II I "I• a; CANOPY, MTL-2 LEE DRIFTMIER I- ' • _ - '• >- - - I I • •, - _ • , � .-. -. _•I STATE OFIDAHO METAL COPING/ FLASHING: MTL-1 -AEP SPAN, COOL MIDNIGHT BRONZE = WINDOW LEV�EL REVISION SCHEDULE 10' NO. TYPE REVISION DATE METAL CANOPY: q Q STONE VENEER SILL, SV-2 MTL-2 -CANOPY, BLACK ~ _ - • _ STONE VENEER WAINSCOT, V-1 B.O. SILL I — METAL SIDING: q ~ o +►� MTL-3- LONGBOARD, DARK NATIONAL WALNUT °' cfl ``� I I —� �� —=` ISSUE: CONDITIONAL USE PERMIT LEVEL 1 0.1 ISSUE DATE: 9/18/2024 DRAWN BY: JP BOLLARD, OVER FLOW DRAIN OVER FLOW DRAIN PROJECT MANAGER: MW EP-1 TYP PROJECT NUMBER: 22421 EXTERIOR PAINT: OUTLINE OF DRIVE UP STONE VENEER ELECTRICAL METER EP-1 - SHERWIN WILLIAMS, 7675 SEALSKIN ATM, F.O.I.O COLUMN, SV-1 AND DISCONNECT PER ELECTRICAL SHEET NAME: PNEUMATIC TUBE LANDSCAPE IRRIGATION SYSTEM, F.O.I.O CONTROLLER BUILDING Q. ELEVATIONS M 0 0 EXTERIOR GLAZING: M GL-1 -VITRO, SB70 IGU ARGON FILLED CLEAR cy SHEET NUMBER: N O MATERIAL SCHEDULE SCALE DRIVE THRU- CANOPY ELEVATION 14CA1E LE7XT0„ 4 A3.0