Loading...
HomeMy WebLinkAboutCC - Storm Drainage Calcs Prepared For: Prescott Ridge Subdivision No. 5 Prescott Ridge Properties, LLC & City of Meridian, and ACHD Meridian, Idaho Storm Drainage Report cc pt�AL E G 22114 0 F Prepared By: Bryan Redsun, P.E. Project Manager KM Engineering, LLP 5725 N. Discovery Way Boise, I D 83713 208.639.6939 bredsun@kmengllp.com lCM August 2024 ENGINEERING Project No: 24-188 TABLE OF CONTENTS Introduction ................................................................................................................................. 1 ProjectDescription ...................................................................................................................... 1 SiteDescription............................................................................................................................... 1 Scopeand Methods ...................................................................................................................... 1 Existing Drainage Conditions .......................................................................................................... 1 Proposed Drainage Conditions and Analysis .................................................................................. 1 Sandand Grease Traps ................................................................................................................... 2 DiversionBoxes............................................................................................................................... 2 Inletand Gutter Capacities............................................................................................................. 2 SeepageBeds.................................................................................................................................. 2 Summary......................................................................................................................................... 3 APPENDICES Appendix A - Figures Figure 1 -Vicinity Map Figure 2 - Post-Development Drainage Map Figure 3—Storm Water Improvement Plans Appendix B - Tables Table 1 - Peak Flow Rate Summary Appendix C - Calculations Post-Development 25/100-year Calculations Sand and Grease Trap Calculations Inlet and Gutter Capacities Vertical Sand Filter Calculations Seepage Bed Calculations Appendix D - Geotechnical Engineering Report Geotechnical Recommendations Report Prescott Ridge Subdivision, SITE Consulting, LLC 9/9/2021 Mid-Season Groundwater Report Prescott Ridge Subdivision, SITE Consulting LLC., 7/31/2023 INTRODUCTION The purpose of this report is to show that the storm drainage facilities for the proposed Prescott Ridge Subdivision No. 5 (Project) are designed to meet the Ada County Highway District (ACHD) and the water quality requirements of the Idaho Department of Environmental Quality (DEQ). This report has been prepared at the request of the developer, Hubble Homes, LLC. PROJECT DESCRIPTION The Project consists of the fifth phase of a residential subdivision that includes 49 lots: 46 attached residential lots and 3 common lots. The proposed improvements to the site include roadways, sidewalks, lot grading, and site utilities. SITE DESCRIPTION The Project site is located south of W. Chinden Blvd. and east of N. McDermott Rd., Meridian, Idaho. See Appendix A, Figure 1 for a vicinity map of the project. The proposed Project area is ±4.68 acres. SCOPE AND METHODS The Rational Method is the standard method for small catchments and was used to calculate pre-development and post-development peak runoff rates and runoff volumes. The Rational Method provided in the attached calculation sheets was used to calculate the storm water volumes and flow rates for this project (see Appendix C - Calculations). Flow rates and storm volumes were established for each basin for the 25-year and 100- year storms. Refer to Appendix B, Table 1 - Peak Flow Rate Summary, for a summary of flow rates. Calculations for sand and grease traps, diversion structures, inlets and gutters, and seepage beds were completed to verify capacity. EXISTING DRAINAGE CONDITIONS The pre-project watershed consists of primarily farmland and is currently irrigated through ditches and furrow irrigation. The flow path for the existing drainage basin involves overland sheet flow from north to south. There are existing storm drainage facilities in place to reduce the peak runoff volumes within ACHD Right-of-Way within Prescott Ridge Subdivision No. 1 and Prescott Ridge Subdivision No. 3. PROPOSED DRAINAGE CONDITIONS AND ANALYSIS The proposed drainage system improvements consist of roadway inlets and gutters, sand and grease traps, and seepage beds. The post-development site was broken into 2 basins as shown in Appendix A, Figure 2 - Post-Development Drainage Map. Three basins are existing, and are either being reduced or remained constant in acreage. The land use type and runoff coefficients for each basin are listed in Table 2 in Appendix B. Each basin was delineated according to the tributary area draining to each drainage structure or facility such as gutter, catch basin inlet, etc. For individual sub-basin peak flow calculations, in addition to combined sub-basin peak 1 flows used for downstream facility sizing and analysis, see Table 1 (Peak Flow Rate Summary). Storm water runoff consists of overland sheet flow over short grass and is then conveyed with curb and gutter to catch basin inlets before entering a pipe network. Once runoff reaches the pipe network, it is conveyed to the sand and grease traps used as pretreatment facilities before entering the seepage beds. SAND AND GREASE TRAPS The proposed drainage design includes 5 sand and grease traps used as pretreatment facilities for the water quality storm event. All sand and grease traps are 1,000 gallon vaults, and all have been sized for a maximum velocity of 0.5cfs for the 100-year storm event with a minimum detention time of 40 seconds. Please refer to Appendix C - Sand and Grease Trap Calculations. INLET AND GUTTER CAPACITIES The catch basin inlets should be built per the details shown on the civil construction plans. There is a total of 4 inlets, one for each drainage basin where storm water is routed to a seepage bed. Based on our calculations, all inlets will require a single sump grate inlet. The gutter capacity of the proposed roadways was verified to ensure that overtopping of the curb would not occur in the 25-year and 100-year storm event (refer to Appendix C— Inlet and Gutter Capacities). SEEPAGE BEDS The Project includes 2 seepage beds (2 existing and 2 new) that should be built per the details shown on the civil construction plans. Based on our calculations,the seepage beds are adequately sized to ensure that no ponding occurs on the surface and that the volumes required to retain the 100-year storm event are met. The invert elevation of the seepage beds was set above the estimated high groundwater level based on the "Mid-Season Groundwater Report" prepared by SITE Consulting, LLC, dated July 31, 2023. Once the sizes of the seepage beds were calculated,the times necessary for the 100-year storm events to be infiltrated into the ground were calculated at less than 120 hours for each of the seepage beds. The Geotechnical Engineering Report measured infiltration rates at 4 inch/hour, which was used in the design of the seepage beds. The calculations included with this report show the volumes that are required to be retained for the 100-year storm and the drain time through the bottom of the seepage beds, refer to Appendix B—Tables and Appendix C—Vertical Sand Filter Calculations. 2 SUMMARY This report determines that the Project storm water design sizing and analysis conforms to ACHD and storm water design criteria. The post-development storm water runoff for the proposed residential lots and the roadway, curb and gutters, and sidewalks should be completely retained onsite through the proposed seepage beds or routed through the detention pond and released below the allowable rate. 3 APPENDIX A - FIGURES �P c� z —U.S.HIGHWAY 26 PROJECT SITE 0 w �p z p cc F Li W.MCMILLAN RD 0 a a ti x x p o H LL � v a Y d J F m 0 z 3 0 a N O N n N n Y N Y Y C Q Y l7 p 0 2000 4000 6000 Z Plan Scale: 1" = 2000' X E N G I N E E R I N G v 9233 WEST STATE STREET a PHONE(08)639-6939 PRESCOTT RIDGE SUBDIVISION NO. 5 kmengllp.com v MERIDIAN, IDAHO p DATE: 7/27/24 > PROJECT: 24-188 ti SHEET: FIGURE 1 a 1 OF 1 VICINITY MAP APPENDIX B - TABLES Figure 3 - Storm Drainage System Summary (ACHD IDF) Table 1 - Pre & Post-Development Peak Flow Rate Summary Basin Properties Peak Flow Rate C A Tc i25 i100 Q25 Q100 Acres min. in/hr in/hr cfs cfs Basin A 0.80 1.10 10.0 1.85 2.58 1.62 2.26 Basin B 0.77 0.32 10.0 1.85 2.58 0.46 0.64 KM Engineering,v2.3 Page 1 of 1 24-188 Storm Drainage System Summary Template v2.5 APPENDIX C - CALCULATIONS SAND AND GREASE TRAP CALCULATIONS ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. 1 Project Name Prescott 5 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area(ft2) 0.5 fps Velocity S/G Traps Q-cfs (inch) (inch) max. ok? 1000 G 1 1.55 20 60 8.33 0.19 YES Reference for Throat widths(inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 P:\24-188\Civil\Calculations&Reports\Storm Drainage\Calculations\ACHD_SD_CALCS_112018 8/27/2024,2:52 PM Version 10.5, November 2018 INLET AND GUTTER CAPACITIES Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Aug 27 2024 <Name> Gutter Highlighted Cross SI, Sx (ft/ft) = 0.020 Depth (ft) = 0.25 Cross SI, Sw (ft/ft) = 0.080 Q (cfs) = 0.940 Gutter Width (ft) = 6.00 Area (sqft) = 0.39 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.41 Slope (%) = 0.50 Wetted Perim (ft) = 3.38 N-Value = 0.013 Crit Depth, Yc (ft) = 0.27 Spread Width (ft) = 3.13 Calculations EGL (ft) = 0.34 Compute by: Q vs Depth No. Increments = 10 Elev (ft) Section Depth (ft) 101.00 1.00 100.75 0.75 100.50 0.50 100.25 0.25 100.00 0.00 99.75 -0.25 0 1 2 3 4 5 6 7 8 9 Reach (ft) SEEPAGE BED CALCULATIONS ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak QV"tab Steps for Seepage Beds Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Prescott 5 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100'QV' 4 Weighted Runoff Coefficient C 0.55 Link to: LQv 5 Area A(Acres) 1.10 acres QV TR55 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? Yes V 2,082 ft3 0%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 3.5 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 4.00 in/hr 12 Size of WQ Perf Pipe(Pert 180°) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe(Perfs 3601),READ if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 26.2 ft3/ft 15 Calculate Design Length L 0 ft 0 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 0 ft 17 Variable Infiltration Window W SWW 15.0 it 18 Time to Drain 0.0 hours 90%volume in 48-hours minimum OK 19 Length of WQ&Overflow Perf Pipes 0 it 20 Perf Pipe Checks.Qperf>=Qpeak; NO where Qperf=CdxAxV(2xgxH) d 0.0313 ft Optional Storage Chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90%volume in 48-hours minimum #DIV/01 P:\24-188\Civil\Calculations&Reports\Storm Drainage\Calculations\ACHD_SD_CALCS_112018 8/27/2024,2:33 PM Version 10.5,November 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak QV"tab Steps for Seepage Beds Calculate Post-Development Flows(for pre-development flows,increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Prescott 5,Facility 2 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100'Q V2' 4 Weighted Runoff Coefficient C 0.55 Link to: Qv ra�2�i 5 Area A(Acres) 0.16 acres QV TRSS 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 381 ft3 25%Sediment 8 Set Total Design Width of All Drain Rock W 10.0 ft 9 Set Total Design Depth of All Drain Rock D 3.0 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 in/hr max) Perc 4.00 in/hr 12 Size of WQ Perf Pipe(Pert 180°) Dia pipe 18 in 1.8 13 Size of Overflow Perf Pipe(Perfs 3601),READ if Q100>3.3 cfs in 0.0 14 Calculate Total Storage per Foot Spf 15.5 ft3/ft 15 Calculate Design Length L 0 ft 0 Override Value Required for Chambers 16 Variable Infiltration Window L SWL 0 ft 17 Variable Infiltration Window W SWW 10.0 it 18 Time to Drain 0.0 hours 90%volume in 48-hours minimum OK 19 Length of WQ&Overflow Perf Pipes 0 it 20 Perf Pipe Checks.Qperf>=Qpeak; NO where Qperf=CdxAxV(2xgxH) d 0.0313 ft Optional Storage Chambers Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft3/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ft3/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft2 9 Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0! hours 90%volume in 48-hours minimum #DIV/01 P:\24-188\Civil\Calculations&Reports\Storm Drainage\Calculations\ACHD_SD_CALCS_112018 8/27/2024,2:33 PM Version 10.5,November 2018 APPENDIX D - GEOTECHNICAL ENGINEERING REPORT Geotechnical recommendations report Prescott Ridge Subdivision, SITE Consulting, LLC. (9/9/2021) DocuSign Envelope ID:62CA81D313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Mitch Armuth August 9, 2021 Providence Properties, Inc. Page 1 of 24 701 South Allen Street #100 File 21821-B Meridian, Idaho 83642 Re: Geotechnical Recommendations Report Prescott Ridge Subdivision Chinden and McDermott Meridian, Idaho Mitch: As per your authorization, in May 2020, SITE personnel logged and sampled thirteen test pits at your proposed Prescott Ridge Subdivision project. Based upon our research, observations, and field and laboratory test results, the site is acceptable for the proposed residential subdivision development. Recommendations for construction are included herein. We appreciate this opportunity to be of service. When appropriate, we would like to discuss continuing our role as geotechnical consultant during construction. Please contact our office if additional information or services are required. Respectfully submitted, SITE Consulting, LLC Bob J. Arnold, PE DocuSigned by: pMAL �p1STEq� 4 eO�rE cF e J. Ra� 08/10/2021 1847 AM MDT -I a� un a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Geotechnical Recommendations Report Prescott Ridge Subdivision Chinden and McDermott - Meridian, Idaho INVESTIGATION On May 27, 2020, SITE observed the excavation of thirteen test pits at locations intended to provide full coverage of the subject property. Additional land was subsequently added to the west end of this development. Access to this new section has been limited by the presence of crops and wet field conditions. It is not anticipated that new or different conditions are present in this added land area. Test pit logs and an aerial photo with test pit locations are included in the Appendix. In general, soils varied across the planned development and consisted of a low plastic silty clay, lean clay, silty clay, or silty clay with sand with a 6-8-inch rootzone or organic layer. These layers varied from one to five feet thick in our test pit locations. Below these surface layers, SITE encountered interbedded alluvial deposits of silts or sandy silts to silty sand with gravel, gravel with sand, or gravel with silt and sand soils that extend to one to twelve feet deep. Sand with silt and gravel, silty sand with gravel, or gravel with silt and sand was encountered below these layers and extend to the bottom of our test pits at ten to fourteen feet deep. The lower sand and gravel materials are the sand and gravel materials of the Whitney Terrace, the second Terrace above the Boise River flood plain. Groundwater was encountered at 10-14 feet within the area of the subject property. Monitoring wells were installed in the test pits for future measurements. Measurements occurred weekly through the end of the 2020 irrigation season and are ongoing this season. It is noted that groundwater was observed as shallow as five feet deep in the south end of the property, in September 2020. 2021 groundwater data is still being gathered and will be reported separately. Well logs for the subject property and adjacent properties were located on the IDWR website. These well logs are included in the Appendix and confirm the soil profile described above and reported a depth to static groundwater of 10-23 feet. bz b o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC RECOMMENDATIONS Site Work Grubbing depths of up to 6 to 8 inches can be anticipated to remove most organic materials. Roots may exist as deep as two feet below the ground surface where large trees and ditches are or were located. Therefore, stripping depth is to be adjusted in the field at the time of construction. Excavations caused by demolition, grubbing of ditches, or over excavation of soft or wet areas are to be backfilled with structural fill. All subgrade soils present in the test pits can be used as structural fill on building lots and within right of ways. If encountered, blending clay surface soils with onsite or imported sand or sand and gravel will improve surface drainage. Compaction of any fill placed within building pads or right of ways must exceed 95% of the maximum dry density as determined by ASTM D698, Standard Proctor testing. It should be anticipated that the City of Meridian Engineering and / or Building Department will request these test results prior to or at the time of home construction. Structural fill must pass compaction testing and visual inspection for stability. Fill that passes compaction but is observed to rut or deflect under construction traffic is to be rejected. Pavement Sections Based upon a design R-Value of R=20 and a traffic Indexes of TI=6 (residential street) and TI-8 (McDermott Road), the following pavement sections are recommended. All materials and methods used in the construction of streets and sidewalks are to comply with ACHD and ISPWC requirements. Traffic Index TI=6 TI=8 H MA 2.5" 3.0" 1/" Base 4.0" 4.0" Subbase 10.01, 11.01, ACHD is to be contacted to confirm TI values for McDermott Road and other streets classified as collectors. State of Idaho ITD is to be contacted concerning improvements to Chinden Boulevard. Cz C a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Residential Foundation System It is assumed that crawlspace excavation will exceed the historical cultivation depth by farm equipment. If loose soils are present after a crawlspace is excavated, re- compaction is required. The proposed single-family residential structures may be supported on conventional, continuous, and isolated pad foundations founded upon acceptable native soils or upon structural fill extending to these soils. Based upon proper placement and compaction of structural fill, bearing pressures of up to 1500 psf are allowed for foundations founded on the native soils or upon properly placed and compacted structural fill. Foundations are to be embedded a minimum of 24" below adjacent grade for frost protection. Outside all crawlspace or basement areas, the construction joint between footing and foundation walls are to be sealed with mopped or brushed on asphalt-based mastic foundation sealer. Foundation drains are not required but complete roof gutters are recommended. Slab on Grade Concrete Care must be taken so that all excavations below both interior and exterior slab on grade concrete are properly backfilled in accordance with the structural fill recommendations. Trenches and wall backfill areas are to be filled in lifts and benched each lift so that fill is not placed against a vertical soil face greater than three feet tall. Areas of excessive yielding should be excavated and backfilled with structural fill. Any fill used to increase the elevation of slab on grade concrete should meet the requirement for structural fill. Slab on grade floors, sidewalks and pavements should be placed atop a mat of at least 0.5 feet of granular structural fill materials. This depth is to increase to one foot when concrete is to be placed over clay soil. This is required to prevent seasonal heaving of sidewalks, patios, and driveways. Mat material should all pass a 3/4-inch sieve and should contain less than seven percent passing the # 200 sieve. The mat shall be compacted to the requirement for structural fill. d" Cz C a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Storm Water It is recommended that storm runoff be directed away from all open excavations and not be allowed to puddle on subgrade soils. Based upon onsite soil testing, SITE recommends a design percolation rate of P=4 inches per hour with a drain time of less than 24 hours for facilities over-excavated to the groundwater and backfilled with free draining materials. ACHD policy is that perc rate is to be confirmed at the time of construction. Inspection & Testing A qualified engineer or his representative should monitor fill placement to ensure the work is performed in accordance with these recommendations. For mass filling, field nuclear moisture - density testing shall be performed on each lift of compacted fill for every 5000 square feet of surface area or one test per filled lot. Trench backfill and right of ways are to be tested to ACHD/ISPWC requirements. It is noted that structural fill can pass compaction tests and still be unacceptable if pumping, rutting, or deflecting under vehicle or foot traffic. General Comments After the plans and specifications for construction are completed, it is recommended that this consultant be provided the opportunity to review the final design and specifications. This review will confirm that the earthwork recommendations have been properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This review is a part of this service and will not result in additional invoicing unless additional research and recommendations are needed. Testing and inspection services are recommended herein. Proper quality control during construction is required to confirm materials and methods and thereby obtain a desirable finished product. Monitoring and testing should also be performed to verify suitability of materials used for structural fills and to confirm proper demolition, subgrade grubbing, subgrade stability, and proper placement and compaction of fills. Any deviations from the herein described subsurface conditions must be brought to the attention of this consultant. This report has been prepared for the exclusive use of the client and their retained design consultants. Findings and recommendations within this report are for specific application to the proposed construction described herein and apply only to the property identified. Appendix Follows » V to Cz a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC APPENDIX Location Aerial Preliminary Plat Plan Aerial Photo with Test Pit Locations Test Pits Logs (13) Soil Log Legend /Abbreviations and Acronyms R-Value Report IDWR Well Logs (4) Pavement Section Calc Sheets Cz a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Location Aerial w. tR' a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CAM313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Preliminary Plat yy v u li��I a�srvu�nuy lu:v-nuv ni vri iyao FRO 111111+1 $+1 -1 €eS s - oear�una•u i n s mo a a S x _ o I c ! ➢ MIN] C 'QY LLOkR3W R'H_ 1� � el1rt �i 4 @$®Ae6p8 6"11W�04100009 Ap 6 Q @ Q @ Oe $ 5 • MI.•nR O a i �r f @ A'9 6Y o I ell e - � x i o �$Ilt I�I I i`■■` li �� � � � �o 7 4 v 11 WIR t C. � D a W a g z!� ' ' 2 v@ o e jr do ICI �� ' _ z 00 Q cz a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Locations ry _�. i r • r �l r i •- tl -ems a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-1 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 #10 #40 #100 #200 %M LL PI 0.0-1.5 Brown,Moist, Firm-SILTY CLAY(CL-ML) with Root Zone/Organic Layer 6-8" 1.0 1 1 1 100 98.9 93.1 86.3 21.0 30 6 1.5-6.0 Brown,Moist, Firm,Cemented,SANDY SILT(ML) 3.0 1 1 1 100 1 96.0 1 92.9 84.4 67.7 53.3 30.1 NP NP 6.0-12.0 grown/Red/Tan/White, Moist, Firm,Sand,Gravel, Cobble Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed Test it Log Test Pit: TP-2 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 #10 #40 #100 #200 %M LL PI 0.0-2.5 Brown,Moist, Firm,Silt,Sand with Root Zone/Organic Layer 6-8" 2.5-8.0 Brown,Moist, Firm,Cemented,Sand,Silt 8.0-12.0 Brown,Sand,Gravel,Cobble Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed 0 r-1 az un o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-3 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-3.0 Brown,Dry,Soft, Blocky, LEAN CLAY(CL) with Root Zone/Organic Layer 6-8" 1.5 1 1 1 1 100 99.5 95.9 90.5 19.9 33 14 3.0-8.0 Brown,Moist, Firm,SILTY SAND WITH GRAVEL(SM) 5.0 1 1 100 1 98.6 1 96.8 1 94.0 1 86.6 75.5 48.3 24.4 NP NP 8.0-12.0 Brown/Tan, Dry, Firm-SAND WITH SILT AND GRAVEL 10.0 1 100 1 76.3 1 71.4 1 69.4 1 68.2 1 38.7 8.8 5.8 5.2 NP NP Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed Test it Log Test Pit: TP-4 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/81' 1 #4 1 #10 1 #40 #100 #200 %M LL PI 0.0-1.5 Brown,Dry, Firm,Blocky,Clay, Silt with Root Zone/Organic Layer 6-8" 1.5-7.0 Brown/Tan, Dry,Soft,SILTY SAND WITH GRAVEL(SM) 4.0 1 1 100 1 84.6 1 76.0 1 67.2 56.5 31.0 17.1 15.8 NP NP 7.0-12.0 Tan,Moist,Firm-GRAVEL WITH SILT AND SAND 10.0 1 100 1 44.5 1 22.0 1 17.2 1 13.4 10.2 7.8 6.4 15.6 NP NP Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed r-1 az un o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-5 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 1 #40 #100 #200 %M LL PI 0.0-2.0 Brown,Moist, Firm,SILTY CLAY WITH SAND(CL-ML) with Root Zone/Organic Layer 6-8" 1.0 1 1 100 1 98.9 95.9 90.4 85.2 79.3 18.2 29 7 2.0-4.5 Tan, Dry, Firm,GRAVEL WITH SAND 3.0 1 1 100 1 49.1 1 20.4 10.9 4.6 3.0 2.0 18.3 NP NP 4.5-12.0 Brown/Red,Moist,Firm,GRAVEL WITH SILT AND SAND 9.0 1 1 100 1 55.4 1 41.0 1 33.8 1 21.3 13.6 10.3 8.8 NP NP Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed Test it Log Test Pit: TP-6 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/81' 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-2.0 Brown,Moist,Clay,Silt with Root Zone/Organic Layer 6-8" 2.0-6.0 Brown/Tan, Moist,Firm,Cemented,Silt,Sand 6.0-12.0 Brown,Moist, Firm,Sand,Gravel,Silt Bottom of Excavation @ 12.0 12.0 Ground Water Not Encountered Monitoring Well Installed bz b o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-7 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 1 #40 1 #100 #200 1 %M I LL I PI 0.0-3.0 Brown,Moist,Soft,Sticky,Silt,Clay,Sand with Root Zone/Organic Layer 6-8" 3.0-9.0 Brown/Tan, Moist,Firm,Cemented SILTY SAND WITH GRAVEL(SM) 6.0 1 100 1 92.5 1 67.2 1 61.1 1 57.9 1 49.7 1 27.7 17.3 17.6 NP NP 9.0-11.0 Tan,Moist,Firm,Sand,Gravel,Silt 11.0-13.0 Brown/Tan,Wet,Sand,Gravel Bottom of Excavation @ 13.0 13.0 Ground Water Encountered @ 11.0 Monitoring Well Installed Test it Log Test Pit: TP-8 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/81' 1 #4 1 #10 1 #40 1 #100 1 #200 1 %M LL PI 0.0-1.0 Brown,Moist, Firm,Silt,Sand with Root Zone/Organic Layer 6-8" 1.0-7.0 Tan, Dry, Firm,SANDY SILT(ML) 4.5 1 1 100 1 97.7 1 92.9 86.4 75.5 64.1 54.7 25.7 NP NP 7.0-14.0 Brown/Red,Moist,Firm,Sand,Gravel,Silt Bottom of Excavation @ 14.0 14.0 Ground Water Encountered @ 14.0 Monitoring Well Installed bz b o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-9 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-3.5 Brown,Moist,Soft,Blocky,Silt,Clay with Root Zone/Organic Layer 6-8" 3.5-7.0 Brown,Moist, Firm,GRAVEL WITH SILT AND SAND 5.0 1 1 100 1 50.4 1 42.3 1 36.2 16.8 11.2 9.5 6.3 22 2 7.0-12.0 Brown,Wet, Firm,Sand,Gravel,Silt Bottom of Excavation @ 12.0 12.0 Ground Water Encountered @ 10.0 Monitoring Well Installed Test Pit Log Test Pit: TP-10 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/81' 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-5.0 Brown,Moist, Firm,Sticky,SILTY CLAY(CL-ML) with Root Zone/Organic Layer 6-8" 2.5 1 1 100 1 99.5 1 99.4 95.5 89.8 85.6 33.1 24 5 5.0-9.0 Brown,Moist, Firm-GRAVEL WITH SILT AND SAND 7.0 1 100 1 63.3 1 45.0 1 36.5 1 32.2 1 22.5 12.4 10.7 9.6 NP NP 9.0-12.0 Brown,Wet, Firm,Sand,Gravel Bottom of Excavation @ 12.0 12.0 Ground Water Encountered @ 10.0 Monitoring Well Installed r-1 az un o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Test Pit Log Test Pit: TP-11 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 #40 #100 #200 %M LL PI 0.0-2.0 Fill-Brown,Moist,Clay,Silt with Observed Trash 2.0-4.5 Brown,Moist,Cemented,Silt,Sand 4.5-13.0 Brown/Red,Saturated,Sand,Gravel,Silt,Cobble Bottom of Excavation @ 13.0 13.0 Ground Water Not Encountered Monitoring Well Installed Test Pit Log Test Pit: TP-12 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/81' 1 #4 1 #10 1 #40 1 #100 1 #200 1 %M I LL I PI 0.0-3.5 Brown,Moist,Clay,Silt,Sand with Root Zone/Organic Layer 6-8" 3.5-13.0 Brown/Red,Saturated,Sand,Gravel,Silt,Cobble Bottom of Excavation @ 13.0 13.0 Ground Water Not Encountered Monitoring Well Installed Test it Log Test Pit: TP-13 File#: 21821-B Client: Providence Properties Date Excavated: 05/27/20 Project: Prescott Property Excavated By: Wagoner Location See Aerial Photo Logged By: J. Meusch, PM -SITE DEPTH SOILS DESCRIPTION (feet) 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 1 #10 1 #40 1 #100 1 #200 1 %M LL PI 0.0-5.0 Brown,Moist,Clay,Silt,Sand with Root Zone/Organic Layer 6-8" 5.0-10.0 Brown/Red,Saturated,Sand,Gravel,Silt,Cobble Bottom of Excavation @ 10.0 10.0 Ground Water Not Encountered Monitoring Well Installed un o. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA81D313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC Soil Log Legend UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM STANDARD TEST METHOD D 2487 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES) MAJOR DIVISIONS TYPICAL DESCRIPTIONS GRAVEL& <5%-#200 GW Well-graded gravel,gravel-sand mixture, little or no fines. GRAVELLY F—GP-11 Poorly graded gravel,gravel sand mixture,little or no fines COARSE SOILS 5-12%-#200 jF—GM—JFS—iIty gravel,gravel-sand-silt mixtures GRAINED <50%-#4 >12%-#200 =1 Clayey gravel,gravel-sand-clay mixtures SOILS SAND& <5%-#200 SW Well-graded sand,gravelly sand, little or no fines. <50%-#200 SANDY =1 Poorly graded sand,gravelly sand,little or no fines SOILS >12%-#270050IFS—M-11 Silty sand,sand-silt mixtures >50%-#4 1=1 Clayey sand,sand-clay mixtures SILTS& FINORGANIC ML Inorganic silt and very fine sand, rock flour,silty or clayey fine 1 sand or clayey silt with slight plasticity FINE CLAYS CL Lean clay-low to medium plasticity,gravelly,sandy,or silty clay GRAINED LL<50% ORGANIC OL Organic silt and organic silty clay of low plasticity SOILS SILTS& F—M-H-1 I Elastic silt,micaceous or diatomaceous fine sand or silty soil. >50%-#200 CLAYS CH Fat clay-high plasticity LL>50% ORGANIC OH Organic clay-med.or high plasticity: organic silt HIGHLY ORGANIC SOILS PT Peat, humus,swamp soil with high organic content Abbreviations And Acronyms ASTM American Society for Testing and Materials IBC International Building Code ISPWC Idaho Standard for Public Works Construction ITD Idaho Transportation Department IDWR Idaho Department of Water Resources NP Non-Plastic PCC Portland Cement Concrete TP Test Pit USCS Unified Soil Classification System cf Pounds per Cubic Foot sf Pounds per Square Foot tsf Tons per Square Foot sf/f Pounds per Square Foot/ Foot bL Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC R-Value Report aJrD Pavemew Engineering Inc. T�adrA'rgp+S+cnmwVa+Ban f..��Qd+u� C4a0N? SiN Ix G�ANrIF RESISTANCE lR)VALUE TEST ASTM D 2844 Laboratory No.: 1-202875 Project No.: 200021 Sample Date: January 0.19t70 Report Date: October 28,2020 Client: Sate Consuitina LLC Prajecl Name: 2020 La37arato(VTesting Sample Description: Brown Clayey Silt Sample Location: Wa 100 ——— ——— --- ——— --- --- --- 90 tv 70 2 60 > -- -- -- -- — — 50 U 40 . u3 — — -- — 30 — 20 800 700 600 500 400 300 200 100 0 Exudation Pressure (P.S.I.) Resistance Value Test —300 P-S.I. Specimen No- 4 5 6 Moisture Content(%) i9.1 17.9 18.5 Dry Density(PCF? 100.E 103.6 103.2 Resistance Valua R 18 39 30 ExudaOon Pressure(PSI) 135 501 319 Expansion Pressure 95 204 152 As Received Mc;sture Content{4 i 6.6 RESISTANCE VALUE AT 300 P.S.I. 29 R Reviewed By ~ Brandon Rodebsugh ^� !16 Materials Engineer sew+na C'sonMJ4 ore Co T087 qlllllllll UrW�w p QrnonYonr}noJU-Ynq Gprrn ILI- M Cz a. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC IDWR Well Log Subject Property J -j f 62721 Fnyrrc IDAHQ IEPARTMEM1ET OF W4TE1[FIESIJRCS 3' ONice[Jae Only { WELL DRILLER'S REPORT Inspectedhy I / Use7 evedtarorbalWinlPen Twp—Rge Sec U _ _114 1}4_1}A 1.DRILLING PEPUFT NO. -. - / -E'er 11.WELL TeM' t; Long 0". 1 iDWR M -PUrrip -Wilw Ir Flnelnp Arlezw 2.OWNER: Ynopa.mu. ore d— P la..a. nme Addrar. 9,.Q 10 1A 0 r L P,Vt; �7 G�Ir_=.f�.�L.�r.�1.111,'✓ —.^�;,I����?,71n .7 ��.�. Vhur Tnrnp _ Bottum dcole lamp. 3.LOCATION OF WELL by legal description: vramwatw&y*m or eemment& Sketch reap locahop mialagree Mth mitten iw_arirm. Dmoh hzl WaterEriummtwiid 12.LITHOLOGIC LOG; IDtwlbd fepArut or EidedvnrrWKr* Wtbr aO`° F— Iu nMlt w Lmmlom-Ware 0"uv A r mid Y rr Twp. HGr1F1 or Routh � _ _ _ �" tu p° r Rge. Fast o :a sea va 1 1Jdz?' A -- fl vL Lot C:ouir A nA� 1- 3 Address Di wall sl /0 C-Ifll/ z4A<' w nlww..wamd.orrwar.rar+w�7 *25 "AK-49A9 U 13k 81rb.Name 4.USE: ]XDrsnssdc C rMplidpa0 D mnnor —Irragaimn =Thennol _Injenk�r l CNhnr _ 5.`�TYPE OF WORT[check air that apply IRWaaarilerd ete.} F' Nw-Wes L YloWy 0 ►iborrdormwf - COwr— tL DAIL4 METHOD Fir AoNW =CEI]k ❑ Mud�pIYrY G Qrnpr 7-SEALING PROCEDURES FEi.rkTTA aaGf d}nGH1T V.t1F•r7o Ff NW AI Fa.rl 4n firtldw �{7 FlE60trn[�6 'T I O Wye tln4e&'1oe istYd'7 ,Y_N Shoe Dup"s) We alloa+loawarieakad? r-Y --N How rwa zb f�9 orarp -w , . Tl.a*d ..i"r *rn A -7 - 0 0 K Em ❑ v Laoglh or HBadplp_trnglh or TPtplpo 9.PERFOAAMNsiscREENS Periorarnns MRtrod t_ Srtnrns Screen CurNeted 9epm M9aa.ble fxrti Tn I'Ks— Vlr'M'r owikn' rtll AiN Curq U" 13.DRiLLER'S CEATIFIC011014 = 4We cerbry Vial 431 mlrimurn wall onrta lrudlvn aterrderda were complied wnh n Rm llrne the rig was ra.-W. Flan r.lpr wJ3{` �rf�r:,t ( FCC 1.( 4m N0. 44.STATIC WATER LEVEL OR ARTEWN PRESSURE; �r lf: rr bmv,grolrlu Artesian Ps6s9Ul¢—lb FfiTr4llldar�{ ale Y' S Depth flow onoot+r,tAprgd fl. Deacribe access poll or anu fSJlYlrlol dCriCCS' — &Wermor or Operami. Dal4 24yn mi Fml pRTtl a 9pd`amll - FORWAHO WHrTE COPY TO 5WA7EFl gESCWHCES M W t� N tzD a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA81D313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC IDWR Well Log r7r.� West of Subject Property " i3'66 F LliaOnb TDAHO DEPARTMENT OF WATER RESOUKES !&Y—" sao-s eoe W FIA,i KILLER'S REPORT -.. XIPT5e4 114 1.L1Q1[.Li Pil[MrF NMPu 1ww 1+� I�mR Odra IDWFL Ne,F?P[0371 ^ 2. 1rITlk:11: Q' X21r1[JLrju 9(1-mm 11dcr IS0- ins 7�R Addit5s �s?JxtcL}+nnuil wzbrrImv. Eaimahak>etLp. _ l;tly Ziaid1w Sm1¢L Tip per - t� Warr foampuY Inl w r�nrc�4 J.UWAMN OF 141LL by Intel dmu#Wim: b�vrh first xarcc[auwnlered S?' �hVL Atop lwarwa dWL;k pat*ir6"hm lerrhnm 12,r.l^lH{11L1R;[C"M[::1rlearrtYe rrpahr M ahulaaPnenlr 1wls.a }r+4r1 ur Saylh❑ WAlfF Da, 3r,— L. Aes.�k-r p�R'FW+1ry�ry4S'i 1'smp 1 Y �o.�[=.as1 [� of weir a Ciee. 25 Lm 5W 1.4 'rw Ira ..m Ad 1>ff+n -l�wrsr 4w-- 12• Z' 9' sindt hrP9+n 615} 1 7" 4' 17 �■nd hnrwn.l. w+ .atre1 llm'Elu1 Caunt}'Ada I9" IF' 18` vr]&said Add,ese of WA Site 5620-,MCTe rna,rv_s.u., Y ?' hr-" 9Vprn a2.f jam:��''_ = 3a lik gimlyL15Cuy ri teen� L1 ll Ilc, Sdb.Yi[ue d" 44' L—cluy SF ra hrrP�ti lxrtll 4.USk: 6" 03' y uc c Inv}.sni an rani,viP� 7>tnniai ❑hp�ctlul5 g InLn �' Hw' !�5' ails} mr Mrnun SaisJ VVUR]C el-kall fl-ar ri y (1lrvlo-r}rg11 M) 4' Or 7" b Lin clan 0 4 c„V'r}l EJ V-dp�Q AfiwwkPmrel❑[lrhrr b,RRI1J.HF'rHQD 1311 ry nt3t bi—sa I�AY Rotary❑Uahk❑M.r.l Rsxury❑01her V IM 11F W ran rlao ',SkwT.II C F11(K tD RkS — b 71 1?r h[aar sane hertz: 9 i} rl5 Lllhc tesxer.F Fr++rn ]n Sags u! G" I#R' L41 ti/+ra Land+':sm an clans[r�o 147. idr Irrt s lay B" 47 IVY dtn'!t;—.S"wti+Sr>'dl I 15- Lin L'iY sny4 1 55' 42:zx'rrn clay R'pr dnxr INM 1AWr Y ❑ * Shur U$PdW 1 c" 151 17.9, htcr 7'WNW hm"Mir mn Am drnrilree"r�+eee.' 0 Y 0 X EImrT 177 swily iea elnr h R' hr —u n:Uuci ink 1ix wrldw TFr.d�l Sirc,iy urckrs 0 � � M1' IA6' lL� iinr 61u4 pud 5" l7$7 1'>yr shiiky bllxelav 1i'' 1 n ins llrvryrr inn L.mgty of Ftau1133 Zr _.- .--.Itf,26 of Tail prae—_-- CooWlmd Dcpih,, _ {iluswahle} V,FER)-0RAT10N.VrA-RYfL%1A bnr SLhlSal UiduplelrjJ. ❑ Prfar rar; ;;who-#waslsnl in 13 11.DR]I LER'41-'F.R-r1HCAT10\ tirnenc cr[rn Y}7r ldsramrrrt9 ,� Vw,#mui,rha dl mmmmin-Al rmar•a.von Bad were i' ,i tiS r: CiUlplldd�71h i1�S7nee She ng was evlro-5ed �4D.wn '43 UI �j n� rIr.n?r'amr Q fl0� FirmNa! Q rA Firth bFrrral l�sc 14.tiTA'nU WATER 1.9VEL OR A9Tr&L4N — PIMUR£; NL1ptrw warCkwrlGur [talc jLjLbd1m Vend Aneudh P►unitt Ih ssip—if FmmYiPScid#S L.e�? Ikrpilr Anw arc iawwre[l�fi Dcicrtbe amm pan oe owe l 1km dfl 7-VT Lirre:L 1757 M4 RECEIVED dmc JUN 28 m 01% WATER 1�i�RCt% Cz a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA81D313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC IDWR Well Log } West of Subject Property IDAHO DEPARTMENT OF WATER RE$OUPICE Ise Um Only WELL DRILL ER'S REPORT Iy Uft rlPMFrde or 5pNpoirR F'm M'o r 1 9 11 :1I4_,11 1,ORILLmr;.PEFimu NO _- 11.1VELL TE848; u1F Apra. _ 00191�,1GRho _ =P! --T -PLM =a�w 11� wlrq IMil�l 21OWNEA; mwr 1. nmr994 .may.- Gbr�it`f�r� 'h'#rnr romp $GIpwp FOND mff* -- 3,LOCAPON OF WELL by"l deEClipIlan: Wghjr tk.hl}tipgor cn Vrft ShWlf map Quo-, 19W doidd rr01 wrMft%hXMul aWh f+\i Warm G,uR.r nnvj n 12-LRHOLOGIC LOG: IGMcrlbr wpfka or aUer yoftMrW$ f41r 4u+ "-+� ptFyrili:I+IlfnYk R-lh'Gs-Illr i T n T +r 7wp H9re'I OF G o- Adbrola of Well rtennel 1= '=0vw li,_fYPE OF WOFM omp*ip1 WrA spW 0tMfAKnr..4 +k.) — - - f( p4ew wer , UAHL Auarrdnnr^uri G OUwr- 6.CLL IA�TliOG � ' br wAripv -Cams .- NW ADurq D O011rr 7.SEALING 01110CEDURES ly IF -' C V M ScF4F4 =I..R WMMF IEnM vN I ___ ..-Y ■ ~ - 5 " rvv 0-CAStN¢&INER; . W. r.-rll ,:. far- 4 r+Irr'/ IJYr 55'�H�k Tr dW - - !� r Lys - - ❑ G 7 _ _. C - NP cl..relJl-� LiI,�M'I 81 Tnlpfir - �.PERF�I2�TIOh¢SiBCR£EHS ��� T - _ i9rrfil pvN s 'ArV:rc•7 ,7 wrl lY 1-1Mr lyQi CA'TpWlyd OlPlh -.._.� �U Urle:9leneA � - �CbnPaLaK? _ G iG 73.ORILL�rFi`Fr(`,EFITII�C 710N C _ LWO Onrelk 1F Mors V4mpmd rat at d O ow irrrtr th gl+ordp Na 10.S AM WATER LEVEL OR ARTESIAN PRESSME: � h new-ip(r 4 AMMIdabprnsw:• fantfllFelel .*�_". Ovplh tow nncDIJrIWmd — R P®cnln aaWM Per 0+ WA QIXIN11dw1'Ker. SwervMF 01 Operator B I-ORWARQ VWWM CGPY TO WAW RESOL94CF3 N a� ao a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC IDWR Well Log West of Subject Property �y Orr-t;�(1H, Lyf naliElcd by - r�23a.v IDAFfip DUAR-ITtAENT OF WATER RF:SUlTRG`8S wp —tlRs - vws.eaF WELL MILLERIS REJ R3' 1.4 _1w_ 1;1 LAL 1a 1. DKILLFNG PERM rr ,,o ('hhor IDWk No.13003mb —— - 11.WELL.'rEsTs-, I-OWNER- Pun 99,let M AJr F1 Tlr.:& .A r— *tams 02r rru lilrl A"rm 3oi9 yl:M.W*vrg CityMarI Suit In zip 141W; 3.LOCATION(FF WEU,bx JET*dMriptFon: tyy�Taep, i}s tluro hyio rpn p, Iretch Imp 16 dliun mule°6 stirh NYi'r��11uCa1 fltf Wme, 11 51 WALLr Ewomtvod Z5 Tvp.4 Notih 19 or S,xa ❑ 12,IJT[[01XVjl(.'LI)G:{131x6139 rsp■Jr Or 1kba1ed--Mt1 w r Rv-! East ❑ ce W= E Set. 2ii Ir4 NE 114 Nw 1A WOrer mrnw C—_ W- PJnrr F.".. In Rrm■F¢4:I.�IM411.54rIaQ■■Ytyl1'f19rp� �l k (i0v'1 lot C'ouc1V Ads 'Y" � - 14" 1' IA' S�pdyelH Lai I#" I{I' Is' S,mlFrldhi rxrrl I4c1df45d U[14'elI Sih 177 4errnit4 I n •" C ' x; Mindi«nd ull�nj vol Crr �'lerfdu� an land 4+� l r Sd' Sd hdR 8 ratel 1.- oy ra■dry I 1 Fl11e 1 Sub.Nurnr[F[TC riar �• Is' 4M' 511■d. rn lie Y1ts!�e�dlvklnn � go. 96. rw e a d,1.SEA ® iluupy s El Fdua 1 ❑ kla d1eq e" 4JS I08' SmYd � ❑ Iltig■innl 6. Ila' TuYe!■v ❑ T11¢marl [--]Jnjeriuno ❑ 4rhaJ ; 11 i. 13!' 'ran 1a�d . I1 rrF yr WORK cn1�k r11 urn,JMpIp tarlurancld ac Y��r Yesr A'e3r❑rrladYr}13.4h■rwkrnmeq[ flelµy 6.DR11.1-41kT11f)p 0 A.,R,rory 0 Cnble M Mud Roeae_u❑udl 7.%4:Al IjN(i JPK0('X0j.RFS 1- tAMOUNTWFTNOFI N1kyu1 1'mra Yo Sacksur IbwYds - W-*-c ihm oscd' N V ❑ n Slim DcrnX.11 117 wwcirruexhntic2lmied7 El 'r Ej M WWI RECEIVE n 1 IF Q ® ❑ �&OUFr-ES Upngdl of Hcudpipc 5`._. tArvh eflUslod?v 9.,FOLPORAT]MNF7'%CRE F ti S 0 1aFmwie■Y■ Mtffi 1 CwuplretdO .h. -I;23 J+[bravra6lc� ® St xn. Scs xn Type sw INLt.Smi tl l`trrn kled•i,••S 13,DRII,X.ER+R('EktiFICAT10V frv- r,i A i %LanW IIR In as � y� M+e•en lfy dal all rn mimnni uxJr ennakyFrrfM 4Itl■5a■nl■wer ❑ ❑ axrrpl lad ar111 al The 11nw the rry was Femox,n[. III,5'i-ATIC WAT{F.R LF1�VI.#11k ART'LSI.tV Turn wdr 1C Firm U,}� �. F'Yrm Ckli� p �, t.7 1; bclor gland Ac�iyl PrCwWL' lb rkTrk f6w PY Alplaal A rlc cnhc■ccC■c pyr 1X Corrlrul /7 devu■s Sigrmr su ar F ram' Uslc4!V'i'yl±� mre rlrpYl A;errnalm N a, on Cz a. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CMD313-1 F513-45513-A4913-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC IDWR Well Log North of Subject Property Fnm rat II]AHO DEPA197MEN7 OF WATER RESOURCES.37 � WELL DRILLERS REPORT I ispacted�y 1.WELL TAG ND.O 9W4 7wp 114 RA1 N—lid DRILLING PERM NO.==---- - 1�" SMELL TE$TS: Lel: Lc&g. Oami ILIWR Na __. _ _.PLrri :_8111rr XAir C.R"Ing APNaipn 2. OyWNF ran I.-- ar.x7.xn 1"1111 4111 T­ Nxme Cal. tase. _ I Wpmr Tamp �(&1 . — - fopom halg hemp 3. LOCATION OF WELL Illy 19gel descripllan: Wehr pwliy go—M. $11.Ich map lucalio.MLM ig1.e wllh primer baa*n. mp1hhuRykrCyw'x 12. LITHOLOGIO LOG: l0esrrihe repel-ur am,Fr.daephonll Wrkh. r N ry,r I,ar• ir, r1.m.rh.: LllhWupr,tt.l.r LmMy A lzpgml hur. Twp. � Ho-rLh 1T tr So-akh f' w s Ruo Eav 1 or west 1af SoA p Gw'I Lo• -- C01ni1 i - ._ ....— lr Let AddreSE Di Well.Sire �{y(�C� 1y. .yip r' 2Akl_ Gilt' r`. n 5 _ ii LL M _ '&lh, Name X y 4. USE; 4 _f_1 124U.1, a. .IST K kr 4omrGklc ❑Munlvipd ::Monitor :Pripuilon Q_ I TlhRrnil I Irn�411Pe Q�h.*_ _ ,L _ A 5. TTRE OF VMRK alv o&all w1aE appn l"aa'm-9 eLai +,I, pal X Now Tdol i 1 ilwy C1 kit'-dy- rr Drhar_ 1 l--� 4.DRILL MEMM ` �1 aC YAF Ft ealy 12 Cuhy _ 1A ftLwy _ ter" _ — i+ la- 7. SEALING �RDCEVURES „ 1 ?EA.FICER FACe AMIA.7 Y#Tn Oa +..n Tn P.Yadl w.5 dw�d bd 1,ya]7 '1' i. N S'M CAIYh[s1ftff Yin{Mu.sho.sRil imb,47 C YC_ N Hay7 8. CASIIFGVHER: — -- cm-1.r — TP_ .an. 1u__1 W.1ad 7h,0 .d RECEIVED S I IP u if r' .ill. iLfr K 0 T4 1= C! ... LucgM aF FWudpipe___G4t__ iunglh al Tu4plpe,,,,.__ 9. IPERFORATIOMStS.CREENS — PerioaNKmS wwh 34+.nF umm T}p. Gumpiaiaa nepm_ .I }# {MeawratiFe� O.ie: SLFrletl .�+2 7 tot Corlpluled��.�Q�a I F'4r Th 5N M. Ni b.r Gsnr.1 W.I.— v.11rg unrr ❑ 'k 19. MILLIER"S CMIFICA71ON ❑ C LWO CBMi maL aF Nunn wil eun5rmeam sznwas WEre rz"4a LNm a1 ❑ Cl Lho Imo iho ng pas mrtgld r 1 Campanv Narre i-3�F"IA.�7C�l_ }� y� Frm 10" STATIC WATERLEVEL I)A ARTESIAN PRESSURE: 1,J 13—h. Nle,. gfahna Ariesian pressure Ih" nrin orbdal_ .Z.A�— 0ep1h ilex enuumered _R. Describe access pork or a1d gpnfrai 4evieue:— — --_ LTrmw or pperraice Dahl 9%til rill flrMI1dI t �F FORWARD WHITE COPY TO WArER Rmsoulxces C V N cz bA Q. Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC DESIGN SECTION CALCULATIONS ( R-Value Method) Project: Prescott Subdivision File No.: 21821-B Chinden and McDermott Calc By: T. Shaffer Client: Providence Properties Date Sampled: 09/02/21 Design Thickness Equation: T=0.0032 (TI)(100-R)(12)= GE (inches) T= Design Thickness TI = Traffic Index= 6 By Agency GE = Gravel Equivalent R = R-Value= 20 By Soils Test GE= 18.9Inches HMA, 3/4" Base and Aggregate Subbase Actual Thickness Equivalent Thickness HMAThickness = 2.5 Inches HMA=� 5.0 Inches 3/4" Base Thickness = 4.0 Inches RBE= 4.4 Inches Calculated Aggregate Subbase Thickness Equation: Subbase Thickness=SB=GE-HMA-RBE SB= 9.5 Inches CALCULATED DESIGN SECTION HMA= 2.5 inches 3/4" Base= 4.0 inches Subbase= 10.0 inches RECOMMENDED DESIGN SECTION HMA = 2.5 inches 3/4" BASE = 4.0 inches SUBBASE = 10.0 inches SITE uses a maximum R-Value of 20 for Designs Cz N a un a Geotechnical Services/Soil Testing&Inspection Services DocuSign Envelope ID:62CA8D3B-1 F5B-455B-A49B-19253CE5EF2B SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 CONSULTING, LLC DESIGN SECTION CALCULATIONS ( R-Value Method) Project: Prescott Subdivision File No.: 21821-B Chinden and McDermott Calc By: T.Shaffer Client: Providence Properties Date Sampled: 09/02/21 Design Thickness Equation: T=0.0032 (TI) (100-R)(12)= GE (inches) T= Design Thickness TI = Traffic Index= 8 By Agency GE = Gravel Equivalent R = R-Value = 20 By Soils Test GE= 25.1 Inches HMA, 3/4" Base and Aggregate Subbase Actual Thickness Equivalent Thickness HMA Thickness = 3.0 Inches HMA=� 7.5 Inches 3/4" Base Thickness = 4.0 Inches RBE=� 4.4 Inches Calculated Aggregate Subbase Thickness Equation: Subbase Thickness=SB=GE-HMA-RBE SB= 13.2Inches CALCULATED DESIGN SECTION HMA= 3.0 inches 3/4" Base = 4.0 inches Subbase= 14.0 inches RECOMMENDED DESIGN SECTION HMA = 3.0 inches 3/4" BASE = 4.0 inches SUBBASE = 14.0 inches SITE uses a maximum R-Value of 20 for Designs d' Nothing FollowsCz N un a Geotechnical Services/Soil Testing&Inspection Services Mid-Season Groundwater Report Prescott Ridge Subdivision, SITE Consulting, LLC. (7/31/2023) SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208-440-6276 Z/ CaNSU LTI P LLC Austin Edwards July 31, 2023 Hubble Homes, Inc. File # 23978-B 701 South Allen Street Page 1 of 3 Meridian, Idaho 83642 Re: Mid-Season Groundwater Report Prescott Ridge Subdivision McDermott Road - Meridian, Idaho Austin: As per our discussions, attached is additional well data generate in the east end of Prescott Ridge Subdivision during the 2022 irrigation season. The wells were renumbered to match what is being used during the 2023 season. Damaged wells were repaired in August 2022 when new wells were installed in the west end (phase 1). Some were replace while others were extended above the weeds. Measurements for 2023 are ongoing. The report for 2023 should be available in mid-October. We appreciate this opportunity to be of service. Please contact our office should you have any questions or concerns. Respectfully submitted, SITE Consulting, LLC Bob J. Arnold, PE h7 j F 10P Oyu j v a Geotechnica/Services/Soil Testing&Inspection Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmail.com - 208440-6276 CONSULTING, LLC GROUNDWATER DATA TABLE Well Number 1 2 3 4 5 6 (Hub Elevation 2532.0 2532.0 2529.0 2529.4 2530.0 2531.0 KM/SITE (Casing Height 3.00 1.58 4.71 5.40 4.50 4.50 SITE (Casing Elevation 2535.0 2533.6 2533.7 2534.8 2534.5 2535.5 SITE Casing Depth 13.38 15.06 14.38 15.08 15.08 15.50 TS/SITE I6/3012022 DRY DRY DRY 13.6 Gone Gone BA/SITE GW Elevation 2521.6 2515.5 2514.6 2521.3 7/2/2022 DRY 14.8 DRY 13.5 Gone Gone JM/SITE GW Elevation 2516.5 2518.6 2514.6 2521.3 7/8/2022 DRY 14.8 DRY 13.6 Gone Gone KA/SITE GW Elevation 2516.5 2518.6 2514.6 2521.2 7/25/2022 DRY 14.8 DRY 13.5 Gone Gone KA/SITE GW Elevation 2516.5 2518.6 2514.6 2521.3 8/5/2022 Fixed Fixed Fixed Fixed Fixed Fixed KA/BA Hub Elevation 2532.0 2532.0 2529.0 2529.4 2530.0 2531.0 KM/SITE Casing Height 1.91 3.00 4.71 5.40 5.30 5.75 SITE Casing Elevation 2533.9 2535.0 2533.7 2534.8 2535.3 2536.8 SITE 8/5/2022 17.60 14.8 16.6 11.8 13.0 12.5 KA/BA GW Elevation 2516.3 2520.2 2517.1 2523.0 2522.3 2524.3 8/22/2022 17.60 14.8 16.7 11.5 12.8 12.3 KA/SITE GW Elevation 2516.3 2520.2 2517.0 2523.3 2522.5 2524.5 9/10/2022 17.40 14.7 16.9 Flooded 10.31rr 12.0 KA/SITE GW Elevation 2516.5 2520.3 2516.8 2524.8 9/26/2023 17.20 14.6 16.9 10.8 12.0 11.9 KA/SITE GW Elevation 2516.7 2520.4 2516.81 2524 2523.3 2524.85 10/10/2022 17.40 14.8 16.6 11.2 12.5 12.1 KA/BA GW Elevation 2516.5 2520.2 2517.1 2523.6 2522.8 2524.7 2022 High GW 2516.7 2520.4 2517.1 2524.0 2523.3 2524.9 BA/SITE fV v Geotechnica/Services/Soil Testing&Inspectlon Services SITE Post Office Box 190537 - Boise, Idaho 83719 site.consulting.idaho@gmaii.com - 208-"0-6276 CONSULTING, LLC AERIAL PHOTO WITH WELL LOCATIONS v Nothing Follows M v ao o a Geotechnica/Services/Soil Testing&Inspection Services