HomeMy WebLinkAboutCC - Engineers Statement km
E N G I N E E R I N G
July 17,2024
Project No.24-120
City of Meridian
33 E Broadway Ave.,Ste.210
Meridian, Idaho 83642
RE: Prescott Ridge Subdivision No.4
Meridian,Idaho
To Whom It May Concern:
Please accept this letter as certification that the centerline elevations of the proposed streets within Prescott
Ridge Subdivision No. 4 are designed a minimum of three (3) feet above the seasonal high ground water
elevation. The geotechnical report, "Geotechnical Recommendations Report Prescott Ridge Subdivision
Chinden and McDermott—Meridian, Idaho", prepared by Site Consulting, LLC and dated August 10,2021,was
used to determine the approximate groundwater elevations relative to the street centerline elevations.
Please feel free to contact me at 208.639.6939 should you have questions or require any additional information.
Sincerely,
KM Engineering,LLP
S\ONAL £
\STER o�y�^ Digitally signed by
Matthew Derr
1 9 Date: 2024.07.17 15:56:58
of °" -06'00'
9TTyEW S.
Matthew Derr,P.E.
Project Engineer