HomeMy WebLinkAboutCC - Applicants Presentation for 9-17
Development Agreement eArchitecturHatch Design September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Modification Hearing
Hatch Design September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Vicinity Map eArchitectur
Hatch Design September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Site Plan eArchitectur
Hatch Design provide the recorded final plat information. for the first structure within such plat." Prior to approval of the project the Final Plat will have to be recorded. Please
Certificate of Occupancy to the release of a responsible for all plat improvements prior 0057 "If the subject property is part of a final plat that has not yet been recorded, the applicant
shall be -2023-Per the CZC AComment1/11/24 2:42 PMMike GrigoryevPlanning 6B.-b. Prior to certificate of occupancy, the applicant shall subdivide the property in accord with UDC 11A
Development Agreement (DA) is required as a provision of annexation of this property…1.Page 22 of Exhibit B6B.-b. Prior to certificate of occupancy, the applicant shall subdivide the
property in accord with UDC 11:5.1. Owner/Developer" shall develop the "Property" in accordance with the following special conditions5. CONDITIONS GOVERNING DEVELOPMENT OF SUBJECT PROPERTY:Page
3 of Development Agreement September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Proposed Modification eArchitectur
Hatch Design September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Paving is scheduled for mid October.•scheduled to be completed on September 26th.for the license agreement.
These items are Additional irrigation engineering was required •Utilities are installed.•construction has started.ACHD has approved the roadway plans and •The right of way has been
dedicated to ACHD.•be considered:installed prior to winter. The applicant asks that the following the North building. The foundation of the building needs to be Condition “b” would
further delay the issuance of the permit for 6B.-c. Prior to certificate of occupancy, the applicant shall subdivide the property in accord with UDC 110061, prior to certificate of
occupancy. -2023-, as approved with LDIRfinaledshall be installed, inspected and The Public Works infrastructure . 0061, prior to the issuance of any building permits-2023-, as approved
with LDIRfinaledThe Public Works infrastructure shall be installed, inspected and b. Section VII and the provisions contained herein. ndscape plan, and conceptual building elevations
included in laa. Future development of the subject site shall be substantially consistent with the proposed concept plan, preliminary plat,the following provisions: nting the annexation.
The DA shall, at minimum, incorporate graThe DA shall be signed by the property owner and returned to the Planning Division within six (6) months of the City Council Conditions of Approval-Staff
Report eArchitectur
Thank you for your time.September 17, 20240034-2024-HFranklin Industrial4160 E. Lanark Street Modification HearingDevelopment Agreement eArchitecturHatch Design Questions?