HomeMy WebLinkAbout2024-10-01 Nampa Meridian Irrrigation District�J~
i � f • � f � f t � t/
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
October 1, 2024
City Clerk's Office
City of Meridian
33 E. Broadway Avenue, Suite 102
Meridhin, ID 83642-2619
RE: H-2024-001 C/ S + C 34 4N 1 W• Barataa Sub
To Whom It May Concern:
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) requires a fled Land Use Change Application to review
prior to final platting.
All private laterals and waste ways must be protected. The Districts Creason Lateral cuts through the
south boundary of this project then turns nortli and runs along the west side of this project. The
Districts easement for the Creason Lateral at this location is a minimum of sixty feet (60') total, forty
feet (40') left and twenty feet (20') right.
This easement must be protected. Any encroachment without a signed License Agreement and
approved plan before construction is unacceptable.
All municipal surface drainage must be retained on site. If any municipal surface drainage leaves the
site, NMID must review drainage plans. Developer must comply with Idaho Code 31-3805. Please feel
free to contact me for further information.
Sincerely,
Stev Pardew
Development Coordinator
Nampa & Meridian Irrigation District
SP /eol
Cc: Office/ file
S. Pardew
A. Wolfe
Applicant
, Lt
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
October 1.2024
City Clerk's Office
City of Meridian
33 E. Broadway Avenue, Suite 102
Meridian, ID 83642-2619
492)&&&e
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
RE: H-2024-0035/ Ziggi's Coffee; 4801 S Tavistock Ave
To Whom It May Concern:
Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced
application as no facilities are impacted and plans show storm water is retained on site.
All private laterals and waste ways must be protected. All municipal surface drainage must be
retained on -site. If any surface drainage leaves the site, NMID will need to review drainage
plans. The developer must comply with Idaho Code 31-3805.
Please feel free to contact me with any further questions.
Sincerely,
—ja 1_�_
Steve Pardew
Development Coordinator
Nampa & Meridian Irrigation District
SP/ eol
Cc:
Office/ file
J .
:.�
APPROXIMATE IRRIGABLE ACRES
�• i'; . RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000