HomeMy WebLinkAbout2024-09-16 ACHD Development Services Department 'ACHD connecting you to more Project/File: Apex Phenomenal / MPP24-0017 / H-2024-0041 This is a preliminary plat application for the development of 64 residential lots, 11 common lots, and 1 other lot for future development on 16.15-acres. Lead Agency: City of Meridian Site address: E Lake Hazel Staff Approval: September 16, 2024 Applicant: Amanda McNutt Brighton Corporation 2929 W Navigator Drive, Suite 400 Meridian, ID 83642 Representative: Same as above Staff Contact: KaraLeigh Troyer, Planner Phone: 208-387-6391 E-mail: ktroyer(a)achdidaho.org Report Summary: ACHD Planned Improvements............................................2 Level of Service Planning Thresholds.................................2 A. Site Specific Conditions of Approval ............................3 B. Vicinity Map.................................................................4 C. Site Plan ......................................................................5 D. Findings for Consideration...........................................6 E. Policy...........................................................................9 F. Standard Conditions of Approval ...............................15 G. Conclusions of Law....................................................16 Request for Appeal of Staff Decision ................................17 1 Apex Phenomenal / MPP24-0017 / H-2024-0041 ACHD Planned Improvements 1. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Amity Road is scheduled in the IFYWP to be widened to 5-lanes from SH-69 (Meridian Road) to Locust Grove Road with a design year of 2023-2024, a right-of-way year of 2027-2028, and construction year yet to be determined. • Amity Road is scheduled in the IFYWP to be widened to 5-lanes from Locust Grove Road to Eagle Road with a design year of 2025-2026, a right-of-way year of 2027, and a construction year yet to be determined. • Locust Grove Road is scheduled in the IFYWP to be widened to 3-lanes from Amity Road to Victory Road with a design year of 2028-2029 and a construction year yet to be determined. • The intersection of Amity Road and Locust Grove Road is scheduled in the IFYWP to be constructed as a multi-lane roundabout with 2-lanes on the north leg, 2-lanes on the south, 4- lanes east, and 4-lanes on the west leg with a design year of 2023-2024, a right-of-way year of 2027-2928, and a construction year yet to be determined. • Locust Grove Road is listed in the CIP to be widened to 3-lanes from Lake Hazel Road to Amity Road between 2036 and 2040. • Lake Hazel Road is scheduled in the IFYWP to be widened to 5-lanes from SH-69 (Meridian Road) to Locust Grove Road and is currently under construction. Level of Service Planning Thresholds 1. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service E Lake Hazel Road 1,213-feet Principal Arterial 167 Better than "E" Locust Grove Road 0-feet Minor Arterial 181 Better than "E" Apex Avenue 554-feet Collector N/A N/A Sublimity Avenue 554-feet Collector N/A N/A Phenomenal Street 1,213-feet Local N/A N/A * Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH). * Acceptable level of service for a three-lane minor arterial is "E" (720 VPH). * Acceptable level of service for a two-lane collector is "D" (425 VPH). ** ACHD does not set level of service thresholds for local roadways. 2. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Lake Hazel Road east of SH-69 was 3,747 on June 12, 2018. • The average daily traffic count for Locust Grove Road south of Amity Road was 2,582 on October 16, 2018. • There are no average daily traffic counts for Apex Avenue, Sublimity Avenue, and Phenomenal Street. 2 Apex Phenomenal / MPP24-0017 / H-2024-0041 A. Site Specific Conditions of Approval 1. Repair or replace any damaged or deteriorated transportation facilities abutting the site on Lake Hazel Road, Apex Avenue, Sublimity Avenue, and Phenomenal Street in accordance with the current version of PROWAG. 2. Construct Sublimity Avenue, consistent with the approved construction drawings, as a 60-foot wide collector roadway with 21-foot wide travel lanes, an 18-foot wide landscape median, vertical curb, gutter, an 8-foot wide planter strip, and 5-foot wide detached concrete sidewalks abutting the site. 3. If the City of Meridian approves the private roads/alleys, the applicant shall be required to pave the private roads/alleys a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of all public streets and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. The proposed private roads/alleys are located as follows: • 646-feet west of Apex Avenue and in alignment with an approved proposed street, Culmination Avenue, with a curb-return type driveway. • 634-feet west of Apex Avenue with a curb-cut type driveway. • 130-feet south of Phenomenal Street with a curb-return type driveway. • 212-feet north of Lake Hazel Road with a curb-return type driveway. Street name and stops signs are required to private roads/alleys. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. 4. Other than the access specifically approved with this application, direct lot access is prohibited to Lake Hazel Road, Apex Avenue, and Sublimity Avenue and should be noted on the final plat. 5. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 6. There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 7. Comply with all Standard Conditions of Approval. 3 Apex Phenomenal / MPP24-0017 / H-2024-0041 B. Vicinity Map ' P IIy _ �� ► �!_� .. _ ,�.R, �_.. �Apr ._1 I. E Cr,4somido S1 i - J � Rhenolnenal-StJ J ITTFFF TID T F � LIII - . --_ Flake Hazel Rd u I I 1 � � I I I I' I - 4 Apex Phenomenal / MPP24-0017 / H-2024-0041 C. Site Plan sae•az'n•e nvysa' ' •: 0 Q O O O © O 0 0 0 E� 0 0 0 0 uRuE" o @ :o - s :- w Q o " g o 0 0 illllllllli"'�'�• -np9a2'P+-W I,m B5�� t _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — — — — — _ 5 Apex Phenomenal / MPP24-0017 / H-2024-0041 D. Findings for Consideration 1. Lake Hazel Road a. Existing Conditions: Lake Hazel Road is currently under construction to be improved with 5- lanes, vertical curb, gutter, an 8-foot wide planter strip, and a 10-foot wide multi-use pathway abutting the site. There is 102-178 feet of right-of-way for Lake Hazel Road (57-85 feet from centerline). b. Applicant Proposal: The applicant is not proposing any improvements to Lake Hazel Road abutting the site. c. Staff Comments/Recommendations: Lake Hazel Road is currently under construction and will be fully improved abutting the site. Therefore, no additional improvements or right-of-way dedication should be required as part of this application. If there is any damage to improvements to Lake Hazel Road due to the construction of the subdivision, then the applicant should be required to repair or replace any damaged or deteriorated transportation facilities abutting the site on Lake Hazel Road in accordance with the current version of PROWAG. 2. Apex Avenue a. Existing Conditions: Apex Avenue is improved with 2-travel lanes, vertical curb, gutter, an 8- foot wide planter strip, and 5-foot wide sidewalk abutting the site. There is 77-feet of right-of- way for Apex Avenue (39-feet from centerline). b. Applicant Proposal: The applicant is not proposing any improvements to Apex Avenue abutting the site. c. Staff Comments/Recommendations: Apex Avenue is fully improved abutting the site; therefore, no additional improvements or right-of-way dedication should be required as part of this application. If there is any damage to improvements to Apex Avenue due to the construction of the subdivision, then the applicant should be required to repair or replace any damaged or deteriorated transportation facilities abutting the site on Apex Avenue in accordance with the current version of PROWAG. 3. Sublimity Avenue a. Existing Conditions: Sublimity Avenue does not exist abutting the site. ACHD has reviewed and approved construction drawing for Sublimity Avenue to be constructed as a 60-foot wide collector roadway with 21-foot wide travel lanes, an 18-foot wide landscape median, vertical curb, gutter, an 8-foot wide planter strip, and a 5-foot wide detached concrete sidewalk abutting the site. The construction of Sublimity Avenue has not yet started. b. Applicant Proposal: The applicant is not proposing any improvements to Sublimity Avenue abutting the site. c. Staff Comments/Recommendations: The applicant should be required to construct Sublimity Avenue, consistent with the approved construction drawings. 4. Phenomenal Street a. Existing Conditions: Phenomenal Street is currently under construction to be improved with 2-lanes, vertical curb, gutter, an 8-foot wide planter strip, and 5-foot wide detached sidewalk abutting the site. b. Applicant's Proposal: The applicant is not proposing any improvements to Phenomenal Street abutting the site. c. Staff Comments/Recommendations: Phenomenal Street is fully improved abutting the site; therefore, no additional improvements or right-of-way dedication should be required as part of 6 Apex Phenomenal / MPP24-0017 / H-2024-0041 this application. If there is any damage to improvements to Phenomenal Street due to the construction of the subdivision, then the applicant should be required to repair or replace any damaged or deteriorated transportation facilities abutting the site on Phenomenal Street in accordance with the current version of PROWAG. 5. Driveways 5.1 Lake Hazel Road a. Existing Conditions: There are no existing driveways abutting the site on Lake Hazel Road. There is a 14-foot wide curb-cut type driveway currently under construction as part of the Lake Hazel Road reconstruction on Lake Hazel Road located 579-feet west of Apex Avenue. b. Applicant's Proposal: The applicant is not proposing any improvements to the driveway under construction. c. Staff Comments/Recommendations: Typically, the applicant would be required to close the driveway currently under construction on Lake Hazel Road and take access from a lesser classified roadway. However, the driveway currently under construction provides access necessary for irrigation facilities. Therefore, the applicant's proposal should be approved, as proposed with no changes to the driveway. 6. Private Roads a. Applicant Proposal: The applicant is proposing to construct a private road with a 25-foot wide curb-return type driveway located 646-feet west of Apex Avenue and in alignment with an approved proposed street, Culmination Avenue, across Phenomenal Street to the north. The applicant is proposing to widen the roadway to 33-feet wide past the right-of-way line. The applicant is proposing three 20-foot wide private roads/alleys located as follows (measured centerline to centerline): • 634-feet west of Apex Avenue with a curb-cut type driveway. • 130-feet south of Phenomenal Street with a curb-return type driveway. • 212-feet north of Lake Hazel Road with a curb-return type driveway. b. Staff Comments/Recommendations: If the City of Meridian approves the private roads and alleys, the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and at least 30-feet into the site beyond the edge of pavement of all public streets and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. If private roads are not approved by the City of Meridian, the applicant will be required to revise and resubmit the preliminary plat to provide public standard local streets in these locations. Street name and stop signs are required for the private road. The signs may be ordered through the District. Verification of the correct, approved name of the road is required. ACHD does not make any assurances that the private road, which is a part of this application, will be accepted as a public road if such a request is made in the future. Substantial redesign and reconstruction costs may be necessary in order to qualify this road for public ownership and maintenance. The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD: • Dedicate a minimum of 50-feet of right-of-way for the road. • Construct the roadway to the minimum ACHD requirements. • Construct a stub street to the surrounding parcels. 7 Apex Phenomenal / MPP24-0017 / H-2024-0041 7. Other Access Lake Hazel Road is classified as a principal arterial roadway, Apex Avenue and Sublimity Avenue are classified as collector roadways. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. 8 Apex Phenomenal / MPP24-0017 / H-2024-0041 E. Policy 1. Federal Accessibility Design Guidelines and Standards District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG), 36 CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional information). 2. Minor Improvements Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 3. Livable Street Performance Measures District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation network that serves all ages and abilities. Bike and pedestrian facilities built through development should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a minimum of 5-feet. 4. Lake Hazel Road Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Improvements shall include transitional segments in accordance with the current version of PROWAG. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map, Livable Streets Design Guide, and the most current ACHD Livable Streets Performance Measures Plan as adopted by the ACHD Commission. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state The standard 5-lane street section shall be 59-feet (back-of-curb to back-of-curb). This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane or landscaped median with intermittent turn lanes, and curbs and gutters. A 5-lane road shall also include a minimum 10-foot wide multi-use path on both sides with an 8-foot wide buffer from back-of-curb. Other bike facility treatments as defined in the ACHD Bike Master Plan may be approved at the discretion of the ACHD Development Review Supervisor. If an interim on-street bike lane is required in order to connect to existing facilities, the street section shall be 75-feet to allow for a 5-foot wide bike lane and 3-foot wide painted buffer. The standard right-of-way width for a 5-lane arterial is 100- feet. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact 9 Apex Phenomenal / MPP24-0017 / H-2024-0041 fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Pedestrian Facilities: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide are required on both sides of all arterial streets. A parkway strip at least 8-feet wide between the back- of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Alternatively, on roadways identified for improvement in the Capital Improvement Plan, a minimum 10-foot wide multi-use path may be required. The path shall be placed in accordance with planned buildout in the Master Street Map with a minimum 8-foot wide planter strip as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Consult the District's planter width policy if trees are to be placed within the parkway strip. In some instances, to match existing conditions, a minimum 7-foot wide sidewalk may be constructed next to the back-of-curb. ACHD Development Review staff will be responsible for determining the required facility. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Detached sidewalks and multi-use paths are encouraged and should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line parallel to the roadway when authorized by Development Review staff to accommodate site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public pedestrian facilities are placed out of the right-of- way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the pedestrian facility. Pedestrian facilities shall either be located wholly within the public right-of-way or wholly within an easement. Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Lake Hazel is designated in the MSM as a Residential Mobility Arterial with 5-lanes and a 10-foot wide multi-use pathway, a 59-foot street section within 100-feet of right-of-way. 5. Apex Avenue & Sublimity Avenue Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Improvements shall include transitional segments in accordance with ADA and the current version of PROWAG. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard 10 Apex Phenomenal / MPP24-0017 / H-2024-0041 street sections shall serve as the default. ACHD reserves the right to require bicycle and pedestrian facilities above those identified in the Livable Streets Design Guide and Master Street Map to ensure the safest facility possible based on current best practice. Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right- of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk or multi-use path and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk or multi-use path is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of-curb on each side. The standard street section shall be 47-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. If a multi-use path is determined to be the required treatment, the street section shall be reduced to 37-feet. If it is determined a continuous center left-turn lane is not appropriate and a path is installed, the street section may be reduced to 26-feet. Residential Collector Policy: District policy 7206.5.2 states that the standard street section for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District will consider a 33-foot or 29-foot street section with written fire department approval and taking into consideration the needs of the adjacent land use, the projected volumes, the need for bicycle lanes, and on-street parking. At the discretion of Traffic Engineering staff, adjustments may be made to the street section, including removal of the continuous center turn lanes or modification to lane widths, where no driveways or intersections are present or to ensure adequate space for pathways and buffers. Pedestrian Facilities: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 8-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalk constructed next to the back-of-curb shall be a minimum of 7-feet wide. Alternatively, on roadways identified as low-stress bikeways in ACHD's Bike Master Plan, a minimum 10-foot wide multi-use path may be required in lieu of sidewalks. ACHD Development Review staff will be responsible for determining the required facility. The path shall be built 8-feet behind the back-of-curb as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Pedestrian facilities should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line when authorized by Development Review staff to meet site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public sidewalks or multi-use paths are placed out of the right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk or multi-use path. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. Apex Avenue ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. This segment of Apex Avenue is designated in the MSM 11 Apex Phenomenal / MPP24-0017 / H-2024-0041 as a Commercial Collector with 2-lanes and on-street bike lanes, a 47-foot street section within 77- feet of right-of-way. Sublimity Avenue ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. A new collector roadway was identified on the MSM with the street typology of Residential Collector. The new collector roadway has been approved to be constructed as a 2-lane roadway with a 10-foot wide multi-use pathway on the western side, a 60-foot street section within 87-feet of right-of-way. 6. Phenomenal Street Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8- feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. 7. Driveways 7.1 Lake Hazel Road Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified 12 Apex Phenomenal / MPP24-0017 / H-2024-0041 street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 b under District policy 7205.4.7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restrict the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 355-feet from the nearest intersection for a right-in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1 b, requires driveways located on principal arterial roadways with a speed limit of 50 MPH to align or offset a minimum of 425-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8. Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which "is permitted for use until appropriate alternative access becomes available". Temporary access may be granted through a development agreement or similar method, and the developer shall be responsible for providing a financial guarantee for the future closure of the driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. 7.2 Apex Avenue & Sublimity Avenue Access Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. District Policy 7206.1 states that the primary function of a collector is to intercept traffic from the local street system and carry that traffic to the nearest arterial. A secondary function is to service adjacent property. Access will be limited or controlled. Collectors may also be designated at bicycle and bus routes. Driveway Location Policy (Stop Controlled Intersection): District policy 7206.4.4 requires driveways located on collector roadways near a STOP controlled intersection to be located outside of the area of influence; OR a minimum of 150-feet from the intersection, whichever is greater. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. Successive Driveways: District policy 7206.4.5 Table 1 requires driveways located on collector roadways with a speed limit of 25 MPH and daily traffic volumes greater than 100 VTD to align or offset a minimum of 245-feet from any existing or proposed driveway. 13 Apex Phenomenal / MPP24-0017 / H-2024-0041 Driveway Width Policy: District policy 7206.4.6 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7206.4.6, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7206.4.6. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 7.3 Phenomenal Street Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb-cut type driveways. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway. 8. Private Roads Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada County establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. The private road should have the following requirements: • Designed to discourage through traffic between two public streets, • Graded to drain away from the public street intersection, and • If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of 50-feet from the near edge of the intersection and a turnaround shall be provided. 14 Apex Phenomenal / MPP24-0017 / H-2024-0041 9. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 10. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 11. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. F. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD requirements . The applicant's engineer should provide documentation of compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 15 Apex Phenomenal / MPP24-0017 / H-2024-0041 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property, which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. G. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. 16 Apex Phenomenal / MPP24-0017 / H-2024-0041 Request for Appeal of Staff Decision To request an appeal of a staff level decision, see District policy 7101.6.7 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 Request for Reconsideration of Commission Action To request reconsideration of a Commission Action, see District policy 1006.11 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 17 Apex Phenomenal / MPP24-0017 / H-2024-0041