Loading...
HomeMy WebLinkAbout2024-09-26 Boise Project Board of ControlFRED BUTLER CHAIRMAN OF THE BOARD RICHARD MURGOITIO VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER BOISE PROJECT BOARD OF CONTROL (FORMERLY BOISE U.S. RECLAMATION PROJECT) City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian ID, 83642 2465 OVERLAND ROAD BOISE, IDAHO 837 31 f CITY CI rr;<,^ OFFICE 26 September 2024 RE: Apex Phenominal Subdivision E. Lake Hazel and Apex Avenue Meridian Boise -Kona Irrigation District Farr Lateral 140+05 McBirney Lateral 05+00 Sec. 31, T3N, R1E, BM. Sonya Allen: H 2O2d-00-11 OPERATING AGENCY FOR 187,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX:(208) 344-1437 There are no Boise Project or Boise-Kuna Irrigation District facilities located on the above -mentioned property, however it does in fact possess a valid water right. Boise Project Board of Control must approve any requests and/or relocation of delivery points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. The Watkins Drain is private and not under the jurisdiction of Boise Project or Boise- Kuna Irrigation District. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a hard copy of all plans that must include the irrigation and drainage plans. Whereas this property lies within Boise-Kuna Irrigation District it is important that representatives of this development contact the BKID office as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the Boise -Kona Irrigation District and the City of Meridian as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right require changes when our easements and/or facilities are affected by unknown factors even during the construction phase. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. 17116mas Ritthaler Assistant Project Manager, BPBC for/tr cc: Kevin Reeves Watermaster, Div; 2 BPBC Alicia Havel Secretary -Treasurer BKID File