SITE SPECIFIC CONDITIONS:
1. Request for new Water Service connection and/or any changes to the existing services will need to
be submitted for review and approval by Land Development.
GENERAL CONDITIONS:
1. Sanitary sewer service to this development is available via extension of existing mains adjacent to
the development. Water service to this site is available via extension of existing mains adjacent to
the development.
2. All improvements related to public life, safety and health shall be completed prior to occupancy of
the structures. Where approved by the City Engineer, an owner may post a performance surety for
such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC
11-5C-3B.
3. Upon installation of the landscaping and prior to inspection by Planning Department staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
4. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing,
landscaping, amenities, pressurized irrigation, prior to signature on the final plat.
5. The City of Meridian requires that the owner post with the City a performance surety in the amount
of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final
plat signature. This surety will be verified by a line item cost estimate provided by the owner to the
City. The applicant shall be required to enter into a Development Surety Agreement with the City
of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or
bond. Applicant must file an application for surety, which can be found on the Community
Development Department website. Please contact Land Development Service for more information
at 887-2211.
6. The City of Meridian requires that the owner post to the City a warranty surety in the amount of
20% of the total construction cost for all completed sewer, and water infrastructure for a duration
of two years. This surety amount will be verified by a line item final cost invoicing provided by the
owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash
deposit or bond. Applicant must file an application for surety, which can be found on the
Community Development Department website. Please contact Land Development Service for
more information at 887-2211.
7. In the event that an applicant and/or owner cannot complete non-life, non-safety and non-health
improvements, prior to City Engineer signature on the final plat and/or prior to occupancy, a surety
agreement may be approved as set forth in UDC 11-5C-3C.
8. It shall be the responsibility of the applicant to ensure that all development features comply with
the Americans with Disabilities Act and the Fair Housing Act.
9. Applicant shall be responsible for application and compliance with any Section 404 Permitting that
may be required by the Army Corps of Engineers.
10. Developer shall coordinate mailbox locations with the Meridian Post Office.
11. All grading of the site shall be performed in conformance with MCC 11-1-4B.
12. Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
13. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage
facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD.
The design engineer shall provide certification that the facilities have been installed in accordance
with the approved design plans. This certification will be required before a certificate of occupancy
is issued for any structures within the project.
14. At the completion of the project, the applicant shall be responsible to submit record drawings per
the City of Meridian AutoCAD standards. These record drawings must be received and approved
prior to the issuance of a certification of occupancy for any structures within the project.
15. Street light plan requirements are listed in section 6-7 of the Improvement Standards for Street
Lighting (http://www.meridiancity.org/public_works.aspx?id=272). All street lights shall be
installed at developer’s expense. Final design shall be submitted as part of the development plan
set for approval, which must include the location of any existing street lights. The contractor’s
work and materials shall conform to the ISPWC and the City of Meridian Supplemental
Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator
at 898-5500 for information on the locations of existing street lighting.
16. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of
way (include all water services and hydrants). The easement widths shall be 20-feet wide for a
single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but rather
dedicated outside the plat process using the City of Meridian’s standard forms. The easement shall
be graphically depicted on the plat for reference purposes. Submit an executed easement (on the
form available from Public Works), a legal description prepared by an Idaho Licensed Professional
Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2” x
11” map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be
sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the
plat referencing this document. All easements must be submitted, reviewed, and approved prior to
signature of the final plat by the City Engineer.
17. Applicant shall be responsible for application and compliance with and NPDES permitting that
may be required by the Environmental Protection Agency.
18. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water (UDC 11-3B-6.). The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well source is not available, a single-point
connection to the culinary water system shall be required. If a single-point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
development plan approval.
19. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting,
crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC
11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any
other applicable law or regulation.