Loading...
HomeMy WebLinkAbout2024-10-01 Nampa Meridian Irrrigation District�J~ i � f • � f � f t � t/ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org October 1, 2024 City Clerk's Office City of Meridian 33 E. Broadway Avenue, Suite 102 Meridhin, ID 83642-2619 RE: H-2024-001 C/ S + C 34 4N 1 W• Barataa Sub To Whom It May Concern: OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) requires a fled Land Use Change Application to review prior to final platting. All private laterals and waste ways must be protected. The Districts Creason Lateral cuts through the south boundary of this project then turns nortli and runs along the west side of this project. The Districts easement for the Creason Lateral at this location is a minimum of sixty feet (60') total, forty feet (40') left and twenty feet (20') right. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before construction is unacceptable. All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the site, NMID must review drainage plans. Developer must comply with Idaho Code 31-3805. Please feel free to contact me for further information. Sincerely, Stev Pardew Development Coordinator Nampa & Meridian Irrigation District SP /eol Cc: Office/ file S. Pardew A. Wolfe Applicant , Lt APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 October 1.2024 City Clerk's Office City of Meridian 33 E. Broadway Avenue, Suite 102 Meridian, ID 83642-2619 492)&&&e 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 RE: H-2024-0035/ Ziggi's Coffee; 4801 S Tavistock Ave To Whom It May Concern: Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced application as no facilities are impacted and plans show storm water is retained on site. All private laterals and waste ways must be protected. All municipal surface drainage must be retained on -site. If any surface drainage leaves the site, NMID will need to review drainage plans. The developer must comply with Idaho Code 31-3805. Please feel free to contact me with any further questions. Sincerely, —ja 1_�_ Steve Pardew Development Coordinator Nampa & Meridian Irrigation District SP/ eol Cc: Office/ file J . :.� APPROXIMATE IRRIGABLE ACRES �• i'; . RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000