Loading...
HomeMy WebLinkAboutCC - Engineers Statement km E N G I N E E R I N G July 17,2024 Project No.24-120 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Prescott Ridge Subdivision No.4 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Prescott Ridge Subdivision No. 4 are designed a minimum of three (3) feet above the seasonal high ground water elevation. The geotechnical report, "Geotechnical Recommendations Report Prescott Ridge Subdivision Chinden and McDermott—Meridian, Idaho", prepared by Site Consulting, LLC and dated August 10,2021,was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP S\ONAL £ \STER o�y�^ Digitally signed by Matthew Derr 1 9 Date: 2024.07.17 15:56:58 of °" -06'00' 9TTyEW S. Matthew Derr,P.E. Project Engineer 5725 North Discovery Way• Boise,Idaho 83713 0 208.639.6939 0 kmengllp.com