HomeMy WebLinkAboutDWG_L1.1 Landscape Details - Franklin Industrial 1 2 3 4 5 6
ROOT FLARE TO ? �
LANDSCAPING NOTES . BE AT SOIL LINE. W � MLno
2'- 3" DEPTH OF MULCH PLANTER BEDS O VJ _ _ ^� _ uj
v � o 'tT � wU
1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR w
FINISH GRADE, SEE CIVIL ;� Q ~
AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. (� _ " o °` U
REMOVE DEAD/DAMAGED r (� ,,;u `. }
2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECTS PRIOR WRITTEN BRANCHES AND PRUNE TO Q U o X a ~ "
APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF APPROVED TOPSOIL AND SOIL SOIL LINE INTERNATIONAL SOCIETY OF = Q m o < ° = Q
SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. AMENDMENTS AS SPECIFIED ARBORICULTURE
3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. STANDARDS; IMPROPERLY
PRUNED TREES (AS
4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION PLANTER BED CUT EDGE DETERMINED BY THE
START-UP. 2
LANDSCAPE ARCHITECT)
5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. SCALE: > 1/2"= 1'-0" SHALL BE REMOVED AND
A REPLACED. DO NOT REMOVE A
6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE REMOVE ANY PLASTIC, BURLAP, NAILS, OR MAIN LEADER.
SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.] OTHER MATERIALS FROM THE ROOTBALL
7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES WHICH MAY LIMIT ROOT GROWTH.
AND CALL OUT SYMBOL NUMBERS. CONSTRUCT 2" EARTH BERM TO FORM A -
8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 3" MINUS BARK MULCH. SUBMIT WATER MULCH RE E CIOFIEB SIN. FILL BERM WITH
SAMPLE FOR APPROVAL. Owcn 10<
9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF o 0 0 _ ~m
U F Zp�a'ZZ(n �
MULCH, PER PLANS, 3" DEPTH OVER ¢F w z p-11 z Z Ln
ACCCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY =z p a w J w
ENTIRE BED. DO NOT COVER CROWNS OF °w w- w a°W' ow o E-<D c,
IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. PLANTS. RUBBER CINCH TIE. mU�o Vwap a zww D�Fp
aa� ,z w=Fw¢
pO�x c[ w�O�F¢xtnU
10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE p o w w� _ z
PROVIDE COMMERCIAL FERTILIIZER 2" X 2" WOOD STAKE ° w a z g B
DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. - TABLETS AND BIOSTIMULANT, AS SPECIFIED w w o W w o z z=w w o
11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 FOR EACH SHRUB. NOT PENETRATE�ROOTBALL . z o a=z w° w z
C7°QF (nUOwp V w°w°ln
SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. SEE NOTE 1. SET STAKES �zaQ ww pwa°
Q �/'1 _. W �p� (A=~W=�W ff1(n J 2
BACKFILL WITH APPROVED TOPSOIL AND \LJ ° z z 3 z 5._ w
_� PARALLEL TO PREVAILING ��=a g2i p�FQ�ZK
12. FERTILIZE ALL TREES AND SHRUBS WITH AGRIFORM PLANTING TABLETS. QUANTITY PER MANUFACTURERS SOIL AMENDMENTS AS SPECIFIED. BACKFILL ,� WIND. °°P� aOU wA Zu-, p
RECOMMENDATIONS. 11 - IN 6" LIFTS, WATER EACH LAYER, AND DO zz000� ��n°wo�z���
13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18 DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM NOT TAMP OR OVER COMPACT. zzoaw wp<ZoCz7waa 0Jw
_ REMOVE TREE WRAP TRUNK g p z 0 F Ln Z w�-�==�
w C7ou �.. pp�x�wlnw
12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE PROTECTION, AFTER �a�pU w�a Z=Z~O ZO�'T
�� CONSTRUCT 6" MOUND OF TOPSOIL. INSTALLATION. °a a a =o o zu Z 0 U o z o
BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2 BELOW ADJACENT SURFACES OF TURF SOD O
AREAS AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS. WIDTH OF w 0� CONSTRUCT 2" EARTH BERM
14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN 3'-0" ROOTBALL 3'-0" U� AT EDGE OF ROOTBALL. FILL ••••..• �'O"F" ++.+,��
TREE RING W/ MULCH AS •• ,�� IQ •,
QUANITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. z SPECIFIED. O•,,•
PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. NOTES : Q 3" THICK MULCH LAYER, KEEP s`
TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS 1. SHRUB SHALL BEAR THE SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. �,m MULCH 3" AWAY FROM
TRUNK.
WEED SEEDS, ROCKS, GRASS, OR OTHER FOREIGN MATERIAL AND HAVE A PH OF 5.5 TO 7.0. IF ONSITE 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. O -169
TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: 3. THIN BRANCHES AND FOLIAGE BY 1/3. ~ WIDER HOLE IF SOIL IS �'•,,� •••`
A) PROVIDE APPROVED IMPORTED TOPSOIL, OR: 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. COMPACTED. +�gNAQ�A�•.••
B B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. 5. FOR CONTAINER GROAN PLANTS THAT ARE ROOTBOUND SPLIT THE ROOTBALL WITH 3 B
15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL EQUAL SPACED VERTICAL CUTS.
LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER,
FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS SHRUB PLANTING
TOXIC MATTER HARMFUL TO PLANT GROWTH:
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO SCALE: 3/4'' = F-0" _
THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY WELL-DRAINED SITES - COMMERCIAL SLOW RELEASE
� o
A d w FERTILIZER TABLETS.
TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES: Lu
0
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE J U
A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS ~ a . .
AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. Q + + a Ln
TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. o O Q
ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. o FINISH GRADE, SEE CIVIL. LL
16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE GROUNDCOVER PLANTING PER WIDTH WIDTH WIDTH WIL�THI W DTH z En
OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. m + PLANTING PLAN. OF BALL OF BALL OF BALL OF BALL OF BALL 2:
17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR =1
MULCH, PER PLANS, 3" DEPTH 5' MIN. DIA. 0
FACILITIES. PLAN OVER ENTIRE BED. DO NOT TREE RING J
18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE COVER CROWNS OF PLANTS.
CONSTRUCTIONND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. TILL SOIL TO A DEPTH OF 12". NOTES : m
19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. a� _ BACKFILL WITH APPROVED J Z
TOPSOIL AND SOIL 1. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2/3 OF ROOTBALL. REMOVE ALL NAILS,
AMENDMENTS AS SPECIFIED. TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE Q
TOPSOIL NOTES : M _ SUBGRADE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADABLE BURLAP SHALL BE LEFT
ON THE BOTTOM OF THE ROOTBALL. ~ z
1. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS
MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS SECTION RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN b
HARMFUL TO PLANT GROWTH. STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION z
2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY '>-'
C SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, NOTES : 3. IN THE EVENTOF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS THE CONTRACTOR IS TO C
BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 Q W Z
INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER IN A NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. Z
TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. TRIANGULAR PATTERN. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO
3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S INSTALLATION OF PLANT MATERIAL.
RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS RECOMENDATIONS TO ALL GROUNDCOVER BEDS. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE
AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH LjLm
CONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. GROUND COVER PLANTING GALVANIZED NAILS TO PREVENT SLIPPAGE.
RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURREQUIREMENTS HAVE BEEN MET. NO TOPSOIL SCALE: 3/4" - Y-0" 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE
4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING IRRIGATION NOTES : ARCHITECT IMMEDIATELY.
DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8 -0 IN WIDTH, PROVIDE TREE
FINISH GRADE, AS REQUIRED. 1. GROUND SPRINKLER SYSTEM WHICH INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR ROOT BARRIER (DEEPROOT w
S. COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF :2
REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL o
A' LAWN AREAS: 9 INCHES MINIMUM OR AS NECESSARY TO ACHIEVE EVEN GRADES WITH SURROUNDING SIDEWALK. ALL TREE INSTALLATIONS
STATIONS.
LAWN AREAS. SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS CONTRACTOR SHALL VERIFY PRIOR z �'
B) PLANTER BEDS: 18 INCHES MINIMUM TO ANY INSTALLATIONS.
2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES. O
6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS DECIDUOUS TREE PLANTING
AND 18" AT PLANTER BEDS.
RIDGES AND FILL DEPRESSIONS AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL o
BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND 1" FOR SEED. 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, SCALE: 3/4" = Y-0"
PERENNIALS GROUND COVERS OR SHRUB MASSINGS SHALL HAVE APOP-UP SPRAY SYSTEM. N
7. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM WEED ABATEMENT NOTES: o
PLAN. Q
8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE CONTROLLER REQUIREMENTS ARE AS FOLLOWS: w a
STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR A) PRECISE INDIVIDUAL STATION TIMING. Q
TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING B) RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES. 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS
CONTAMINATED WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO C) AT LEAST ONE PROGRAM FOR EACH HYDROZONE. ON THEM PRIOR TO PLANTING OR HYDROSEEDING. DATE: JAN. 2024
LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. D) SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH "ROUND UP (CONTACT HERBICIDE) OR DRAWN BY:CHECKED BY: LL,WTIST
LH
p E) POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL EQUAL. D JOB NUMBER: 19158
BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
F)THE CONTROLER USED SHALL BE A "WATERSENSE" APPROVED CONTROLLER WITH A FLOW 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN SHEET TITLE
CONTROL VALVE FOR PRESSURE IRRIGATION SYSTEM. DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE
6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE DAYS. LANDSCAPE
WATER TO RESPECTIVE HYDRO-ZONES. 5. APPLY SECOND APPLICATION OF "ROUND UP" TO ALL EXPOSED WEEDS. APPLY IN STRICT DETAILS
7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN
TRIANGULAR SPACING. DAYS. REMOVE WEEDS FROM THE SITE.
8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR
(BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). DIRECTED TO PERFORM A THIRD APPLICATION. SHEET NUMBER
9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH
Q.C.V. LOCATIONS WITH LANDSCAPE ARCHITECT. TRIANGULAR SPACING.
8. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE.
SHEET
1 2 3 4 5 6