Loading...
HomeMy WebLinkAbout2024-10-07 Meridian Pathways C-/WENDIAN:--- Parks and Recreation Reviewer: Kim Warren/ Pathways Project Manager Planner Assigned: Nick Napoli Project Name: Black Cat East File No: H-2024-0047—AZ, MDA Date: 9.18.2024 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to final approval the applicant shall dedicate a public access easement for a10'wide multi-use pathway in the landscape buffer parallel to the 1-84 Corridor,continuing north parallel to the fill slope along Black Cat Rd. as far as W. Grand Mogul Dr. Detached 10' wide sidewalks will also be required along the W. Grand Mogul Dr. frontage. Easements shall be a minimum of 14' wide (10' pathway + 2' shoulder each side). Easement need only be dedicated for multi-use pathways that lie outside the public ROW. Use standard City template for public access easement. Submit all easements online through Citizen's Access Portal. 3. Construct multi-use pathways per paving section based on existing site conditions as recommended by project civil engineer in accord with UDC 11-3A-8 and 11-3B-12. Prior to final approval the applicant's engineer shall provide written documentation that the pathway segment was constructed per the recommended specifications. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. 5. 6'high open vision fencing shall be installed between pathways and(live)water irrigation canals and laterals as detailed in the Meridian Pathways Master Plan,Chapter 3, page 3-5. All other fence details per UDC 11- 3A-7. 6. Project developer shall be responsible for obtaining license agreement and other permission(s)as required for constructing within irrigation district easements. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to) override those of the irrigation district having jurisdiction over the project area. Rev.02.11.24