HomeMy WebLinkAboutPZ - Staff Report (Revised) 09-05
City of Meridian | Department Report I. Project Overview
HEARING
DATE:
9/5/2024
TO: Planning & Zoning Commission
FROM: Nick Napoli, Associate Planner
208-884-5533
nnapoli@meridiancity.org
APPLICANT: Elizabeth Allen
SUBJECT: H-2024-0030
Treasure Valley Law Enforcement
Childcare
LOCATION: 1085 S. Ten Mile Rd., in the SW 1/4 of
Section 15, T.3N., R.1W.
I. PROJECT OVERVIEW
A. Summary
Conditional Use Permit to construct and operate a 7,504 square foot daycare center in the M-E
zoning district, by Ball Ventures Ahlquist.
B. Recommendation
Staff: Approval with conditions.
C. Decision
To be determined
II. COMMUNITY METRICS
Table 1: Land Use
Description Details Map Ref.
Existing Land Use(s)/Proposed Use Vacant/undeveloped/daycare -
Existing Zoning Mixed Employment (M-E) VII.A.2
Future Land Use Designation High Density Employment (HE) in the Ten Mile
Interchange Specific Area Plan (TMISAP)
VII.A.3
Table 2: Process Facts
Description Details
Preapplication Meeting date 4/19/2024
Neighborhood Meeting 5/1/2024
Site posting date 8/21/2024
COMMUNITY DEVELOPMENT
DEPARTMENT REPORT
Table 3: Community Metrics
Agency / Element Description / Issue Reference
Ada County Highway District -
• Comments Received Yes -
• Commission Action Required No -
• Access W. Grand Mogul Drive/ S. La Vista Drive (private) -
• ITD Comments Received No (NA) -
Meridian Fire Distance to Station #6: 2.4 miles
Response Time: 3 minutes
-
Meridian Public Works Wastewater Distance to Mainline: Will be available at site when Grand
Mogul is extended along north boundary.
Impacts or Concerns: No
IV.A.12
Meridian Public Works Water Distance to Mainline: Will be available at site when Grand
Mogul is extended along north boundary.
Impacts or Concerns: No
IV.A.12
See City/Agency Comments and Conditions in Section IV and in the public record for all comments
received.
III. STAFF ANALYSIS
Comprehensive Plan and Unified Development Code (UDC)
A. General Overview
The subject site is currently designated High Density Employment on the future land use map
(FLUM). This designation is part of the Ten Mile Interchange Specific Area Plan (TMISAP)
which promotes a variety of employment in the area. The existing development agreement
anticipates this property developing with a mix of commercial and light manufacturing uses. The
proposed development plan is generally consistent with the conceptual development plan
included in the DA, as required.
Land Use Types in High Density Employment:
- Corporate, business and professional offices
- Research facilities and laboratories
- Complementary uses primarily serving district employees and users, such as business
services, conference centers, child care, restaurants, convenience retail, and hotels and
motels.
The current zoning is M-E (Mixed Employment) was established with the Vanguard Village
Rezone (H-2021-0081). The proposed daycare use contributes to the mix of land use types
desired in the High Density Employment designation in the Ten Mile Interchange Specific Area
Plan (TMISAP), which include commercial uses.
Table 4: Project Overview
Description Details
History AZ-09-008 Meridian Crossing [Ord. #10-1467, Development Agreement
(DA) Inst. #110115738]; H-2021-0081 Vanguard Village (MDA, RZ, PP,
CUP – DA Inst. #2022-0497799); H-2023-0072 Vanguard Village (MDA
– DA is not yet recorded); A-2024-0088 PS; FP-2024-0012 Vanguard
Village No. 1 – FP (not yet approved or recorded); H-2023-0071 District at
Ten Mile (CPAM, MDA, PP, RZ)
Physical Features Williams Pipeline
Acreage 1.12 Acres
B. History and Process
There is a development agreement in effect for this property that governs future development
(Vanguard Village Inst. #2022-0497799). An amendment to the agreement was recently approved
but has not yet been recorded. A preliminary plat was previously approved that includes the
subject property; a final plat application has been submitted but has not yet been approved. The
final plat shall be recorded prior to issuance of a certificate of occupancy. A rezone,
comprehensive plan map amendment, and amendment to the development agreement (H-2023-
0071) was recently approved by Commission and is awaiting City Council action.
C. Site Development and Use Analysis
1. Proposed Use Analysis (UDC 11-2):
Goal 2.04.01A of the Comp Plan emphasizes the importance of supporting a network of
public resources, schools, community centers and other public facilities that address the city’s
educational and training needs. The 7,504 square foot daycare facility will provide valuable
childcare for our law enforcement officers across the valley.
The UDC (Table 11-2B-2) lists daycare uses as an allowed use with a conditional use permit
in the M-E zoning district; compliance with the specific use standards for such in UDC 11-4-
3-9 is required.
2. Dimensional Standards (UDC 11-2):
Future development is required to comply with the dimensional standards listed in UDC
Table 11-2B-3 for the M-E zoning district.
3. Specific Use Standards (UDC 11-4-3):
11-4-3-9. – Daycare Facility.
a. General standards for all child daycare and adult care us es, including the classifications
of daycare center; daycare, family; and daycare, group.
i. In determining the type of daycare facility, the total number of children at the
facility at one time, including the operator's children, is the determining factor.
The applicant is proposing a daycare with 84 children as the scope of work.
This designates the use as a daycare facility.
ii. On-site vehicle pick-up, parking, and turnaround areas shall be provided to
ensure safe discharge and pick up of clients. The applicant is proposing a pick-
up area for children that meets this requirement. However, staff has found that
many daycares require parents to check in/out their children. As a result, the
applicant shall Stripe the loading zone as parallel parking (9’ x 23’) and install
a planter island with a bulb out to match the southern portion of the loading
zone.
iii. The decision-making body shall specify the maximum number of allowable
clients and hours of operation as conditions of approval. The applicant is
proposing 84 children being watched at any one time by 18 staff members. City
staff recommends the Commission allow up to 125 children to provide
flexibility for the user as the Treasure Valley continues to grow (in case of a
future expansion). Additionally, the proposed hours of operation are 5:00 am
and 10:00 pm.
iv. The applicant or owner shall provide proof of criminal background checks and
fire inspection certificates as required by Title 39, Chapter 11, Idaho Code.
Said proof shall be provided prior to issuance of certificate of occupancy. The
applicant or owner shall comply with all State of Idaho and Department of
Health and Welfare requirements for daycare facilities.
b. The applicant shall not exceed the maximum number of clients as stated in the
approved permit or as stated in this title, whichever is more restrictive.
c. Additional standards for daycare facilities that serve children.
i. All outdoor play areas shall be completely enclosed by minimum six -foot
nonscalable fences to secure against exit/entry by small chil dren and to screen
abutting properties. The applicant shall submit a fencing detail with the
submittal for a Certificate of Zoning Compliance.
ii. Outdoor play equipment over six (6) feet high shall not be located in a front
yard or within any required yard. N/A
iii. Outdoor play areas in residential districts adjacent to an existing residence shall
not be used after dusk. N/A
D. Design Standards Analysis
1. Structure and Site Design Standards (Comp Plan, UDC 11-3A-19):
Goal 5.01.02D of the Comp Plan emphasizes the importance of building design, and
landscaping elements to buffer, screen, beautify, and integrate commercial, multifamily, and
parking lots into existing neighborhoods. Buildings are required to be designed in accord with
the design standards in the Architectural Standards Manual and TMISAP. See Section III.D.4
See below for more information on design requirements.
The proposed development plan complies with the parking lot design standards. However,
due to this development being the first in the subdivision staff has concerns about the future
parking to the west not being installed. The applicant has indicated there may be a building in
the proposed future parking but nothing has been solidified. Given that offsite improvements
are already being made, staff recommends the entirety of the western parking area is
installed. Additionally, staff is increasing the capacity for children from the applicant's
proposed 75 to 125 to provide flexibility for the user as the Treasure Valley continues to
grow (in case of a future expansion). By paving the additional parking, it will prevent
overflow parking on unimproved surfaces and will provide better integration when the
surrounding properties develop. Staff recommends the site and landscape plan be revised to
include the future parking to the west with this application.
Per UDC 11-3A-19B.4, a minimum 5-foot wide pedestrian walkway is required to be
provided from the perimeter sidewalk to the main building entrances per UDC 11-3A-19B.4a.
The walkway is required to be distinguished from the vehicular driving surfaces through the
use of pavers, colored or scored concrete, or bricks.
2. Landscaping (UDC 11-3B):
i. Landscape buffers along streets
The landscaping within the street buffers along I-84, W. Grand Mogul Drive and LaVista
Lane should be installed with the subdivision improvements associated with Vanguard
Village Subdivision No. 1. However, if they’re not completed prior to the issuance of
the first Certificate of Occupancy within this development, this developer should be
responsible for these improvements as required with the final plat (FP-2024-0012).
Review of the street buffer landscaping for consistency with UDC standards will
take place with FP-2024-0012. Note: Although this site doesn’t abut the future
extension of W. Grand Mogul Drive, the larger (soon to be) lot does; therefore, street
buffers are required on the larger (future) lot.
ii. Parking lot landscaping
Parking lot landscaping is required in accord with the standards listed in UDC 11-3B-8C.
The applicant is required to add extra shrubs to all planter islands and plant one
additional tree in the planter island with the fire hydrant (with a minimum of one tree per
planter island). Requests for alternative compliance to this standard can be made as
permitted under UDC 11-5B-5. Additionally, the applicant must remove two parking
stalls from the southeast parking area adjacent to the trash enclosure to ensure sufficient
ingress and egress. Lastly, the applicant should widen the planter island south of the trash
enclosure to 5 feet (measured from inside of the curb) and meet the minimum
requirement of 50 square feet.
The site/landscape plans submitted with the Certificate of Zoning Compliance
should be revised to comply with these standards.
iii. Landscape buffers to adjoining uses
No residential uses exist or are planned adjoining this site to the west or east; therefore,
no buffers are required.
iv. Tree preservation
There are no existing trees on this site. Tree mitigation will not be required.
v. Pathway landscaping
Landscaping is required along the multi-use pathway running along the Williams pipeline
in accord with the standards listed in UDC 11-3B-12C. A mix of trees, shrubs, lawn
and/or vegetative groundcover should be provided; the landscape plan should be
revised to include shrubs as required. This is being reviewed with the Vanguard
Village No. 1 final plat application.
3. Parking (UDC 11-3C):
Off-street vehicle parking is required in accord with the standards for commercial districts in
UDC 11-3C-6B.1. Bicycle parking is required in accord with the standards listed in UDC 11-
3C-6G and should comply with the design standards listed in UDC 11-3C-5C.
i. Nonresidential parking analysis
A minimum of one (1) space is required for every 500 s.f. of gross floor area. Based on
the total square footage of the structures (i.e. 7,504 s.f.), a minimum of 15 spaces are
required; 40 spaces are proposed. While this exceeds the required number of parking
spaces, staff has concerns regarding about the future parking to the west not being
installed. With off site improvements already being made, staff recommends the entirety
of the western parking area is installed. Additionally, staff is increasing the capacity for
children from the applicant's proposed 75 to 125 to provide flexibility for the user as the
Treasure Valley continues to grow (in case of a future expansion). By paving the
additional parking, it will prevent overflow parking on unimproved surfaces and will
provide better integration when the surrounding properties develop. Staff recommends
the site and landscape plan be revised to include the future parking to the west with this
application.
A loading zone is currently proposed along the front of the building without any
stripping. The applicant shall stripe the loading zone as parallel parking (9’ x 23’) and
install a planter island with a bulb out on the north portion of the loading zone to match
the southern portion.
ii. Bicycle parking analysis
A minimum of one (1) bicycle parking space is required to be provided for every 25
proposed vehicle parking spaces or portion thereof; bicycle parking should be depicted on
the plans in accord with this standard along with a detail of the rack that demonstrates
compliance with the design standards.
4. Building Elevations (Comp Plan, Architectural Standards Manual):
Goal 5.01.02D of the Comprehensive Plan underscores the significance of building design
and landscaping in buffering, screening, beautifying, and integrating commercial,
multifamily, and parking areas into existing neighborhoods. The elevations and renderings for
the proposed structure, detailed in Section VII.E below, are designed to facilitate a smooth
transition from the I-84 corridor to the multi-family development to the north and from the
industrial area to the west to the commercial users to the east. The neighboring buildings are
expected to generally align with the proposed elevations for the daycare facility. However,
the District has proposed their own design standards and if approved by Council these
would govern the site.
Standards:
The architectural design of the proposed structures must adhere to the following standards:
1. Architectural Standards Manual: All designs must comply with the specifications
outlined in the Architectural Standards Manual.
2. UDC 11-3A-19: Structures and site designs must meet the criteria listed in this section of
the Unified Development Code.
3. Ten Mile Interchange Specific Area Plan (TMISAP): The design guidelines for the
Mixed Employment (ME) designation, as detailed in the Application of the Design
Elements table on page 3-49, must be followed.
TMISAP Design Elements for HE Designated Areas Include:
• Architecture and Heritage (pg. 3-32): New buildings should incorporate architectural
features and details that reflect the area’s historical farming and dairy activities from
around 1900.
• Building Form and Character (pg. 3-37): The primary façades of the buildings must
include entries. Trash dumpsters should be located away from the primary façades,
ideally at the rear, and enclosed within screened structures with at least 6-foot-tall walls.
Although the proposed structures are single-story, they achieve a taller form of 22 feet in
height (note: the ME designation permits buildings of 1-4 stories). The base, body, and
top of the buildings are defined through variations in color, step-backs, fenestration
patterns, and parapet heights. Roof-mounted mechanical equipment must be screened
from view by parapets, and flat roofs with varying parapet heights are proposed.
• Signs (pg. 3-46): Signage should contribute to the overall character, identity, and
wayfinding system. A separate sign permit is required.
• Public Art (pg. 3-47): High-quality public art is encouraged in streetscapes, public
buildings, parks, transit areas, and other public projects in the Ten Mile area. Given the
industrial nature of this project, which lacks public spaces, public art is not
recommended.
The proposed elevations align with the Architectural Standards Manual and TMISAP
guidelines. The applicant must apply for an administrative design review following the
completion of the Conditional Use Permit (CUP) process. However, the District has
proposed their own design standards and if approved by Council these would govern
the site.
5. Fencing (UDC 11-3A-6, 11-3A-7):
The applicant is proposing a 6-foot fence on the perimeter of the outdoor playground. This
satisfies the height requirement from the daycare facility specific use standards in UDC 11-4-
3-9. However, the fence is required to be non-scalable. Fencing details shall be provided with
the certificate of zoning compliance submittal.
6. Parkways (UDC 11-3A-17):
Parkways are required to comply with the standards listed in UDC 11-3A-17E.
E. Transportation Analysis
1. Access (UDC 11-3A-3):
Goal 6.01.02B highlights the need to minimize the number of access points onto arterial
streets by implementing strategies such as cross-access agreements, access management, and
the development of frontage and backage roads, while also enhancing connectivity between
local and collector streets. Access to the site is proposed via La Vista Lane, a private street
still pending approval, connecting to the future extension of W. Grand Mogul Way, a
collector street, along the northern boundary. To support future connectivity and comply with
UDC 11-3A-3A.2, a cross-access easement should be established along the southeast
boundary of the site for access to and from the parcel to the south. Additionally, an access
easement should be granted to the future lot to the north to facilitate use of the private street
and interconnectivity between lots. These easements may be accomplished through a note on
the final plat or a separately recorded easement.
2. Pathways and Multiuse Pathways (UDC 11-3A-8 and UDC 11-3A-5):
Goals 4.04.01 and 4.04.02 of the Comprehensive Plan emphasize the importance of linking
local pathways from neighborhoods to regional pathways in commercial and community
areas. In line with these goals and the Pathways Master Plan, a 10-foot wide multi-use
pathway is required along the Williams pipeline and must be constructed as part of the
subdivision improvements for Vanguard Village. To facilitate this, a 14-foot wide public use
easement (comprising a 10-foot pathway plus 2 feet on each side) must be submitted.
Additionally, pathways must be constructed in accordance with the standards outlined in
UDC 11-3A-8. A pathway connection should be established to the adjacent property to the
north via the driveway stub to enhance interconnectivity. Sidewalks are also proposed along
the private street adjacent to the east boundary to ensure comprehensive pedestrian access.
3. Sidewalks (UDC 11-3A-17):
Sidewalks are required along all streets as set forth in UDC 11-3A-17. Sidewalks are
proposed in accord with UDC standards.
4. Private Streets (UDC 11-3F-4):
A private street (La Vista Lane) is proposed along the east boundary of the site. A private
street application has been submitted (a-2024-0088) with the final plat application that’s
currently in process.
F. Services Analysis
1. Waterways (UDC 11-3A-6):
All waterways, except natural waterways, are required to be piped unless used as a water
amenity or linear open space, in which case they may be left open as set forth in UDC 11-3A-
6. The Marvin Lateral lies along the south and west boundaries of this site within a 50-foot
wide Nampa & Meridian Irrigation District (NMID) easement (20-feet left and 30-feet right)
and should be piped. See comments from NMID in Section IV below.
2. Pressurized Irrigation (UDC 11-3A-15):
Underground pressurized irrigation water is required to be provided in each development as
set forth in UDC 11-3A-15.
3. Storm Drainage (UDC 11-3A-18):
An adequate storm drainage system is required in accord with the adopted standards,
specifications and ordinances; design and construction shall follow Best Management
Practice as adopted by the City per UDC 11-3A-18.
4. Utilities (Comp Plan, UDC 11-3A-21):
Both the Plan and the UDC establish policy and regulations for extending and connecting to
City utilities. Goal 3.03.03G of the Plan mandates urban infrastructure be provided for all
new developments, including curb and gutter, sidewalks, water and sewer utilities. All
utilities for the proposed development are required to be installed in accord with the standards
listed in UDC 11-3A-21.
IV. CITY/AGENCY COMMENTS & CONDITIONS
A. Meridian Planning Division
1. The Applicant shall comply with all previous conditions of approval associated with this
development [H-2021-0081 Vanguard Village (MDA, RZ, PP, CUP – DA Inst. #2022-
0497799); H-2023-0072 Vanguard Village (MDA); A-2024-0088 PS; FP -2024-0012
Vanguard Village No. 1 – (FP); H-2023-0071 District at Ten Mile (CPAM, RZ, PP, MDA);
LDIR-2024-0026 and LDIR-2024-0018].
2. The proposed use shall comply with the specific use standards listed in UDC 11-4-3-9.
Daycare Facility. The applicant or owner shall provide proof of criminal background checks
and fire inspection certificates as required by Title 39, Chapter 11, Idaho Code. Said proof
shall be provided prior to issuance of certificate of occupancy. The applicant or owner shall
comply with all State of Idaho and Department of Health and Welfare requirements for
daycare facilities.
3. The site plan and/or landscape plan, as applicable, shall be revised with the certificate of
zoning compliance application as follows:
i. Depict a minimum 5-foot wide pedestrian walkways from the perimeter sidewalk (along
La Vista Lane and Williams Pipeline pathway) as shown on the concept plan; the
walkways shall be distinguished from the vehicular driving surfaces through the use of
pavers, colored or scored concrete, or bricks as set forth in UDC 11-3A-19B.4.
ii. Additional shrubs and an additional tree are required in the planter island with the fire-
hydrant (a minimum of 1 tree is required per planter island); alternative compliance to
this standard may be requested as allowed in UDC 11-5B-5. Planter islands shall be a
minimum of 50 square feet and dimensioned with future submittals.
iii. Include shrubs and lawn or vegetative groundcover along with the trees within the
landscape strips along the multi-use pathway within the street buffer along the eastern
boundary of the site adjacent to the William pipeline in accord with the standards listed in
UDC 11-3B-12C.
iv. Provide a fencing detail in accord with the standards listed in UDC 11-4-3-9.
v. Stripe the loading zone as parallel parking (9’ by 23’) and install a planter island with a
bulb out to match the southern portion of the loading zone.
vi. Remove the two parking stalls to the north of the trash enclosure to provide an adequate
ingress/egress.
vii. Widen the planter island south of the trash enclosure to 5 feet in accord with UDC 11-3B-
8.
viii. Provide additional parking further west designated as future parking on the concept plan
to provide for adequate ingress and egress for employees, customers, and republic
service.
4. The design of the proposed structures shall comply with the design standards in the
Architectural Standards Manual and the design elements in the Ten Mile Interchange Specific
Area Plan (TMISAP) as noted in the Application of the Design Elements table on pg. 3-49 for
the Mixed Employment (ME) designation, unless otherwise modified in the Development
Agreement (DA).
5. The landscaping within the street buffers along I-84, Grand Mogul Drive and LaVista Lane
should be installed with the subdivision improvements associated with Vanguard Village
Subdivision No. 1. However, if it’s not completed prior to the issuance of the first Certificate
of Occupancy within this development, this developer shall be responsible for those
improvements as required with the final plat (FP-2024-0012).
6. The recent modification to the development agreement (H-2023-0074) shall be approved by
City Council and recorded prior to submittal of the first Certificate of Zoning Compliance
and Design Review application for this site.
7. The applicant shall provide cross access in accordance with 11-3A-3 prior to occupancy of
the building.
8. A 14-foot wide public use easement (10’ pathway + 2’ each side) shall be submitted for the
proposed multi-use pathway within the street buffer within the Williams pipeline easement
prior to issuance of Certificate of Occupancy. Alternatively, this easement may be provided
earlier prior to recordation of final plat application for Vanguard Village Subdivision No. 1.
9. All development within the Williams pipeline easement shall comply with the Williams
Developers’ Handbook.
10. A Certificate of Zoning Compliance and Design Review application(s) shall be submitted and
approved prior to submittal of building permit applications for this site. Building permits may
be issued prior to recordation of the final plat; however, no Certificates of Occupancy shall be
issued prior to recordation of the final plat for the lot on which the building(s) is located, per
requirement of the most recent amendment to the DA (H-2023-0074).
11. The maximum of children allowed to be watched at any one time shall be 125, unless
further restricted by the building department.
12. The Applicant shall commence the use as permitted in accord with the conditions of approval,
satisfy the requirements set forth in the conditions of approval, and acquire building permits
and commence construction of permanent footings or structures on or in the ground within
two (2) years from the date of approval of the subject conditional use permit; or apply for a
time extension prior to that date as set forth in UDC 11-5B-6F in order for the conditional use
permit to remain valid.
B. Meridian Public Works
C. Nampa & Meridian Irrigation District
D. Ada County Highway District (ACHD)
V. FINDINGS
A. Conditional Use (UDC 11-5B-6E)
The commission shall base its determination on the conditional use permit request upon the
following:
1. That the site is large enough to accommodate the proposed use and meet all the dimensional
and development regulations in the district in which the use is located.
Staff finds the site is large enough to accommodate the proposed use and meet all
dimensional and development regulations of the M-E zoning district.
2. That the proposed use will be harmonious with the Meridian comprehensive plan and in
accord with the requirements of this title.
Staff finds the proposed daycare use will be harmonious with the Comprehensive Plan and is
consistent with applicable UDC standards with the conditions noted in Section IV of this
report.
3. That the design, construction, operation and maintenance will be compatible with other uses
in the general neighborhood and with the existing or intended character of the general vicinity
and that such use will not adversely change the essential character of the same area.
Staff finds the design, construction, operation and maintenance of the proposed use should be
compatible with other uses in the general neighborhood, with the existing and intended
character of the vicinity and will not adversely change the essential character of the area.
4. That the proposed use, if it complies with all conditions of the approval imposed, will not
adversely affect other property in the vicinity.
Staff finds the proposed use will not adversely affect other properties in the vicinity if it
complies with the conditions in Section IV of this report.
5. That the proposed use will be served adequately by essential public facilities and services
such as highways, streets, schools, parks, police and fire protection, drainage structures,
refuse disposal, water, and sewer.
Staff finds the proposed use will be served by essential public facilities and services as
required.
6. That the proposed use will not create excessive additional costs for public facilities and
services and will not be detrimental to the economic welfare of the community.
Staff finds the proposed use will not create additional costs for public facilities and services
and will not be detrimental to the economic welfare of the community.
7. That the proposed use will not involve activities or processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property or the general
welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors.
Staff finds the proposed use will not be detrimental to any persons, property or the general
welfare by the reasons noted above.
8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or
historic feature considered to be of major importance.
Staff finds the proposed use will not result in the destruction, loss or damage of any such
features.
9. Additional findings for the alteration or extension of a nonconforming use:
This finding is not applicable.
10. That the proposed nonconforming use does not encourage or set a precedent for additional
nonconforming uses within the area; and,
This finding is not applicable.
11. That the proposed nonconforming use is developed to a similar or greater level of conformity
with the development standards as set forth in this title as compared to the level of
development of the surrounding properties.
This finding is not applicable.
VI. ACTION
A. Staff:
Staff recommends approval of the proposed CUP application and finds it in conformance with the
Comprehensive Plan, UDC with the conditions included in Section IV and Findings in V.
B. Commission:
Pending
VII. EXHIBITS
A. Project Area Maps
(link to Project Overview)
1. Aerial
2. Zoning Map
3. Future Land Use
4. Planned Development Map
B. Service Accessibility Report
C. Site Plan (date: 6/14/2024)
D. Landscape Plan (date: 6/14/2024)
E. Building Elevations (date: 6/14/2024)