HomeMy WebLinkAboutElevations A3.0 CITY APPROVAL STAMPS
1 O 3 4
DRIFTMIER
EQ EQ A R C H I T E C T S
PRE-FINISHED METAL
COPING, MTL-1 7983 LEARY WAY NE, REDMOND,WA 98052
(425)881-7506 MAIL@DRIFTMIER.COM
PRE-FINISHED METAL COPING, MTL-1
SIGNAGE UNDER SEPARATE EIFS-1 STONE VENEER
PERMIT, PROVIDE POWER SILL, SV-2 T.O. UPPER PARAPET
EIFS-2 PER ELECTRICAL DRAWINGS 20'-3"
1. PAINT ALL COMPONENTS THAT ARE NOT PREFINISHED.
2. ALL PENETRATIONS THROUGH THE WRB OF THE BUILDING FROM BOLTS AND — T.O. PARAPET
OTHER LARGE CONNECTION PIECES (NOT NAILS AND SCREWS)ARE TO BE TREATED = ; , -. , - .- _, ,- -•- _ - ,•- -• � _ - , - - _ , •_- 19'-3'
WITH LIQUID WRB. CANOPY ATTACHMENT
HARDWARE TO MATCH _ _ _ •_ _ B6:3
_ _ _ _ _ _ _3. BUILDING SIGNAGE IS TO BE PROVIDED BY OWNERS VENDOR. GC TO PROVIDE CANOPY FINISH TYP. i7_ EIFS-2
POWER AND BLOCKING FOR INSTALLATION COORDINATE WITH VENDOR. - _ , � `-"'� ;
CANOPY SUPPORT I.
CONNECTION PER DETAIL 7.1
16 ;
'� - 7' 4" 6'-6
SCALE ALUMINUM
EXT. ELEVATION NOTES N/A 17 _ /T
_ r PRE-FINISHED
CANOPY, MTL-2 N
THE FOLLOWING AREAS OF THE BUILDING ENVELOPE SHALL BE SEALED, CAULKED, _ _ _ WINDOW LEVEL
GASKETED OR WEATHER-STRIPPED TO MINIMIZE AIR LEAKAGE (IN ACCORDANCE WITH — ' 10'-0" M
2018 INTERNATIONAL ENERGY CODE): _ uj co
-
I:
1. JOINTS, SEAMS, AND PENETRATIONS OF AIR BARRIER STOREFRONT SYSTEM,
2. JOINTS AROUND FENESTRATION AND DOOR FRAMES. +; , o GL- TL-4
- - STONE VENEER SILL, SV-2 �+
3. JUNCTIONS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AT BUILDING - � _
PRE-FINISHED METAL X " o _
CORNERS, BETWEEN WALLS AND STRUCTURAL FLOORS OR ROOFS, AND BETWEEN O '
WALLS AND ROOF OR ROOF PANELS. FLASHING, MTL-1, TYP. �_ ED
X = 00
,
4. OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH THE ROOFS, WALLS Y B.O. SILL
AND FLOORS. ������� } �\ ����� 3'-0
=� o uj
5. SITE-BUILT FENESTRATION AND DOORS. w
6. BUILDING ASSEMBLIES USED AS DUCTS OR PLENUMS. --cl \ ' �_—� LEVEL 1Lu
Y
7. LIGHT FIXTURE PENETRATION & POWER/DATA OUTLET PENETRATIONS
CANOPY RAIN LEADER ..
8. ALL OTHER OPENINGS IN THE BUILDING ENVELOPE. Z
NIGHT DROP, F.O.I.O. GC TO STOREFRONT SYSTEM, STONE VENEER WAINSCOT, SV-1 z
DOORS AND GLAZING: AIR LEAKAGE FOR FENESTRATION AND DOORS SHALL BE IN COORDINATE OPENING SIZE GL-1, MTL-4
ACCORDANCE WITH NFRC 400 OR AAMA/WDMA/CSA 101/IS2/A440 OR ASTM E283. AIR WITH VENDOR.
LEAKAGE SHALL NOT EXCEED (ALL TESTED AT A PRESSURE OF AT LEAST 1.57 POUNDS ALUMINUM SIDING, MTL-3 uj PER SQUARE FOOT):1. 1.00 CFM/FT2 FOR GLAZED SWINGING ENTRANCE DOORS. ATM AND SURROUND, F.O.I.O. GC TO
COORDINATE OPENING SIZE WITH
2. 0.06 CFM/FT2 FOR CURTAIN WALL AND STOREFRONT GLAZING. VENDOR. ATM TO COMPLY WITH ICC
A117, 1 SECTION 707 Q
3. 0.20 CFM/FT2 FOR ALL OTHER PRODUCTS. U.
AIR BARRIER NOTES SCALE
18
FRONT ELEVATION 1SCA1E0„ 2 LL LL
J
C.�
STONE VENEER:
SV-1 - ELDORADO STONE, SIERRA
co
O O 2.6 2.3 02 1
� I I
- STONE VENEER: PRE-FINISHED METAL ALUMINUM SIDING, MTL-3
' SV-2 - ELDORADO STONE, GREY SKY COPING, MTL-1 PRE-FINISHED METAL
x- COPING, MTL-1
EIFS-1
ACCESS HATCH, PAINT
TO MATCH EIFS-1
T.O. UPPER PARAPET
20' -3'
EXTERIOR INSULATION FINISHING PANEL:
EIFS-1 - STO THERM Cl, STO 16292
- T.O. PARAPET
_ 19' -3"
— — - - — B.O.ACCESS DOOR
EXTERIOR INSULATION FINISHING PANEL: 17'- 1 1/4" T.O. DRIVE THRU-CAN LICENSED
EIFS-2 - STO THERM Cl, STO 16289 ;, _ 16' -6° ARCHITECT
PRE-FINISHED ALUMINUM A 986136
- II I "I•
a; CANOPY, MTL-2
LEE DRIFTMIER
I- ' • _ - '• >- - - I I • •, - _ • , � .-. -. _•I STATE OFIDAHO
METAL COPING/ FLASHING:
MTL-1 -AEP SPAN, COOL MIDNIGHT BRONZE
= WINDOW LEV�EL REVISION SCHEDULE
10' NO. TYPE REVISION DATE
METAL CANOPY: q Q STONE VENEER SILL, SV-2
MTL-2 -CANOPY, BLACK ~
_ - • _ STONE VENEER WAINSCOT, V-1
B.O. SILL I —
METAL SIDING: q
~ o +►�
MTL-3- LONGBOARD, DARK NATIONAL WALNUT °' cfl ``� I I —� �� —=` ISSUE: CONDITIONAL USE PERMIT
LEVEL 1
0.1 ISSUE DATE: 9/18/2024
DRAWN BY: JP
BOLLARD, OVER FLOW DRAIN OVER FLOW DRAIN PROJECT MANAGER: MW
EP-1 TYP PROJECT NUMBER: 22421
EXTERIOR PAINT: OUTLINE OF DRIVE UP STONE VENEER ELECTRICAL METER
EP-1 - SHERWIN WILLIAMS, 7675 SEALSKIN ATM, F.O.I.O COLUMN, SV-1 AND DISCONNECT PER
ELECTRICAL
SHEET NAME:
PNEUMATIC TUBE LANDSCAPE IRRIGATION
SYSTEM, F.O.I.O CONTROLLER BUILDING Q.
ELEVATIONS M
0
0
EXTERIOR GLAZING: M
GL-1 -VITRO, SB70 IGU ARGON FILLED CLEAR cy
SHEET NUMBER: N
O
MATERIAL SCHEDULE SCALE DRIVE THRU- CANOPY ELEVATION 14CA1E LE7XT0„ 4 A3.0